8401 Paine Field Boulevard Overview

Permitted Construction:

BLDUP Latest Activity

A permit for the amount of was issued on 10/26/23 to Ownership.

Permit Details: An entire hotel TI that will be done in 4 stages. Every fixture will be like for like except for 8 showers will have the valve moved for an ADU upgrade.