529 Rolling Hills Drive Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 09/20/23 to Ownership.

Permit Details: Pump and crush the existing tanks. Tie into existing inlet and install to 1200 gallon Class One tank (500GPD). Install outlet to 6-hole distribution box and 500’ of 15” chamber drain field with a curtain drain above.