30 Irene Boulevard Overview
Contacts (Sign up for PRO to see this --> property's <-- 2 contacts)
BLDUP Latest Activity
Permit Details: Raise the meter a minimum of 10" off the floor. We will use flare fitting up to the 90 for the meter. We will install 2 isolation valves, draw off, dual check valve, expansion tank and will use 3/4" copper on vertical line. Will also be installing number 30 expansion tank. Actively leaking.