A permit for the amount of was issued on 10/16/20 to
Ownership.
Permit Details: PRIOR TO ANY DEMOLITION WORK, AN AMENDED PERMIT IS REQUIRED TO DOCUMENT THE WATER DISCONTINUOUS PERMIT. FOR THE COMPLETE DEMOLITION OF AN 4 STORY ATTACHED STRUCTURE. STRUCTURE TO BE DEMOLISHED BY HAND AND BY MECHANICAL MEANS (SEE SITE SAFETY DEMOLITION PLAN FOR DETAILS). PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POSTING AND NOTICE REQUIRED * NEWLY EXPOSED WALLS TO BE TREATED *ASBESTOS ABATEMENT REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK.