4700 Pittman Road Overview

Permitted Construction:

Contacts (Sign up for PRO to see this --> property's <-- 2 contacts)

BLDUP Latest Activity

A permit for the amount of $0.00 was issued on 04/11/24 to Ownership.

Permit Details: Since work is on residential street and Contractor has Annual Traffic Control stickers, no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. Traffic control and signage complying with Part 6 of MUTCD will still be necessary; however, no traffic control permit is required. If two-way directional traffic flow cannot b e maintained, Contractor shall obtain traffic control permit via Compass KC for work in roadway prior to performing excavation work. Work will be completed in less than 72 hours.