2013 Fenton Street Overview

Permitted Construction:

Contacts (Sign up for PRO to see this --> property's <-- 1 contacts)

BLDUP Latest Activity

A permit for the amount of was issued on 05/17/24 to Ownership.

Permit Details: 80-418703 Tub/Wall/Fixture -Bathtub & Tub/Shower Valve Replacement - Any new water distribution pipe and fittings will comply with one of the referenced standards listed in OPC table 605.4 or 605.5. Any new valves will comply with one of the referenced standards listed in OPC table 605.7. Valve locations will comply with OPC section 606. New bathtub will comply with one of the referenced standards listed in OPC 407.1. Bathtub valve will comply with the requirements in OPC 424.5. All new DWV pipe and fittings will comply with one of the referenced standards listed in OPC table 702.1, table 702.2, and 702.4 as applicable. Compartment wall covering will comply with OPC 417.4.1. Rough-in and Final plumbing inspections required.