Boston University At A Glance


PROJECT STATUS
Construction Complete: 8 |
Under Construction: 1 |
Initial Site Work: 1 |
Acquired by Proponent: 1

WORK BY SECTOR
Educational: 7 |
Housing: 1 |
Healthcare: 1 |
Lab: 3 |
Office: 2 |
Retail: 1 |
Other: 1

PROJECT SIZES
$0 - $10M: 5 | $10M - $100M: 1 | $100M+: 3

Totals

Total Square Footage Free
Total Dollar Volume Free

General

Established 1900
Website Free
Phone Number ITK

Boston University (BU) is a private research university in Boston, MA. The university is nonsectarian, but has been historically affiliated with the United Methodist Church. The university has more than 3,900 faculty members and nearly 33,000 students, and is one of Boston's largest employers.

Updates

Boston University Goldman School of Dental Medicine
- Jun 04, 2020

Facade Install Complete for BU Dental School Expansion Install of the terracotta and faux wood trim facade panels has been finished for the expansion and renovations of BU's Goldman Dental School. On the interior of the 126,000+ square foot space, finish work is ongoing including paint, carpet, and even furniture install. Construction is expected to wrap up in spring 2021. 


Boston University Data Sciences Center
- May 22, 2020

$286M Building Permit Pulled for BU Data Science Center As reported earlier this week on BLDUP construction activity is back underway for the BU Data Sciences Center and now Suffolk Construction has pulled the building permit for the project. The permit is valued at $285,993,935.00. Due to open in 2022, the center will be state of the art in every way: striking architecture, advanced resources, environmental sensitivity, and interior spaces designed to facilitate collaboration. The 19-story structure will house BU's mathematics, statistics, and computer science programs, as well as the renowned Rafik B. Hariri Institute for Computing and Computational Science & Engineering. 


Boston University Data Sciences Center
- May 19, 2020

BU Begins Early Stage Excavation on Site of Future Data Sciences Center Boston University has begun excavation work along Commonwealth Avenue the future home of the Data Science Center. Additionally, stockpiles have been created on-site and the parking lot is beginning to be disassembled. The upcoming 350,000-square-foot tower will be Boston's biggest sustainable building, and BU’s most energy-efficient. The Center will bring the University’s mathematics, statistics, and computer science departments under one roof to further interdisciplinary research in the booming field of data sciences.


730 Commonwealth Ave
- Jan 17, 2020

BU Buys 730 Comm. Ave for $50 Million Boston University has acquired the property at 730 Commonwealth Avenue in Brookline for $50 million. The property features a three-story, 145,174 square foot building that was constructed in 1930. The educational/retail building sits on a 2.7-acre parcel in the heart of Commonwealth Ave and is home to BUild Lab and a CVS Pharmacy.


Boston University Goldman School of Dental Medicine
- Dec 23, 2019

Facade Install Wrapping Up for BU Dental School Expansion Install of the terracotta and faux wood trim facade panels is wrapping up and is expected to be completed in early January for the expansion and renovations of BU's Goldman Dental School. On the interior of the 126,000+ square foot space, finish work is ongoing including paint, carpet, and even furniture install. Construction is expected to wrap up in spring 2021. 


Boston University Data Sciences Center
- Dec 06, 2019

BU Breaks Ground on Data Sciences Center On December 5th, 2019 Boston University hosted a groundbreaking ceremony for the upcoming Data Science Center to be located at 665 Commonwealth Avenue. The 350,000-square-foot tower will be Boston's biggest sustainable building, and BU’s most energy-efficient. The Center will bring the University’s mathematics, statistics, and computer science departments under one roof to further interdisciplinary research in the booming field of data sciences.


Boston University Data Sciences Center
- Nov 25, 2019

Site Preparation Underway for BU Data Science Center The space for the new data science center at 646-665 Commonwealth Avenue, on Boston University's campus, has been cleared and ready for the next steps of construction and drilling. Fencing has been placed along the perimeter of the location. The expected 14-story building is predicted to begin construction in Spring 2020.


Boston University Goldman School of Dental Medicine
- Oct 04, 2019

Work Continues on BU Dental Expansion & Renovation Construction of the addition along with renovations to existing space continues at the Boston University Goldman School of Dental Medicine. In the existing section of the building, new windows are being installed along with updated ceiling grids to enable new lights and HVAC equipment.  Elsewhere in the 7-story, 41,900 square foot addition installation of new mechanical, electrical, plumbing and fire protection systems is also ongoing. The project will also include numerous energy efficiency measures being completed in partnership with Eversource. Eversource provided energy modeling services to drive deeper energy savings from measures such as enhanced fan speed control, variable condenser water control and preheating supply air from the water-side economizer. Eversource will provide incentives for these measures through the Mass Save C&S New Construction program when the measures are installed and verified as being operational.When complete in Spring 2021 the expanded dental school will include new clinical space to make treatment environments more comfortable along with 40% more instructional space. This new space will allow for a better experience for patients, students, and faculty and staff and complements the school’s innovative curriculum.


Boston University Data Sciences Center
- Oct 01, 2019

Construction on BU Data Sciences Center Expected to Kick off Spring 2020 Late last month the BU Board of Trustees voted to approve the construction of the new Data Science Center with an expected kick off this coming spring. The 345,724 square-foot building will be the tallest on the BU campus and will be completely fossil-fuel free, making it one of the most energy-sustainable buildings in all of Massachusetts.    


Boston University Data Sciences Center
- Jul 12, 2019

BU Data Sciences Center Approved The BPDA has approved Boston University's Data Sciences Center, the 19-story tower that will sit near the heart of the campus at 665 Commonwealth Avenue. The 305,000 square foot project will consolidate the Departments of Computer Science and Mathematics and Statistics and the Rafik B. Hariri Institute for Computing and Computational Science and Engineering. When complete the new stack of books building will be the tallest on the campus.


Boston University Goldman School of Dental Medicine
- Jun 18, 2019

Work Ongoing for Exterior Walls for BU Dental Addition Construction is ongoing with on the exterior walls for the both 7-story & 2-story additions to Boston Unversity's Dental School in the South End. Metal stud framing is also being installed to support the exterior facade finishes. When complete the updated building will feature a total of nearly 126,100 square feet of office, instructional, clinical, and student collaborative space, incorporating the latest technology and creating multi-functional learning space. Construction is expected to wrap up in Spring 2021.


Boston University Goldman School of Dental Medicine
- Apr 01, 2019

BU Dental School Expansion/Renovation Tops Off Shawmut Design and Construction hosted a topping off ceremony last Friday for the $112M renovation and expansion of Boston University's Goldman School of Dental Medicine.  The project includes a new 7 story 41,900 square-foot expansion and renovation of 53,100 square-foot of existing space. The new and renovated space will feature office, instructional, clinical, and student collaborative space, incorporating the latest technology and creating multi-functional learning space. The building's exterior will also be fully modernized, featuring a new terra-cotta and glass curtain wall facade. Construction on the first phase of the project is expected to be complete in February 2021.


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5

No Reviews


Projects

WBUR CitySpace
730 Commonwealth Ave
Boston University Data Sciences Center
645 Commonwealth Avenue, Boston, MA, 02215
Boston University Clinical Psychology
900 Commonwealth Avenue, Boston, MA, 02215
Boston University Questrom School of Business Office Expansion
595 Commonwealth Avenue, Boston, MA, 02215
Boston Unviersity College of Arts & Sciences / Boston University Center for Computational Neuroscience
725 Commonwealth Avenue, Boston, MA, 02215
Joan & Edgar Booth Theatre
Boston University Goldman School of Dental Medicine
100 East Newton Street, Boston, MA, 02118