3106 Lincoln Street Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 02/02/21 to Ownership.

Permit Details: Stefani Seethaler Re-roof Re-roof Front Section Home/Tear-Off: 1. We will bring in our own dumpster, and the existing roofing will be torn off down to the wood deck and hauled away. 2. New 7/16” OSB will be installed as new plywood decking. 3. A 3' strip of ice and water protective underlayment will be installed to the wood deck on the eave edges and 3’ in the valleys. 4. A synthetic roofing felt will be nailed to the wood deck as underlayment. 5. New drip metal will be installed at the roof edges, new metal will have a 12” strip of ice and water protective underlayment installed over the top at the eave edges. 6. New CertainTeed Landmark architectural style asphalt shingles will be installed in accordance with manufacturer's specifications. The new shingles will be fastened with six nail(not staples) per shingle for increased wind resistance. All nails to be galvanized, large-head, roofing nails. 7. Galvanized metal step shingles will be installed where vertical walls intersect the sloped roof deck. 8. New Colorklad metal counter-flashing will be installed. 9. New galvanized metal flashings will be installed on all pipes and vents that penetrate the roof. 10. New ridge vents will be installed on the upper roof ridges to provide attic ventilation. 11. Roof ridges will be covered with pre-cut hip and ridge shingles. 12. All roofing debris will be removed from the premises and the job site will be left neat and clean