About Wrigley Field Renovation Phase 4
1060 W Addison St, Chicago, IL
Phase 4 Renovations Of Existing Wrigley Field Ballpark:
Renovation Of Concourse Level Column Lines 34 To 40 And A-D As Per Plans;
Replacement Of Lower Bowl From Column Lines 7 To 22 And 40 To 53 As Per Plans;
Renovation Of Suites From Column Lines 23 To 35 As Per Plans;
Buildout Of Clubhouse Level, Column Lines 22 To 40 As Per Plans.
1060 West Addison Street Overview
Contacts (Sign up for PRO to see this --> property's <-- 37 contacts)
Key Data, Images & News
Basic Details
Related Projects (6)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
BLDUP Latest Activity
Permit Details: SPR 2019 CBC: INTERIOR ALTERATIONS TO AN EXISTING STORAGE SPACE AND OFFICE CLOSET TO BE CONVERTED INTO SENSORY ROOM IN WRIGLEY FIELD BUILDING AS PER PLANS.
Related Documents (48)
101042659
Permit Details: SPR 2019 CBC: INTERIOR ALTERATIONS TO AN EXISTING STORAGE SPACE AND OFFICE CLOSET TO BE CONVERTED INTO SENSORY ROOM IN WRIGLEY FIELD BUILDING AS PER PLANS.
101038324
Permit Details: INSTALL NEW PANELS & INFRASTRUCTURE FOR NEW LIGHTING PACKAGES & CONTROL CABINETS
101032764
Permit Details: SPR 2019 CBC OCCUPANCY A4 SPORTS STADIUM REMOVE AND REPAIRS TO CANOPY INSIDE THE STADIUM AS PER PLANS
101035713
Permit Details: PERMIT EXPIRES ON 12/20/2023 ERECTION STARTS: 11/13/2023, ERECTION ENDS: 1/17/2024. CHICAGO CUBS- WINTERLAND 2023TENT- PEER REVIEW- 49 DAY EVENT (11/20/2023-01/8/2024) ERECT THREE (3) STRUCTURES, TWO (2) 20X40 FRAME CANOPIES, ONE (1) 66X99 (20MX30M) STRUCTURE TENT SETUP 11/13/2023- REMOVE 1/17/2024 ASSEMBLY
101031310
Permit Details: NEW CAMERA PLATFORM STRUCTURE ADJACENT TO THE EXISTING CAMERA PLATFORM IN CENTER FIELD OF THE OUTFIELD BLEACHERS IN WRIGLEY FIELD STADIUM AS PER PLANS.
101027865
Permit Details: PERMIT EXPIRES ON 10/25/2023 Erection Starts: 8/21/2023, Erection Ends: 8/26/2023. ERECTION STARTS: , ERECTION ENDS: . ***SELF-CERT***ERECTION STARTS:08/21/23, ERECTION ENDS:08/26/23ERECTION OF TEMPORARY STAGE FOR A JONAS BROTHERS CONCERT AT WRIGLEY FIELD, EVENT DATES AUGUST 25TH, 2023 OVERALL AREA: 12,034 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) COVERED TECH HUTS: (2) X 768 = 1,536 SF4.) FRONT OF HOUSE (F.O.H.) TECH HUT: 768 SF5.) THRUST STAGE: 770 SF
101027828
Permit Details: PERMIT EXPIRES ON 10/21/2023 ***SELF-CERT*** ERECTION STARTS:08/21/23, ERECTION ENDS:08/26/23 ERECTION OF TEMPORARY STAGE FOR A GUNS N' ROSES CONCERT AT WRIGLEY FIELD, EVENT DATES AUGUST 24TH, 2023 OVERALL AREA: 11,264 SQ.FT., INCLUDING 1.) MAIN STAGE: 4,480 SF 2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF 3.) COVERED TECH HUTS: (2) X 768 = 1,536 SF 4.) FRONT OF HOUSE (F.O.H.) TECH HUT: 768 SF
101028621
Permit Details: TEMP POWER FOR JONAS BROTHERS.
101026711
Permit Details: PERMIT EXPIRES ON 10/09/2023 ***SELF-CERT***ERECTION STARTS:08/06/23, ERECTION ENDS:08/13/23ERECTION OF TEMPORARY STAGE FOR A BRUCE SPRINGSTEEN CONCERT 2023, EVENT DATES AUGUST 9TH & 11TH, 2023OVERALL AREA: 16,156 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) COVERED TECH HUTS: (2) X 768 = 1,536 SF4.) FRONT OF HOUSE (F.O.H.) TECH HUT: 768 SF5.) THRUST/APRON STAGE: 3,158 SF6.) 64' TALL DELAY TOWERS: (3) X 578 SF = 1,734 SF
101026338
Permit Details: PERMIT EXPIRES ON 10/04/2023 SELF-CERT ERECTION STARTS:08/06/23, ERECTION ENDS:08/13/23ERECTION OF TEMPORARY STAGE FOR A PINK CONCERT 2023, EVENT DATES AUGUST 12TH, 2023OVERALL AREA: 12,446 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) COVERED TECH HUTS: (2) X 768 = 1,536 SF4.) FRONT OF HOUSE (F.O.H.) TECH HUT: 768 SF5.) THRUST STAGE: 1,182 SF
101019158
Permit Details: PERMIT EXPIRES ON 08/15/2023 Erection Starts: 6/18/2023, Erection Ends: 6/24/2023. ERECTION STARTS: , ERECTION ENDS: . ***SELF-CERT*** ERECTION STARTS:06/18/23, ERECTION ENDS:06/24/23ERECTION OF TEMPORARY STAGE FOR A FALL OUT BOY CONCERT 2023, EVENT DATES JUNE 21ST, 2023OVERALL AREA: 10,496 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) FOH COVERED TECH HUT: (2) X 768 = 1,536 SF
101019165
Permit Details: PERMIT EXPIRES ON 08/12/2023 Erection Starts: 6/18/2023, Erection Ends: 6/24/2023. ERECTION STARTS: , ERECTION ENDS: . ERECTION STARTS:06/18/23, ERECTION ENDS:06/24/23ERECTION OF TEMPORARY STAGE FOR A MORGAN WALLEN CONCERT 2023, EVENT DATES JUNE 22-23RD, 2023OVERALL AREA: 13,250 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) COVERED TECH HUTS: (2) X 768 = 1,536 SF4.) FRONT OF HOUSE (F.O.H.) TECH HUT: 768 SF5.) LED THRUST STAGE AND APRON: 1,986 SF
101017784
Permit Details: PERMIT EXPIRES ON 08/07/2023 ERECTION STARTS:06/06/23, ERECTION ENDS:06/11/23 ERECTION OF TEMPORARY STAGE FOR A DEAD & CO. CONCERT 2023 AT WRIGLEY FIELD, EVENT DATES JUNE 9TH & 10TH, 2023OVERALL AREA: 10,496 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) FOH COVERED TECH HUT: (2) X 768 = 1,536 SF
101013033
Permit Details: TEMP POWER FOR MORGAN WALLEN
101013031
Permit Details: TEMP POWER FOR BRUCE SPRINGSTEEN
101013036
Permit Details: TEMP POWER FOR GUNS N ROSES
101013034
Permit Details: TEMP POWER FOR PINK
101013030
Permit Details: TEMP POWER FOR FALL OUT BOY
101013029
Permit Details: TEMP POWER FOR DEAD & CO
101010616
Permit Details: FURNISH AND INSTALL A NEW CONCRETE PLATFORMS AND RAILINGS FOR WHEELCHAIR SEATINGS ON UPPER DECK IN WRIGLEY FIELD BUILDING AS PER PLANS.
101001676
Permit Details: INTERIOR REMODELING AND ALTERATIONS TO AN EXISTING BATHROOM AND OFFICE SPACE TO BE CONVERTED INTO WOMEN'S LOCKER ROOM IN WRIGLEY FIELD BUILDING AS PER PLANS.
100994612
Permit Details: PERMIT EXPIRES ON 01/08/2023 ERECTION STARTS: 11/7/2022, ERECTION ENDS: 1/9/2023. SELF CERT. WINTERLAND SLED HILL SCAFFOLD AT WRIGLEY FIELD. 1- 30FT X 76FT SCAFFOLD SLED HILL 14FT TALL WITH RAMP. HICKORY STREET CAPITAL PLAZA BUILDING OPERATIONS WITH SHAMROCK DECORATING INC. **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPEPCTION **** AOR CERTIFICAE OF INSPECTION REQUIRED ****
100992762
Permit Details: PERMIT EXPIRES ON 12/20/2022 ERECTION STARTS: 11/1/2022, ERECTION ENDS: 1/18/2023. TENT- PEER REVIEW- 61 DAY EVENT (11/18/2022-01/18/2022) HSC PLAZA & BLDG OPS- WINTERLAND 2022ERECT ONE (1) 66X82 (20MX25M) STRUCTURE TENT SETUP 11/1/2022- REMOVE 1/18/2023 ASSEMBLY
100983857
Permit Details: PERMIT EXPIRES ON 10/22/2022 ERECTION STARTS: 8/31/2022, ERECTION ENDS: 9/4/2022. ERECTION STARTS: 8/31/2022, ERECTION ENDS: 9/4/2022. ERECTION STARTS: , ERECTION ENDS: . ***SELF-CERT*** ERECTION OF TEMPORARY STAGE AT WRIGLEY FIELD FOR A 09/03/22 THE LUMINEERS CONCERT. ERECTION STARTS: 08/31/22 ENDS: 09/04/22OVERALL AREA: 12,701 SQ.FT., INCLUDING:1.) MAIN STAGE: 9,280 SF2.) TECH HUT: (2) X 768 =1,536 SF3.) RUNWAY THRUST STAGE: 1,117 SF4.) FOH COVERED TECH HUT: 24'X32'= 768 SF **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
100983631
Permit Details: TEMP POWER FOR LUMINEERS CONCERT
100981963
Permit Details: PERMIT EXPIRES ON 10/04/2022 Erection Starts: 8/12/2022, Erection Ends: 8/16/2022.ERECTION OF TEMPORARY STAGE AT WRIGLEY FIELD FOR A 08/15/22 LADY GAGA CONCERT. ERECTION STARTS: 08/12/22 ENDS: 08/16/22OVERALL AREA: 12,896 SQ.FT., INCLUDING:1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480 SF3.) MAIN STAGE APRON: 2,16 SF4.) THRUST STAGES: (2) X 572 SF = 1,152 SF5.) FOH COVERED TECH HUT: 24'X32'= 768 SF **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
100979990
Permit Details: MAINTENANCE
100978977
Permit Details: PERMIT EXPIRES ON 09/13/2022 Erection Starts: 7/20/2022, Erection Ends: 7/24/2022.ERECTION OF TEMPORARY STAGE AT WRIGLEY FIELD FOR A CHRIS STAPLETON CONCERT. ERECTION STARTS: 07/20/22 ENDS: 07/24/22 OVERALL AREA: 10,496 SQ.FT., INCLUDING:1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480 SF3.) FOH COVERED TECH HUT: (2) X 768 SF = 1,536 SF **** SELF CERTFICATION **** CONDITINAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
100976614
Permit Details: PERMIT EXPIRES ON 08/24/2022 ERECTION STARTS: , ERECTION ENDS: . ERECTION OF TEMPORARY STAGE AT WRIGLEY FIELD FOR A DEF LEPPARD & MOTLEY CRUE CONCERT. ERECTION STARTS: 07/05/22 ENDS: 07/10/22OVERALL AREA: 11,159 SQ.FT., INCLUDING:1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480 SF3.) FOH COVERED TECH HUT: (2) X 768 SF = 1,536 SF4.) THRUST STAGE: (1) 663 SF **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
100976647
Permit Details: PERMIT EXPIRES ON 08/24/2022 ERECTION STARTS: , ERECTION ENDS: . ERECTION OF TEMPORARY STAGE AT WRIGLEY FIELD FOR A ZAC BROWN BAND CONCERT. ERECTION STARTS: 07/05/22 ENDS: 07/10/22OVERALL AREA: 11,072 SQ.FT., INCLUDING:1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480 SF3.) FOH COVERED TECH HUT: (2) X 768 SF = 1,536 SF4.) THRUST STAGE: (2) X 288 SF = 576 SF **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INPSECTION REQUIRED ****
100973161
Permit Details: PERMIT EXPIRES ON 08/21/2022 ERECTION STARTS:6/21/22 , ERECTION ENDS:6/26/22 . 2021 PERMIT#100931140 REINSTATEMENT OF 2021 DEAD & CO. CONCERT AT WRIGLEY FIELDINSTALL START: 06/21/22 REMOVAL: 06/26/22ERECTION OF TEMPORARY STAGE FOR A DEAD & CO. CONCERT 2022OVERALL AREA: 10,496 SQ.FT., INCLUDING1.) MAIN STAGE: 4,480 SF2.) WING STAGE DECK: (2) X 2,240 SF = 4,480SF3.) FOH COVERED TECH HUT: (2) X 768 = 1,536 SF **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
100970240
Permit Details: INTERIOR ALTERATIONS AND REMODELING TO AN OWNER'S SUITE ON CLUBHOUSE LEVEL IN WRIGLEY FIELD BUILDING AS PER PLANS.
100972598
Permit Details: TEMP POWER FOR ZAC BROWN BAND CONCERT.
100972600
Permit Details: TEMP POWER FOR CHRIS STAPLETON CONCERT.
100972594
Permit Details: TEMP POWER FOR DEAD & CO. CONCERT
100972596
Permit Details: TEMP POWER FOR MOTLEY CRUE CONCERT.
100972601
Permit Details: TEMP POWER FOR LADY GAGA CONCERT.
100971565
Permit Details: MAINTENANCE
100965651
Permit Details: MAINTENANCE
100959644
Permit Details: ***DIRECT DEVELOPER SERVICES*** CONCOURSE IMPROVEMENTS ON EXISTING 100 LEVEL OF WRIGLEY FIELD. WORK TO INCLUDED SELECT DEMO & CONSTRUCTION OF NEW PARTITIONS, FINISHES, & PLUMBING; AS PER PLANS. CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING
100961026
Permit Details: MAINTENANCE
100959339
Permit Details: INSTALL CO2 SENSOR AT COOLERS/FREEZERS/REFRIGERATION.
100957252
Permit Details: MAINTENANCE
100947144
Permit Details: MAINTENANCE
100894376
Permit Details: MONTHLY MAINTENANCE PERMIT FOR THE PERIOD OF OCT-DEC 2020 FOR WORK COMPLETED BY AT&T AT CUBS FIELD ANY QUESTIONS PLEASE CALL TIM CGUIRE(SUPERVISING ELECTRICIAN AT&T) 708-465-2229
100890342
Permit Details: MAINTENANCE
100882598
Permit Details: MAINTENANCE
100880166
Permit Details: MONTHLY MAINTENANCE PERMIT FOR THE PERIOD OF JULY-SEPT 2020 FOR WORK COMPELTED BY AT&T AT 1060 W ADDISON ANY QUESTIONS PLEASE CALL TIM MCGUIRE(SUPERVISING ELECTRICIAN T&T) 312-220-2408