ROW202104183
ELC202101841
A permit for the amount of was issued on 04/19/21 to Ownership.
Permit Details: SOLAR - MARTIN
Installation of rooftop Solar Photovoltaic System consisting of (35) Silfab 330W b/b & (35) Enphase IQ7+
Permit Details: SOLAR - MARTIN
Installation of rooftop Solar Photovoltaic System consisting of (35) Silfab 330W b/b & (35) Enphase IQ7+
ROW202002637
A permit for the amount of was issued on 03/04/21 to Ownership.
Permit Details: NEW DRIVEWAY 18708 SE 54TH PL
Permit Details: NEW DRIVEWAY 18708 SE 54TH PL
ROW202100749
A permit for the amount of was issued on 03/03/21 to Ownership.
Permit Details: PSE INFRASOURCE-18708 NE 54TH PL-1091362200
Occupying the W bound lane of NE 54th Pl to cut and cap exist. twin 5/8" gas stub. Install +- 50' of 1 1/8" PE plat service ( 5' stub + 45' service) Set a 250 MSA. Customer stated that City of Sammamish changed his address from 18710 to 18708. 1 (3x5) hard and 1 (3x5) soft surface cuts anticipated.
Permit Details: PSE INFRASOURCE-18708 NE 54TH PL-1091362200
Occupying the W bound lane of NE 54th Pl to cut and cap exist. twin 5/8" gas stub. Install +- 50' of 1 1/8" PE plat service ( 5' stub + 45' service) Set a 250 MSA. Customer stated that City of Sammamish changed his address from 18710 to 18708. 1 (3x5) hard and 1 (3x5) soft surface cuts anticipated.
ELC202005445
A permit for the amount of was issued on 11/24/20 to Ownership.
Permit Details: MARTIN LOW VOLTAGE ONLY
A (Single Family Residential) (New) (Low Voltage Only) project involving 8 CATV or closed circuit coaxial cable, 3 Control Wire, Single Family Dwelling
Permit Details: MARTIN LOW VOLTAGE ONLY
A (Single Family Residential) (New) (Low Voltage Only) project involving 8 CATV or closed circuit coaxial cable, 3 Control Wire, Single Family Dwelling
ROW202004128
A permit for the amount of was issued on 10/15/20 to Ownership.
Permit Details: PSE POTELCO-18708 NE 54TH PL-101132019
Occupying the W bound lane of NE 54th Pl to, Potelco work crew to park in ROW to replace existing HH in private property and install new UG service. All work will be on private property. *Please rush customer needing service asap
Permit Details: PSE POTELCO-18708 NE 54TH PL-101132019
Occupying the W bound lane of NE 54th Pl to, Potelco work crew to park in ROW to replace existing HH in private property and install new UG service. All work will be on private property. *Please rush customer needing service asap
ELC202004283
A permit for the amount of was issued on 09/17/20 to Ownership.
Permit Details: MARTIN LOW VOLTAGE ONLY
A (Single Family Residential) (New) (Low Voltage Only) project involving Single Family Dwelling, 5 Thermostat wire
Permit Details: MARTIN LOW VOLTAGE ONLY
A (Single Family Residential) (New) (Low Voltage Only) project involving Single Family Dwelling, 5 Thermostat wire
BLD202000637
A permit for the amount of was issued on 07/15/20 to Ownership.
Permit Details: NEW SFR MARTIN
NEW NET ZERO S.F.R. Project Statement and Energy Goals This home is meant to be a Net Zero energy producer and user. The intent is for the home to be both comfortable and to operate for many years with low energy consumption offset by on site solar energy production. Care has and will be taken in the selection of equipment, materials, and finishes to ensure low energy consumption, offsetting energy production, fresh air introduction with low particulate filtration inputs, and complete distribution throughout the occupied areas. Trades will provide skilled implementation of the plans including; careful air sealing, drainage plane detailing, and protection of structural members from inclement weather during the construction process. High comfort, Healthy indoor air, and Offsetting on site energy production are the primary goals for this design. FIRE SPRINKLERS REQUIRED
Permit Details: NEW SFR MARTIN
NEW NET ZERO S.F.R. Project Statement and Energy Goals This home is meant to be a Net Zero energy producer and user. The intent is for the home to be both comfortable and to operate for many years with low energy consumption offset by on site solar energy production. Care has and will be taken in the selection of equipment, materials, and finishes to ensure low energy consumption, offsetting energy production, fresh air introduction with low particulate filtration inputs, and complete distribution throughout the occupied areas. Trades will provide skilled implementation of the plans including; careful air sealing, drainage plane detailing, and protection of structural members from inclement weather during the construction process. High comfort, Healthy indoor air, and Offsetting on site energy production are the primary goals for this design. FIRE SPRINKLERS REQUIRED
ELC202001813
A permit for the amount of was issued on 05/13/20 to Ownership.
Permit Details: MARTIN ELECTRICAL
A (Nonresidential) (New) (Electrical) project involving 1 Temporary Service 1-200 amps, Other Structure
Permit Details: MARTIN ELECTRICAL
A (Nonresidential) (New) (Electrical) project involving 1 Temporary Service 1-200 amps, Other Structure