A permit for the amount of was issued on 12/13/23 to
Ownership.
Permit Details: Project Magellan Building Permit/Plan Review: AlTC2309686 This Plan Revision Includes but not limited to the following: Previously issued Data Center (DC) Plumbing IFP drawings (dated 2023-02-24) were not originally submitted. This Bulletin includes the original DC Plumbing IFP drawings as part of this submission. * Revise the Civil, Structural, Architectural, Mechanical and Electrical drawings in the Mechanical Yard to add future 8th MCP building. The bulletins currently only revise the underground and civil drawings to accommodate the 8th MCP at a future date. * Revise the Structural, Architectural, Signage, Mechanical and Electrical drawings in the Electrical Yard per owner directed Generator allocation changes: One generator in Zone 1 will be relocated to Zone 2. This will enable two (2) future generator pads in Zone 2. * Add a Add 2nd Entry-Exit Point (overhead coiling door) to the Material Trap Room and Server Hall. * Delete the wall and door between the Loading Dock and the Unassigned space to the north. The wall and door will be relocated further north adjacent to the IDF room. * Delete redundant door to Janitors closet 1-505. This janitors closet should only be accessible from one side. * Add additional security cameras in the DCOPS Shop. This room will serve as a temporary storage space. * Separate mechanical drawings to update the chilled water pipes per owner directed revisions.