9103 Overview
BLDUP Latest Activity
Permit Details: Repair piles as needed by sleeving with HDPE pipe and filling with concrete. Repair caps and stringers as needed. Replace the existing solid wood-plank decking (568 SF) with Thru-Flow grated decking (43% open space). Add intermediate stringers to support the grated decking. Like for like. No change in footprint. Includes clearing & grading. Does not include plumbing, mechanical or electrical.