BLDUP Latest Activity
Permit Details: The purpose of this plan is to install clean earth fill material from US Rt. 460 construction. The fill area and associated erosion control measures will disturb approximately 8 acres. Of these 8.05 acres, 3.15 will be flat. 4.9 acres will be 2:1 fill, sediment traps, or left unchanged and classified as managed turf. After the project is finished all areas will revert back to a forested condition. Construction will be performed by EC Pace.