About S&F Concrete

166 Central Street
Hudson, MA

S&F Concrete has experience in all facets of concrete formwork.

Updates

Pierce Boston
- Mar 01, 2018

Pierce Boston, one of Massachusetts’ tallest residential towers, officially opens to residents


Pierce Boston, a 30-story, 378-foot-tall tower that is Massachusetts’ tallest tower west of the Back Bay, officially opened to residents today. The tower, featuring an angular profile clad in glass, is located at the gateway to Boston and is now prominently visible from the Massachusetts Turnpike and other key points. Pierce Boston features 109 condominium residences, 240 apartment residences and over 20,000 square feet of dining and retail space across its’ first two floors. The tower is located in the heart of the growing, active Fenway neighborhood, and features sweeping views of the surrounding cityscape and countryside. “Pierce Boston’s residents are going to love living in The Fenway,” said Jed Lowry, Vice President at Pierce Boston co-developer Landsea, in a prepared statement. “So much is happening in The Fenway, and Pierce Boston is the perfect home base, with everything you need to enjoy an active, urban lifestyle in one of Boston’s best neighborhoods.”


Apartments are located up to floor 18, and condominiums are located on floors 19 through 29 underneath the 30th floor Levity Lounge, a space exclusive to condominium owners that will include a private dining room, a library, expansive outdoor and indoor seating areas, private sky cabanas for purchase and a sky top pool. Nathálie, a wine bar by the team behind Downtown Crossing’s Haley.Henry, will open on Pierce Boston’s ground floor this Summer. As of the end of 2017, 70% of Pierce Boston condominiums have been sold, and 20% of apartments have been leased.


345 Harrison
- Feb 21, 2018

Shore Leave tiki bar coming to 345 Harrison in South End


The proponents of the Upper South End’s successful Bar Mezzana Italian restaurant will open Shore Leave, a tiki bar and restaurant, on the ground floor of the neighborhood’s new-construction 345 Harrison apartment development. The island-inspired Shore Leave will be located across from Ink Block, home of Bar Mezzana, and is expected to open later this year. Details of Shore Leave’s menu have not yet been revealed. The Shore Leave space will be designed by Hacin + Associates, and fit out by Cafco Construction. Opening this Spring, 345 Harrison will feature 585 luxurious apartment residences, as well as 40,000 square feet of ground-floor retail that will also be home to CVS/Pharmacy.


345 Harrison
- Feb 06, 2018

Finishing touches underway at South End’s new-construction 345 Harrison luxury apartments


The multifaceted facades of both buildings of 345 Harrison, a 14-story, 535,900-square-foot mixed-use development located in the burgeoning Upper South End, have been just about fully installed, bringing a bright new multicolored array of red, yellow, orange, grey and white exterior finishes, in addition to blue floor-to-ceiling windows, to the growing neighborhood. Inside the buildings, luxurious finishes including California Closets, Italian cabinetry, quartz and granite countertops, stainless steel appliances, USB outlets and wood plank flooring are being installed within residences.


Finishing touches are also being put upon 345 Harrison’s amenity spaces, including a 13th floor Sky Lounge with an indoor lounge and outdoor roof deck, an outdoor, resort-style rooftop pool and a state-of-the-art fitness center and yoga room. On the development’s ground floor, glass is being fit along retail spaces, which will total 40,000 square feet and include a 10,000-square-foot CVS Pharmacy. In the coming weeks, landscaping of 345 Harrison’s central pedestrian plaza will begin. 345 Harrison is expected to open early this year. The following is a photograph of 345 Harrison:


345 Harrison


Pierce Boston
- Jan 30, 2018

Wine bar opening at Fenway’s new Pierce Boston luxury tower


The proponents of Downtown Crossing’s haley.henry wine bar, located on the ground floor of the 45 Province condominium tower, will open a second wine bar dubbed nathálie on the ground floor of the new 30-story Pierce Boston, the Fenway neighborhood’s tallest tower. Between 50 and 60 wines will be served at nathálie, emphasizing female wine producers and old world varieties, per Eater Boston. Fit out of the 1,200-square-foot space, which will also include a 200-square-foot outdoor patio, is expected to commence in March. nathálie is expected to open this Summer, and will feature a variety of seating options including a bar, high-tops along windows, a lounge area and banquette seating.


“Where haley.henry is a very masculine, tinned fish/wine bar, nathálie will be the dynamic, invigorating daughter that brings a whole new twist to Fenway,” said haley.henry and nathálie owner Haley Fortier in a prepared statement. “We are very much looking forward to establishing some amazing relationships by providing a unique wine bar experience for this part of the city.” Pierce Boston is set to open in February, and features residences including 109 condominiums and 240 apartments as well as 30,000 square feet of exclusive retail across the first two floors. At the top of the tower is a Levity Lounge exclusive to condominium owners, which includes the highest situated outdoor pool in the City of Boston.


345 Harrison
- Dec 31, 2017

CVS Pharmacy coming to ground floor of 345 Harrison development across from Ink Block in South End


CVS Pharmacy will reportedly open a 10,000-square-foot store within the 40,000-square-foot retail component of 345 Harrison, a nearly-complete mixed-use development opening early 2018 across from Ink Block in the South End. Per an update by The Boston Sun, the CVS lease is finalized, and developer UDR is also in discussions with retail tenants including a bar and restaurant concept. UDR is also considering opening a dog day care at 345 Harrison given neighborhood demand. 345 Harrison will feature 585 luxurious apartment residences with amenities including a 13th floor Sky Lounge with an indoor lounge and outdoor roof deck, an outdoor, resort-style rooftop pool and a state-of-the-art fitness center and yoga room.


Pierce Boston
- Dec 24, 2017

Pierce Boston nears February 2018 opening, finishing touches underway


Finishing touches to the interior and exterior of Pierce Boston, the new 30-story luxury tower located at the gateway to the booming Fenway neighborhood, are underway in advance of the tower’s scheduled opening in just over a month. The tower’s striking glass facade is essentially complete, and luxurious finishes have been almost fully installed throughout apartments, condominiums and amenity spaces. Pierce Boston features 109 condominiums and 240 apartments available for sale and lease, respectively. Apartments are located across floors three through 18 of Pierce Boston, and condominiums are located across floors 19 through 29. The tower’s 30th floor features a Levity Lounge exclusive to condominium owners featuring a library, a fitness center, a private dining room and the highest situated outdoor pool in the City of Boston. Across the tower’s first two floors will be 30,000 square feet of exclusive retail. The following are photographs of Pierce Boston:


Pierce Boston Photos


345 Harrison
- Nov 13, 2017

Interior renderings of 345 Harrison luxury apartments in South End, opening early 2018, revealed


Developer UDR has revealed renderings of residences and amenity spaces at 345 Harrison, a new 585-unit South End luxury apartment community with 40,000 square feet of ground-floor retail slated to open in early 2018. 345 Harrison will offer residents exclusive amenities including a 13th floor Sky Lounge with sweeping views of the Boston skyline featuring an indoor lounge and an outdoor roof deck with a fireplace and sweeping views; an outdoor, resort-style rooftop pool; and a 4,000-square-foot, state-of-the-art fitness center and yoga room. Residences at 345 Harrison will feature custom finishes with “sleek, contemporary designs and cinematic views” per UDR. The latest renderings of 345 Harrison are posted above.


Pierce Boston
- Sep 28, 2017

Pierce Boston condos in Fenway 60%-sold, apartment rents revealed


The 30-story Pierce Boston mixed-use tower’s 109 condominiums are 60%-sold, and leasing of the tower’s 240 apartments has now begun in advance of Pierce Boston’s opening in early 2018. Rents for studio apartments start at over $2,900 per month, one-bedrooms start at over $3,000 per month, two-bedrooms start at $4,600 per month and three-bedrooms start at over $7,000 per month. Apartments are located across floors three through 18 of Pierce Boston, and condominiums are located across floors 19 through 29. On Pierce Boston’s 30th floor is a Levity Lounge featuring a pool, a library, a fitness center and a private dining room exclusive to condominium owners. Across the tower’s first two floors will be 30,000 square feet of exclusive retail.


345 Harrison
- Aug 01, 2017

Facade installation underway at 345 Harrison apartments in South End


The multifaceted brick, metal panel and glass curtain wall facade of 345 Harrison's east tower has been nearly fully installed. Inside the building, metal studs have been erected to partition individual apartment residences, allowing for interior finishing to begin in the coming months. Throughout the recently topped off west tower, concrete floors are being poured on upper floors and fireproofing is being sprayed on completed lower levels. Installation of the west tower's facade will begin in the coming months. 345 Harrison will open in early 2018 and will feature 585 luxurious apartment residences with 40,000 square feet of ground-floor retail. The following are photographs of 345 Harrison:


345 Harrison Photos


345 Harrison
- Jul 13, 2017

345 Harrison mixed-use development in South End tops off


A topping-off ceremony was held last Wednesday (July 12th) for 345 Harrison, an upcoming mixed-use development in the South End featuring 585 apartment residences and 40,000 square feet of retail. The two-building development has topped off at 14 stories tall and is on schedule to open in early 2018. Located across from the Ink Block development and steps from multiple new and planned buildings, 345 Harrison is set to further activate a rapidly-growing corner of the South End with increased residential presence and a walkable, engaging streetscape. “The owner and architect took an innovative approach to this ultra-urban site by creating ground level open spaces that extend under building elements many floors above and connect to the public streets,” said Mark Junghans, Principal and Managing Director of the Boston office of 345 Harrison engineer VHB. “It gives it the feeling of a village space and creates the perfect spot for restaurants, sidewalk cafes and passive spaces for the residents and public alike.” The following is a photograph from the 345 Harrison topping-off ceremony, courtesy VHB:


345 Harrison Topping Off


Pierce Boston
- Jul 09, 2017

JM Electrical installs top-notch HVAC control system at Pierce Boston, Fenway’s tallest tower


Interior finishing at Pierce Boston, the Fenway neighborhood’s tallest tower, is well underway, with luxurious finishes taking shape in the 30-story tower’s apartments, condominiums and exclusive amenity spaces, and JM Electrical hard at work installing a state-of-the-art HVAC control system that will enable advanced climate control in all residences and common spaces. JM Electrical’s HVAC system will maintain precise temperature and humidity levels throughout Pierce Boston, ensuring residents of the building’s luxurious homes will be able to uphold ideal climate conditions as well as optimizing the building’s ventilation and energy-efficiency.


Pierce Boston’s gleaming floor-to-ceiling glass curtain wall facade is just about complete, and the focus of construction has turned to plastering and finishing residences, common spaces and the building’s top-floor Levity Lounge, an exclusive condominium owners’ amenity space featuring private dining, a library, expansive outdoor and indoor seating areas with unprecedented views, a pool deck and private sky cabanas for purchase. Located at the gateway to the Fenway neighborhood, Pierce Boston will feature 109 condominium residences on upper floors, 240 apartment residences at the building’s center and two stories of street-level retail totaling 20,000 square feet. Pierce Boston is expected to open in early 2018. The following are photographs of Pierce Boston:


Pierce Boston Photos


Serenity Apartments
- Jun 14, 2017

Construction complete at Serenity Apartments, new Mission Hill luxury residences now leasing


Construction is complete at Serenity Apartments, a new 15-story luxury tower in Mission Hill featuring 195 distinctive residences now leasing. Move-ins at Serenity began earlier this month; the building was 40% pre-leased prior to opening. Churchill Corporate Housing, a short-term corporate housing provider, has leased 24 apartments at Serenity, which is managed by Greystar. Serenity is located steps to Brookline Village and the Longwood Medical Area and features the latest in-demand amenities, including Wi-Fi enabled common areas, a billiard room, meeting and collaborative areas, a private courtyard, a rooftop pool and lounge deck, a barbecue deck and a green roof. Direct-access garage parking with electric car charging stations is available on-site, in addition to Zipcars and bicycle storage. Serenity presents an unprecedented green living option, with LEED Gold energy-efficiency certification and direct access to the MBTA Green Line.


“As we designed the community, we knew we needed to create something special to draw tenants to this corridor from Fenway and other nearby neighborhoods,” said Anthony Nader, Vice President of Serenity developer Longwood Group. “The rooftop pool and amenity area are really something to be seen.” Serenity residents will be located in an area seeing tremendous growth, with a number of development projects planned, under construction and recently completed. “The leasing demand is showing that with a destination asset, that provides a great living experience, prospective residents are willing to move to this side of the Longwood Medical Area,” said Nader. “The growth coming down the Brookline Avenue corridor, with the Children’s Hospital expansion at Brookline Place, Homewood Suites and potentially an additional hotel at Brookline Avenue, has created an exciting area of the city to be in. More restaurants will activate the streetscape, but the neighborhood is already beginning to come alive.”


345 Harrison
- Jun 04, 2017

Exterior finishing underway at 345 Harrison, upcoming South End luxury apartments


The east building at 345 Harrison has topped off at 14 stories tall, and installation of the building’s exterior facade is well underway. Brick and metal exterior finish panels have been installed up to the east building’s top floor at sections. Finishes, in addition to windows, are nearly fully installed along the east building's base facing Harrison Avenue. Remaining sections of the east building are now being weatherproofed. Construction of the steel frame of 345 Harrison’s west building along Washington Street is well underway, and has risen to as high as seven stories at sections. Opening in early 2018, 343 Harrison will feature 585 apartment residences with 40,000 square feet of ground-floor retail. The following are photographs of 345 Harrison:


345 Harrison Photos


345 Harrison
- Apr 13, 2017

345 Harrison apartments in South End reach full height


345 Harrison’s east tower along Harrison Avenue has reached its’ full height of 14 stories and will soon top off in full. The concrete elevator core of the west tower along Washington Street has reached its’ full height; construction of the west tower’s steel frame will commence imminently. Two active tower cranes now stand in place over the 345 Harrison site. Opening in early 2018, 345 Harrison will feature 585 apartment residences with 40,000 square feet of ground-floor retail. The following are photographs of 345 Harrison:


345 Harrison Photos


Serenity Apartments
- Mar 26, 2017

Finishing touches underway at Serenity Apartments, opening this Spring in Mission Hill


Serenity Apartments’ 15-story facade is nearly fully installed, and interior fit-out of luxury apartments and common spaces is nearly complete. Just about all exterior finish panels and windows have been installed, and nearly the entire interior has been plastered. State-of-the-art finishes and appliances are now being installed in apartments and common spaces. Opening this Spring, Serenity Apartments will feature 195 apartments including studio, 1-, 2- and 3-bedrooms and amenities including a swimming pool, a fitness center and a green roof deck. The following are photographs of Serenity Apartments:


Serenity Apartments Photos


Pierce Boston
- Mar 23, 2017

Pierce Boston curtain wall nears completion, luxury condominiums now on sale


Unitized glass curtain wall panels have reached the 21st level of Pierce Boston, an exceptional new 30-story luxury tower in the Fenway. With an unparalleled vantage point as the Fenway’s gateway structure and tallest tower, Pierce Boston offers unparalleled views of the Boston skyline, the Charles River, the Emerald Necklace and the surrounding countryside.


Levels 21 through 30 of Pierce Boston are actively being prepared for curtain wall panel installation. Metal panel anchors, which are used to fasten curtain wall panels, have been installed as high as Level 26. Inside Pierce Boston, metal stud walls continue to be framed to construct individual residences, and plumbing, electrical and HVAC systems continue to be installed. A pool that will become part of Pierce Boston’s exclusive top-floor Levity Lounge was recently lifted from ground level to the tower’s 30th floor. The pool has been carefully placed into the Lounge’s future pool deck. A video of the intricate pool installation process is posted below.


Pierce Boston’s 109 distinctive luxury condominium residences, located on levels 19 through 29, are now on sale. These residences will feature breathtaking panoramic views and state-of-the-art finishes. At Pierce Boston’s summit will be the Levity Lounge, an exclusive amenity space featuring private dining, a library, expansive outdoor and indoor seating areas with unprecedented views, a pool deck and private sky cabanas for purchase.


For more information about Pierce Boston and to schedule a private showing, visit the Pierce Boston website or click Contact Broker above. Pierce Boston is on track to be completed within the next year. The following are photographs of Pierce Boston:


Pierce Boston Photos


The following is the pool installation video:



345 Harrison
- Feb 16, 2017

345 Harrison in South End nears topping off


Framing of 345 Harrison's 14-story steel superstructure has reached the mixed-use development's 10th floor and is rising rapidly. Both of 345 Harrison's elevator cores have now reached their full height. Pouring of concrete floors has commenced at 345 Harrison's base. Opening in early 2018, 345 Harrison will feature 585 residential apartments with 40,000 square feet of ground-floor retail. The following are photographs of 345 Harrison:


345 Harrison Photos


Pierce Boston
- Jan 26, 2017

Curtain wall and interior fit out underway at Pierce Boston, condos now available


Exterior and interior finishing are well underway at the recently topped-out, 30-story luxury tower Pierce Boston. This architectural standout, designed by Arquitectonica, will serve as the gateway into the Fenway neighborhood. Pierce Boston will take its' place in the Boston skyline as the neighborhood's tallest luxury residential tower, offering a unique vantage point of the city and its' landmarks.


Unitized glass curtain wall panels are rising rapidly along Pierce Boston's façade and have already reached the 16th floor. Inside, metal stud walls are being framed to construct individual units on Pierce Boston’s lower floors (1-18). These levels, beautifully designed by CBT Architects, will house 20,000 square feet of retail, impressive amenity spaces and 240 residential apartments. All floors of Pierce Boston are now being outfitted with plumbing, electrical and HVAC systems.


Pierce Boston’s 109 condominiums, located on floors 19-29, are now on sale and have breathtaking 360-degree uninterrupted views of the city, the Charles River, the Emerald Necklace and the Longwood Medical Area. Unique to new development in the city is Pierce Boston's condominiums' top floor amenity space, the Levity Lounge, featuring private dining, a library, expansive outdoor and indoor seating areas with unprecedented views, a pool deck and private sky cabanas for purchase.


For more details and to schedule a private showing, visit the Pierce Boston website or click Contact Broker above. Pierce Boston is on track to be completed within the next year. The following are photographs of Pierce Boston:


Exterior
Pierce Boston Exterior


Views
Pierce Boston Views


Interior
Pierce Boston Interior


Serenity Apartments
- Jan 24, 2017

Serenity Apartments facade nearly complete, new drone footage released


Serenity Apartments’ facade is nearly fully fit out with exterior finish panels and windows in advance of the 15-story Mission Hill building’s opening this spring. Bricks are fully installed along the building’s base. Interior fit out of Serenity’s common spaces and 195 apartments and common spaces is well underway. New aerial drone footage of Serenity has been released:



345 Harrison
- Dec 14, 2016

Superstructure rising at South End’s 345 Harrison


Construction of 345 Harrison’s 14-story superstructure is well underway for both of the mixed-use development’s buildings. The northeast concrete elevator core has topped off, and the final story of the northwest core nears completion. Steel framing has reached 345 Harrison’s second floor and continues to progress quickly across the development site. 345 Harrison is expected to open in early 2018. Retail space at 345 Harrison is now leasing. The following are photographs of 345 Harrison:


345 Harrison Photos


Pierce Boston
- Dec 04, 2016

Pierce Boston tops off


A topping-off ceremony was held last Friday (December 2nd, 2016) for Pierce Boston, a 30-story mixed-use tower opening Winter 2018 in the Fenway. Concrete construction at Pierce Boston is now complete, with concrete poured on all floors. Pierce Boston will soon be weather tight; glass has been installed on over 10 stories, giving Pierce Boston a striking presence. HVAC construction at Pierce Boston including electrical, mechanical and plumbing utilities is well underway. Interior framing of Pierce Boston’s units and common spaces has also begun. The following are photographs from the Pierce Boston groundbreaking:





Serenity Apartments
- Nov 27, 2016

Serenity Apartments nearly fully sealed, new aerial footage released


Windows and exterior finish panels have been installed along a large section of Serenity Apartments’ facade as the building nears its’ Spring 2017 opening. At Serenity’s base, brick finishes have been just about fully installed. The construction team is now plastering Serenity’s apartments and installing interior finishes. HVAC utilities have been installed on Serenity’s roof and throughout the building. Serenity General Contractor Suffolk Construction has released two new aerial videos of Serenity, a new drone flyover and a time-lapse showing Serenity’s progression since the start of construction in Winter 2015:


New Drone Flyover


Time-lapse


Pierce Boston
- Nov 03, 2016

Pierce Boston nears topping off, condos listed for sale


Pierce Boston has risen to nearly its’ full height, currently standing at about 28 stories tall. Pierce Boston will be a 30-story mixed-use tower. Glass has been installed along the first five stories of Pierce Boston’s facade.


Condominiums are now on sale at Pierce Boston. A 22nd Floor one-bedroom is listed for $924,500, and a 19th Floor three-bedroom is listed for $2,913,700. New interior renderings of Pierce Boston have been revealed, including renderings of units; these can be found above. The following is a Tweet by Boston Tweet showing Pierce Boston:



Serenity Apartments
- Nov 03, 2016

New Serenity aerial footage released, finish installation underway


Suffolk Construction has released new aerial footage of Serenity, a 195-unit apartment building with 2,100 square feet of retail opening Spring 2017 in Mission Hill. Exterior finish panel installation is well underway, and moisture-resistant cladding is fully installed along the building’s frame. Per an update by Prellwitz Chilinski Architects, interior unit finishing is underway on lower level units. Steel framing is being installed on upper floors to lay out units. The following is the latest aerial footage of Serenity, courtesy Suffolk Construction:



Pierce Boston
- Oct 21, 2016

New Pierce Boston details revealed


New details and renderings have been released of Pierce Boston's penthouse suites and amenities. A total of 10 penthouses will be located at Pierce Boston enhanced with top-of-the-line appliances and finishes. The 30th-story Levity Lounge will feature a Dining Room atop a glass floor, a library well-suited for intimate gatherings and floor-to-ceiling windows offering sweeping views. Premium services at Pierce Boston will include in-house car detailing. Visit the Penthouse and Amenities pages on the Pierce Boston website for more information. The following are new renderings of Pierce Boston:


Pierce Boston New


Pierce Boston
- Oct 05, 2016

Pierce Boston over halfway to topping off


Pierce Boston, a 30-story luxury residential tower under construction in the Fenway, is over halfway to topping off. The tower's concrete structural frame currently stands at 18 stories tall. A PERI Skydeck system is being used to frame concrete pouring. Per an update from the Pierce Boston team, the tower will soon receive its "brilliant costume" as exterior finishes, comprised of a "glimmering curtain wall made of metal and glass," are installed. Completion of Pierce Boston's facade is anticipated in Spring 2017; the tower is anticipated to open in Fall 2017.


Pierce Boston will feature a mix of 240 rental apartments and 109 condominiums with 20,000 square feet of retail across the tower's first two floors. Resident amenities will include a rooftop pool and a Level 30 Levity Lounge featuring a private dining room with a glass floor. Visit PierceBoston.com for sales and leasing information. The following is a aerial photograph of Pierce Boston, courtesy the Pierce Boston team:


Pierce-Boston-October-2016


The following is an Instagram post showing Pierce Boston along Boylston Street:


Pierce-Boston-October-2016-2

Construction @pierce_boston #188Brookline #1350Boylston #TheFenway

A photo posted by kryptom (@kryptom) on Sep 26, 2016 at 6:02am PDT


Serenity Apartments
- Sep 30, 2016

Serenity website released with new renderings and drone footage, apartments opening Spring 2017


Developer Longwood Group and Property Manager Greystar have released a new website, TheSerenity.com, for Serenity, a 195-unit residential apartment building with 2,100 square feet of ground-floor retail opening Spring 2017 in Mission Hill. Per the website, Serenity will feature studio, one-bedroom, two-bedroom and three-bedroom residences. 24 residences overlooking Olmsted Park will feature private elevator access. With the website, new interior renderings of Serenity and a building logo have been released along with drone footage of the under-construction building. Renderings of Serenity and additional information can be found above; the following is the drone footage video:



Serenity Apartments
- Sep 25, 2016

Serenity exterior finish installation underway


Exterior finishes have reached the top level of Serenity's 15-story frame and are installed along a large frame section. Concrete has been poured on nearly all floors, and framing of interior units is underway.


Located in Mission Hill overlooking the Emerald Necklace, Serenity will feature 195 rental residential apartments and a 2,100 square foot retail space fronting South Huntington Avenue. Amenities at Serenity will include a swimming pool, a fitness center and a green roof deck. The following are photographs of Serenity, courtesy Newman Associates:


Serenity Photos September 2016


345 Harrison
- Sep 12, 2016

345 Harrison elevator core rising, tower crane installed


345 Harrison’s one-level, 275-car underground parking garage along William Mullins Way has been fully excavated. A concrete elevator core is under construction at the garage’s base; the core has risen two stories above grade. A PERI Skydeck system is being used to frame concrete pouring to construct the core. A tower crane has been installed on site in anticipation of impending steel superstructure construction. Mockup finishes have been posted along Traveler Street as a preview of 345 Harrison’s future exterior.


A sheet pile wall has been driven along the garage’s perimeter, and concrete piles have been driven into the garage’s base for structural support. Concrete piles have also been driven at the Traveler Street end of the project site. Large concrete footings are being poured above concrete pile caps at the garage’s base.


345 Harrison will feature two buildings containing approximately 585 residential units and 40,000 square feet of ground-floor retail. Resident amenities will include a 14th floor Sky Lounge with sweeping skyline views, a resort-style pool and a fully-equipped fitness center. Retail space at 345 Harrison is currently for lease, and residential unit pre-leasing is underway. Visit developer UDR’s 345 Harrison page for more information about residential unit pre-leasing. The following are photographs of the 345 Harrison site:


345 Harrison Photographs


Serenity Apartments
- Jul 21, 2016

Serenity apartment tower in Mission Hill tops off


We had the honor and privilege of attending the official Serenity topping off ceremony this past Monday, July 11th. We would like to extend huge congratulations and thanks to Longwood Group on this important milestone. Serenity will further enliven Mission Hill with 195 new residential rental apartments and approximately 2,100 square feet of ground-floor retail space. Amenities at Serenity will include a swimming pool, a fitness center and a green roof deck. Serenity will be LEED Silver certified and is anticipated to open in Spring 2017. Greystar will be Serenity's property manager.


The following is a link to an official press release announcing Serenity's topping off. The following are renderings of Serenity. Serenity's architect is Prellwitz Chilinski Associates, and the building's interior designer is RD Jones + Associates.


Serenity Apartment_Rendering_CWDG_Nickerson
View of Serenity from Emerald Necklace (Courtesy Prellwitz Chilinski Associates/Longwood Group)


Serenity Apartment_Rendering_Interior2
Serenity common space (Courtesy RD Jones + Associates/Longwood Group)


Serenity Apartment_Rendering_Interior1
Serenity common space (Courtesy RD Jones + Associates/Longwood Group)


Prior to speeches, ceremony attendees were given the opportunity to sign the final steel beam of Serenity’s frame.


Serenity-Beam-Signing-1
Construction team members sign final steel beam


Serenity-Beam-Signing-2
Signed final beam


Serenity-Beam-Signing-3
Members of the Nader family of Longwood Group


Serenity-Beam-Signing-4
Ceremony prior to speeches


Speakers at the Serenity topping-off ceremony included Serenity Project Manager Ralph Cole, Mission Hill Main Streets Executive Director Richard Rouse, Longwood Group Principal Tony Nader, Suffolk Construction Vice President and Chief Operating Officer Jim Grossman and Boston Redevelopment Authority Executive Director Brian Golden.


Serenity-Speeches-1
Serenity Project Manager Ralph Cole


Serenity-Speeches-2
Mission Hill Main Streets Executive Director Richard Rouse


Serenity-Speeches-3
Longwood Group Principal Tony Nader


Serenity-Speeches-4
Suffolk Construction Vice President and Chief Operating Officer Jim Grossman


Serenity-Speeches-5
Boston Redevelopment Authority Executive Director Brian Golden


Serenity-Speeches-6
Speeches stage


Serenity-Speeches-7
Serenity branding


Speeches were followed by the raising and installation of the final steel beam of Serenity’s frame.


Serenity-Beam-Raising-1
Construction workers prepare to raise the final steel beam


Serenity-Beam-Raising-2
Final steel beam prior to raising


Serenity-Beam-Raising-3
Raising of final steel beam


Serenity-Beam-Raising-4
Raising of final steel beam


Serenity-Beam-Raising-5
Installation of final steel beam


Serenity-Beam-Raising-6
Installation of final steel beam


Serenity-Beam-Raising-7
Installed final steel beam


Serenity-Beam-Raising-8
Frame prior to final steel beam installation


Serenity-Beam-Raising-9
A drone monitors final steel beam raising


Work will now commence upon installation of Serenity’s exterior and interior finishes. A construction elevator is being installed to lift workers, equipment and materials throughout Serenity’s frame. Framing for installation of insulation and moisture-resistant cladding is being installed along the frame's exterior.


Serenity-Frame-1
View of Serenity along Huntington Avenue


Serenity-Frame-2
Construction elevator installation underway


Serenity-Frame-3
A worker installs framing along Serenity's frame's exterior


Serenity-Frame-4
Construction materials staged inside Serenity's frame


Serenity-Frame-5
View of Serenity along Huntington Avenue


Serenity-Frame-6
View of Serenity along Huntington Avenue


More information about Serenity is posted below.


Pierce Boston
- Jun 30, 2016

Pierce Boston shoots for 30 stories


Superstructure construction is off to a strong start at Pierce Boston. The underground parking structure is complete, and the tower’s 30-story concrete superstructure has risen four floors. The first two floors, which will contain retail space, are fully framed. The construction team is using a Peri Skydeck system to frame concrete construction for each new floor. Pierce Boston will feature 28 stories of residential units, including 240 rental apartments and 109 condominiums, and 20,000 square feet of retail across the first two floors.


Condominiums at Pierce Boston, which range from $1 million to over $6 million, are already 30% pre-sold. Visit the Pierce Boston website for more sales information. 12 rooftop cabanas at Pierce Boston ranging from 150 to 250 square feet are being offered for sale to condominium buyers at $300,000 to $350,000 each.


Pierce-Boston-5
View of the front of the building at the corner of Brookline Avenue and Boylston Street

Pierce-Boston-6
View from Brookline Avenue

Pierce-Boston-8
View from Brookline Avenue

Pierce-Boston-1
View from the rear of the building

Pierce-Boston-2
View from Boylston Street

Pierce-Boston-10
Peri Skydeck system

Pierce-Boston-7
Peri Skydeck system

Pierce-Boston-4
View from Boylston Street

Pierce-Boston-3
View from Boylston Street

Pierce-Boston-9
Project banner


More information about Pierce Boston is posted below.


Serenity Apartments
- Jun 27, 2016

Steel frame rising at Serenity


Serenity’s concrete foundation is complete, and construction of the building’s steel frame is well underway. The construction team is using a tower crane to raise and install the frame’s structural elements. The section of Serenity bordering Jamaicaway has risen to the fifth floor, which will be the top floor for that section. Along South Huntington Avenue, frame construction will continue until the frame tops off at 15 stories tall. Serenity will be a 195-unit residential apartment tower with 2,100 square feet of retail.


Serenity-at-105A-South-Huntington-3
View from South Huntington Avenue

Serenity-at-105A-South-Huntington-7
View from Jamaicaway

Serenity-at-105A-South-Huntington-13
Tower crane

Serenity-at-105A-South-Huntington-1
Foundation and steel I-beam frame

Serenity-at-105A-South-Huntington-10
View from Jamaicaway

Serenity-at-105A-South-Huntington-2
View from South Huntington Avenue

Serenity-at-105A-South-Huntington-4
View from South Huntington Avenue

Serenity-at-105A-South-Huntington-12
Construction materials


J. Derenzo Companies continues to perform excavation and utility work at Serenity’s base.


Serenity-at-105A-South-Huntington-8
J. Derenzo Companies backhoe alongside steel frame

Serenity-at-105A-South-Huntington-11
J. Derenzo Companies excavation rig under the building

Serenity-at-105A-South-Huntington-9
J. Derenzo Companies backhoe

Serenity-at-105A-South-Huntington-6
View from Jamaicaway

Serenity-at-105A-South-Huntington-5
Substructure and J. Derenzo Companies excavation rig


More information about Serenity is posted below.


345 Harrison
- May 27, 2016

345 Harrison officially breaks ground


We had the honor and privilege of attending the official 345 Harrison groundbreaking ceremony this past Wednesday, May 25th. We would like to extend huge congratulations and thanks to UDR on this important milestone. 345 Harrison will further enliven the rapidly developing South End New York Streets neighborhood with hundreds of new residents in addition to new retail space. Above and below are the latest renderings of 345 Harrison.


345-Harrison-Design-2

Nighttime view of 345 Harrison from Traveler Street towards Downtown Boston


345-Harrison-Design-3

View of 345 Harrison at corner of Harrison Avenue (right) and Traveler Street (left)


345-Harrison-Design-4

View of 345 Harrison at corner of Traveler Street (right) and Washington Street (left)

Speakers at the 345 Harrison groundbreaking ceremony included UDR Vice President of Development Robert McCullough, UDR Development Associate Elizabeth Likovich, City of Boston Chief of Civic Engagement Jerome Smith, CBT Architects Principal David Hancock and John Moriarty & Associates CEO David Leathers.


345-Harrison-Robert-McCullough

UDR Vice President of Development Robert McCullough


345-Harrison-Elizabeth-Likovich

UDR Development Associate Elizabeth Likovich


345-Harrison-Jerome-Smith

City of Boston Chief of Civic Engagement Jerome Smith


345-Harrison-David-Hancock

CBT Architects Principal David Hancock


345-Harrison-David-Leathers

John Moriarty & Associates CEO David Leathers


Speeches were followed by a ceremonial groundbreaking on the construction site.


345-Harrison-UDR-Team-1
Shovels about to fly at 345 Harrison


345-Harrison-Groundbreaking-Shovels-Fly

Shovels fly at 345 Harrison


345-Harrison-UDR-Team-2
UDR development team


345-Harrison-CBT-Team
CBT Architects team


345-Harrison-Groundbreaking-Tent

View of the ceremonial groundbreaking tent


Pile driving and excavation are underway at 345 Harrison. A large section of the project’s sheet pile wall is in place. The sheet pile wall will reinforce 345 Harrison’s foundation and underground parking garage. Two new buildings will be built at 345 Harrison.


345-Harrison-Excavators-Sheet-Pile-Wall

Excavators parked along a section of 345 Harrison's sheet pile wall


345-Harrison-Sheet-Pile-1

View of 345 Harrison sheet pile wall along Harrison Avenue (right) towards Downtown Boston


345-Harrison-Sheet-Pile-2

View of 345 Harrison sheet pile wall construction facing Harrison Avenue and Ink Block


Concrete piles are being driven for additional structural support. Approximately 650 concrete piles will be driven at 345 Harrison. A number of H piles will also be driven. A number of piles have been driven along the north side of the project site fronting William Mullins Way. Pre-trenching is underway to remove debris and stone and prepare the south side of the site fronting Traveler Street for pile driving.


345-Harrison-Piles-1

Concrete pile driving underway at the corner of Harrison Avenue and William Mullins Way


345-Harrison-Piles-2

View of pile driving at 345 Harrison including concrete piles, H piles and sheet piles


345-Harrison-Piles-3

The 345 Harrison construction team drives concrete piles along Harrison Avenue


345-Harrison-South-Work

Pre-trenching underway at the south side of 345 Harrison


Excavation of 345 Harrison’s underground parking garage is well underway. A one-level underground garage with parking for 275 cars and 325 bicycles will be built along William Mullins Way. Approximately 10 more vertical feet will be excavated prior to the garage’s completion.


345-Harrison-Full-Site

View of partially excavated section of 345 Harrison's underground parking garage along William Mullins Way looking towards Harrison Avenue


UDR is looking for suggestions for potential names and building amenities for 345 Harrison. Tweet your suggestions with #Lovefor345Name and #Lovefor345Amenity, respectively, and you could win up to $10,000!


Love-for-345

UDR #Lovefor345 graphic


345 Harrison is expected to open in early 2018. Pre-leasing of residences at 345 Harrison has begun, visit UDR’s 345 Harrison page for more information and to join the interest list. A live camera has been installed showing progress at 345 Harrison. More information about 345 Harrison is posted below.


The following are photographs of 345 Harrison taken earlier in May showing excavation and sheet pile driving underway:


345-Harrison-6

Panoramic view of 345 Harrison site from corner of Washington Street and William Mullins Way


345-Harrison-2

Panoramic view of 345 Harrison site from corner of Harrison Avenue and William Mullins Way


345-Harrison-5

View of excavation underway in background and sheet piles ready for driving in foreground


345-Harrison-1

View of sheet pile wall along Harrison Avenue towards SoWA


Pierce Boston
- Apr 25, 2016

Pierce Boston about to pierce Boston's sky

Pierce Boston frame construction starts


Pierce-Boston-Headliner

Pierce Boston as seen from Brookline Avenue


Pierce Boston, named for its architecture that "pierces" the sky, is rising fast! Construction of Pierce Boston’s 30-story frame has begun. A tower crane has been installed; J. Derenzo Companies is at work building the tower crane’s lagging pit to protect the crane and surrounding pipelines. J. Derenzo Companies is also performing excavations for installation of plumbing at Pierce Boston.


Pierce-Boston-Derenzo-1

J. Derenzo Companies builds crane lagging pit


Pierce-Boston-Derenzo-2

J. Derenzo Companies performs excavations for plumbing


Pierce Boston’s elevator core has risen two stories. A Peri Skydeck formwork system has been installed along one end of Pierce Boston’s future frame to pour concrete for the building's second story. S&F Concrete is Pierce Boston's concrete contractor; John Moriarty & Associates is Pierce Boston's general contractor.


Pierce-Boston-Full-View-1

Pierce Boston with tower crane at left, Peri Skydeck at center and elevator core at right


Pierce-Boston-Full-View-2

Pierce Boston with elevator core at left and Peri Skydeck at right


At the frame’s opposite end, a wall is under construction for the Peri system’s second half.


Pierce-Boston-Wall-1

Pierce Boston construction team prepares Peri system wall


Pierce-Boston-Wall-2

A worker prepares the Peri system wall


The Peri system will soon extend all the way to the wall, and concrete for Pierce Boston's second story will be poured. 


Pierce-Boston-Full-Peri

View of the wall (at left) with respect to the rest of the currently built Peri system


The Peri system will frame the concrete pour for Pierce Boston's second story. Concrete will be poured along the top of the system's decking and along support pillars beneath. The following is an animation showing concrete poured along a Peri system:



Once the concrete has settled, the same Peri system will be used to construct all 30 of Pierce Boston’s stories. Concrete has already been poured along some of Pierce Boston's second story support pillars.


Pierce-Boston-Peri-1

View of Peri system underbody. Note concrete anchors in place for pouring of support pillars.


Pierce-Boston-Peri-2

View of Peri system underbody. Concrete has been poured along some second story support pillars.


We got to climb to the top of the Peri system's decking, where we saw the construction team preparing concrete anchors in anticipation of pouring concrete to construct Pierce Boston’s second story. These anchors will frame third story support pillars.


Pierce-Boston-Skydeck-Top-1

Construction team prepares concrete anchors for the next story's concrete pour


Pierce-Boston-Skydeck-Top-2

Another angle of concrete anchor preparation atop the Peri system's decking


At the top, we found more Peri system decking panels that will be used to construct the full Peri system decking for Pierce Boston’s second story concrete pour.


Pierce-Boston-Skydeck-Panels

Peri system decking panels ready for full system construction


The following is a video in which Joel Hagan of S&F Concrete explains the Peri system:



From the top of the Peri system decking, we saw freshly poured concrete along what will be a loading dock for Pierce Boston. Pierce Boston's underground parking structure, partially located beneath the future loading lock, is complete.


Pierce-Boston-Loading-Dock-2

Aerial view of freshly poured loading dock concrete


Pierce-Boston-Loading-Dock-1

Straight-on view of freshly poured loading dock concrete


The Pierce Boston construction team is hard at work building a game-changing tower that will set a new standard for Boston luxury living.


Pierce-Boston-Hard-Work-1

A worker prepares to install a new Peri system decking panel and extend the Peri system along Pierce Boston's full dimensions


Pierce-Boston-Hard-Work-2

A worker constructs Pierce Boston's future loading dock


Additional information about Pierce Boston is posted below.


Feb 20, 2016

Pierce Boston frame about to rise


J. Derenzo Companies is performing excavations in preparation for construction of the first story of Pierce Boston’s 30-story frame. Concrete is just about to be poured at the base of Pierce Boston’s future elevator core. A tower crane is now being installed, signaling the impending start of frame construction.


Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-1
Pierce Boston's future elevator core ready for a concrete pour. In the background is the base of Pierce Boston's tower crane.


Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-2
A full view of the Pierce Boston construction site with the future elevator core at center. At right is J. Derenzo Companies preparing for Pierce Boston's frame construction

Pierce Boston's underground parking structure is just about complete and will soon be sealed from above. Accordingly, construction of Pierce Boston's sheet pile wall is complete. The parking structure is connected underground to the existing parking structure of neighboring Fenway Triangle.

Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-3
View of Pierce Boston sheet pile wall above underground parking structure

Pile driving is complete at Pierce Boston. Pile drivers have been moved off site, making way for construction of Pierce Boston's frame.

Pierce-Boston-Brookline-Avenue-Boylston-Street-Fenway-Point-Weiner-Ventures-Samuels-Associates-Development-Arquitectonica-John-Moriarty-Associates-Construction-J-Derenzo-Company-Hayward-Baker-Bay-Crane-7
Pile drivers are no longer located on the Pierce Boston construction site


Serenity Apartments
- Feb 26, 2016

Excavation and foundation work underway at Serenity


J. Derenzo Companies is at work performing excavation and foundation work to prepare the Serenity site for tower construction. Much of the tower's foundation has already been excavated; S&F Concrete is pouring concrete along the excavated foundation. Suffolk Construction is managing Serenity's construction. Serenity will feature 195 apartments and a 2,100 square foot retail space in the heart of Mission Hill along the Emerald Necklace park.


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-1
View of Serenity construction site


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-2
View of foundation construction and concrete pouring underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-3
View of excavation underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-4
J. Derenzo Companies excavator


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-5
Concrete poured along foundation


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-6
J. Derenzo Companies bobcat vehicle


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-7
J. Derenzo Companies vehicles


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-8
Freshly poured concrete foundation


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-9
Excavation underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-10
View of construction site


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-11
Foundation work underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-12
Foundation work underway


Serenity-105A-South-Huntington-Mission-Hill-Jamaica-Plain-Cedar-Valley-Development-LLC-Longwood-Group-Prellwitz-Chilinski-Associates-Suffolk-Construction-J-Derenzo-Company-S-F-Concrete-13
View along Huntington Avenue


345 Harrison
- Feb 08, 2016

J. Derenzo Companies completes demolition at 345 Harrison


J. Derenzo Companies' JDC Demolition division has demolished the former Graybar Electric building at 345 Harrison. In spring 2016, construction will commence of two new mixed-use buildings with approximately 585 residential units and up to 40,000 square feet of retail.


345-Harrison-Avenue-UDR-Development-South-End-Ink-Block-Boston-J-Derenzo-Company-Demolition-Graybar-Electric-CBT-Architects-1

345 Harrison site following demolition of Graybar Electric building


Serenity Apartments
- Jan 15, 2016

Work starting at Serenity


Suffolk Construction has begun work at Serenity! Concrete will be poured next week:

Beginnings of our Serenity 105 Apartments project...concrete pour coming next week! #Boston #construction #jamaicaplain

A photo posted by Suffolk Construction (@buildsmart) on Jan 12, 2016 at 1:06pm PST


Pierce Boston
- Jan 12, 2016

Pile driving and foundation construction underway at Pierce Boston


Pile driving and foundation construction are well underway at Pierce Boston. Steel piles are being driven to provide structural support. Sheet piles are being driven to construct a sheet pile wall. The sheet pile wall will reinforce Pierce Boston's foundation and underground parking structure. A total of 325 piles will be driven at Pierce Boston.

Pierce_Boston_Samuels_and_Associates_Development_Residential_John_Moriarty_and_Associates_General_Contractor_Construction_Arquitectonica_Architect_1
Steel pile driving underway at Pierce Boston

Pierce_Boston_Samuels_and_Associates_Development_Residential_John_Moriarty_and_Associates_General_Contractor_Construction_Arquitectonica_Architect_3
Steel pile about to be loaded into the pile driver

Pierce_Boston_Samuels_and_Associates_Development_Residential_John_Moriarty_and_Associates_General_Contractor_Construction_Arquitectonica_Architect_8
Sheet piles already driven along Pierce Boston's future sheet pile wall. At right are sheet piles about to be driven.


345 Harrison
- Nov 08, 2015

Demolition at 345 Harrison underway


J. Derenzo Companies' JDC Demolition division is demolishing the former Graybar Electric building at 345 Harrison. Demolition is well underway and will clear the site for construction of two new buildings.

345-Harrison-Demolition-J-Derenzo 1
Demolition of Graybar Electric building underway


Serenity Apartments
- Oct 24, 2015

Start of construction imminent at 105A South Huntington


Start of construction at 105A South Huntington appears imminent as the project's official status was changed yesterday, 10/23/2015, to "Under Construction" on the Boston Redevelopment Authority (BRA)'s website. The status change is shown on the BRA's project page for 105A South Huntington.


Pierce Boston
- Oct 20, 2015

Webcam installed at Pierce Boston


A live construction webcam has been installed at Pierce Boston.


Pierce Boston
- Oct 13, 2015

Groundbreaking ceremony held for Pierce Boston as foundation construction commences


An official groundbreaking ceremony for Pierce Boston (formerly The Point) will be held this Thursday, October 15th, 2015. Construction of Pierce Boston is moving forward swiftly; pile driving and construction of Pierce Boston's foundation and underground parking structure has begun.

Pierce-October-1
Pile drivers as seen from Boylston Street

Pierce-October-2
Pile drivers as seen from Brookline Avenue


Pierce Boston
- Aug 05, 2015

The Point rebranded Pierce Boston


The Point, currently under construction in the Fenway, has been rebranded Pierce Boston.


Pierce Boston
- Jun 17, 2015

Demolition complete at The Point


J. Derenzo Companies' JDC Demolition division has completed demolition of the former building located on the Point development site. Construction will soon begin on foundations of a new 30-story tower.

Pierce-June
Former building has been demolished


Thought Leadership

No new thoughts. Inquire about becoming a thought leader by clicking here

Headquarters

To unlock, this organization must be verified.

Please click here to verify >>