1543 Key Boulevard Overview
Address:
1543 Key Boulevard
Related Projects (6)
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
View Related Projects With A BASIC Membership
When you upgrade, you get access to all Related Projects.
Related Documents (3)
CO2100141
A permit for the amount of $0.00 was issued on 03/08/21 to Ownership.
Permit Details: APARTMENT UNIT
Permit Details: APARTMENT UNIT
F2000836
A permit for the amount of $7,000.00 was issued on 11/19/20 to Ownership.
Permit Details: TWELVE (12) SPRINKLER HEADS - INSTALL NEW WET AUTOMATIC FIRE SPRINKLER SYSTEMS THROUGHOUT AN EXISTING RESIDENTIAL BUILDING. THE SCOPE OF THE PROJECT INCLUDES ADDING 1 DWELLING UNIT IN THE BASEMENT OF EACH NUMBER. 5 TOTAL DWELLING UNITS WILL BE ADDED. THE AREA OF THE BUILDINGS WILL REMAIN UNCHANGED. THIS IS A LEVEL 2 ALTERATION AND CHANGE OF OCCUPANCY SPECIAL INSPECTIONS REQUIRED
Permit Details: TWELVE (12) SPRINKLER HEADS - INSTALL NEW WET AUTOMATIC FIRE SPRINKLER SYSTEMS THROUGHOUT AN EXISTING RESIDENTIAL BUILDING. THE SCOPE OF THE PROJECT INCLUDES ADDING 1 DWELLING UNIT IN THE BASEMENT OF EACH NUMBER. 5 TOTAL DWELLING UNITS WILL BE ADDED. THE AREA OF THE BUILDINGS WILL REMAIN UNCHANGED. THIS IS A LEVEL 2 ALTERATION AND CHANGE OF OCCUPANCY SPECIAL INSPECTIONS REQUIRED
B2001234
A permit for the amount of $38,446.66 was issued on 06/01/20 to Ownership.
Permit Details: REMOVE EXISTING ROOFING MEMBRANE, INSTALL NEW EPDM MEMBRANE OVER INSULATION. NO CHANGES WILL BE MADE TO THE STRUCTURE OR ROOF PENETRATIONS.
Permit Details: REMOVE EXISTING ROOFING MEMBRANE, INSTALL NEW EPDM MEMBRANE OVER INSULATION. NO CHANGES WILL BE MADE TO THE STRUCTURE OR ROOF PENETRATIONS.