14801 Clopper Road Overview
BLDUP Latest Activity
Permit Details: Customer Wants To Use ePlans,Construct a pole barn. A sediment control permit is not required per Mark Etheridge, Manager of the Water Resources Section. The sediment control number entered was only entered to bypass the system requirement and is not applicable to this site.