MIT.nano

Property Page

About MIT.nano

222 Memorial Drive, Kendall Square, Cambridge, MA 02142

 

MIT.nano is a four-story, 200,000 square foot state-of-the-art facility for nanotechnology, materials science and engineering systems research. 

The basement level contains nanoscale imaging facilities, the first and second floors contain clean rooms and the third floor contains maker spaces and teaching labs. MIT.nano’s top floor houses the building’s mechanical system units. 

A new courtyard for the MIT community has been constructed as part of the project. MIT.nano occupies the footprint of MIT’s former Building 12, which was demolished in 2015.

Construction of MIT.nano’s basement used materials that limit vibration and electromagnetic interference to meet requirements for nanoscale imaging. 

The building’s air filtration and ventilation system feature state-of-the-art environmentally sustainable features including heat recovery for building exhaust, variable drives on motors to minimize energy consumption based on need, lowest pressure drop ductwork and properly sized exhaust devices for optimal efficiency. 

LEED certification for MIT.nano is in progress.

 

The following is a building section showing facilities on each floor of MIT.nano:

 

MIT-nano-rendering-3

Building section

 

 

The following are renderings of MIT.nano:

 

MITnano Renderings

222 Memorial Drive Overview

Last Update: 01/23/24
Permitted Construction:
Construction Status:
Sectors:

Organizations Working On 222 Memorial Drive

Architects:
General Contractors:
Developers:
Graphics/Signage:

Contacts (Sign up for PRO to see this --> property's <-- 1 contacts)

Key Data, Images & News

Basic Details

Stories : *
Construction Cost : ***************
Completion Date : ********

PRO Data

Latest News 2

View News Articles With A PRO Membership

When you upgrade, you get access to all news articles. BLDUP writes about the latest developments in your market in realtime.

TRY PRO NOW

Apr 20, 2017

Curtain wall installed at MIT.nano, interior fit out underway

Read More >>

Aug 06, 2016

MIT.nano topped off, concrete floor pouring and sheathing installation underway

Read More >>