11133 Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 06/10/22 to Ownership.

Permit Details: PUD proposes to install a new 115kV transmission line (Phase 1) between the North Camano Substation located at 525 E North Camano Drive, and the North Stanwood Substation in downtown Stanwood. A portion of an existing 115kV line will be rebuilt (Phase 2) along the north side of SR532 and the north side of Lovers Road/276th St NW. Within Snohomish County, 23 existing poles will be removed, 49 new poles will be installed, and 9 existing poles will be re-wired in 74 distinct work areas. This project was originally submitted on July 21, 2016 and was assigned project numbers 16-113034 SHOR, 16-113035 LDA, and 16-113038 FZ. Funding for the project was delayed several times, so it was never resubmitted for second review. The original permit applications expired. Associated LDA & Shoreline permit App ID: 939319