Market Central
Update
11/09/18
Market Central Tops Off
The 19-story, 195-foot residential tower along Mass. Ave. at the heart of Market Central has topped off. This building has been dubbed Watermark Central and will offer concierge service, a fitness center, yoga room, sky terrace, and community lounge. Construction is set to be complete in 2020.
The first phase of Market Central that will be complete will be Union House, a four-story building situated along the back of the project. Units here will range in size from studios up to three bedrooms. Exterior and interior work are ongoing for this building which is now leasing.
The third building in the project is Link, a co-living option that offers private micro units to two or three-bedroom homes, a community lounge, outdoor terrace, and game rooms. Window install and exterior work are ongoing here. This building is set to open in Summer 2019.
In total the Market Central development will feature 308 apartments and around 17,000sf of retail space. 60 residences will be designated affordable. Approximately 150 vehicle parking spaces and 360 bicycle parking spaces will be located on site as well.