About Clippership Wharf
25-65 Lewis Street, East Boston, Boston, MA 02128
Mixed-use development project on a 12-acre East Boston Waterfront site overlooking Boston Harbor and the Boston skyline. The under-construction project will have four buildings total and will feature 478 residences with approximately 30,200 square feet of retail and community space, including a cafe and a restaurant. Residences will include 284 apartments and 194 condominiums, including studios, one-bedrooms, and two-bedrooms. Phase 1 of Clippership Wharf will construct three buildings containing 284 rental apartments and one building containing 80 condominiums. Phase 2 will construct a fourth building containing 114 condos.
The condominiums at Clippership Wharf, dubbed Slip65 & Slip45, will include one-bedrooms and two-bedrooms outfitted with top-of-the-line finishes and graced with sweeping waterfront views throughout. Residences will feature oversized windows and chef-level kitchens including stainless steel Whirlpool appliances, quartz countertops, distinctive tile backsplashes, and custom cabinetry. Resident amenities will include indoor and outdoor gathering areas, a fitness and social club and ample bike storage.
The Clippership Wharf project will include over four acres of waterfront open space, including a new Harborwalk extension and waterfront transportation dock. A total of 321 vehicle parking spaces will be built on site; 300 spaces will be located in an underground parking garage. 20 underground parking spaces will be public. Zipcars will be available on site. Clippership Wharf is located steps to the Maverick Square MBTA Blue Line station, a three-minute train ride to Downtown Boston, with direct access to water taxi service.
Renderings of Clippership Wharf:
Site plan of Clippership Wharf:
25 Lewis Street Overview
Organizations Working On 25 Lewis Street
Contacts (Sign up for PRO to see this --> property's <-- 7 contacts)
Key Data, Images & News
Basic Details
PRO Data
Latest News 28
Jul 13, 2021
Clippership Wharf Opens as Construction Finishes in East Boston
Mar 18, 2021
Construction on Clippership Wharf to Wrap Up this Spring
Dec 21, 2020
Exterior Work Nears Completion on 14 Clippership Wharf
Dec 16, 2020
Exterior Framing Wrapping Up on 63 Clippership