ITK

James Corner Field Operations At A Glance


PROJECT STATUS
Under Construction: 1 |
Under Official Review: 1 |
Initial Site Work: 1

WORK BY SECTOR
Retail: 3 |
Office: 3 |
Housing: 1 |
Lab: 1

PROJECT SIZES
$0 - $10M: 1 | $10M - $100M: 0 | $100M+: 2

Totals

Total Square Footage Free
Total Dollar Volume Free

General

Established 2005
Website Free
Phone Number ITK

James Corner Field Operations is a leading-edge urban design, landscape architecture and public realm practice based in New York City. The practice is renowned for strong contemporary design across a variety of high-profile project types and scales, from large urban districts and complex post-industrial sites to small well-crafted, detail design projects. There is a special commitment to the design of a vibrant and dynamic public realm, informed by the interactive ecology between people and nature.

Updates

Seaport Square Parcel P
- May 28, 2020

Site Work Back Underway at 400 Summer St Crews are back to continue site work for the upcoming 16-story lab building coming to 400 Summer Street. Foundation Medicine will occupy all of the lab and office space within the 625,000 square foot building. The project will also include 30,000 square feet of retail space and a new grand public stair connecting Summer and Congress Streets designed by James Corner Field Operations, the landscape architect behind New York’s High Line. 


Seaport Square Block L4
- May 26, 2020

Work Underway for Concrete Core at Seaport Square Block L4 With construction back underway in Boston, crews continued work on the concrete core at Seaport Square Block L4, the future home to Amazon. The upcoming 17-story building will feature 81,000 square feet of retail space on the first two levels accompanied by 444,000 square feet of office space on the upper levels. Around 2,000 Amazon employees are expected to work within the building in fields including machine learning, speech science, cloud computing, and robotics engineering. Photo: Fenagh Engineering & Testing


Seaport Square Parcel P
- Mar 04, 2020

Site Work Begins on Seaport Square Parcel P Site work is underway for the upcoming 626,000 square foot lab/office project at 400 Summer Street.  The Seaport building will be home to Foundation Medicine, who have leased 580K square feet. As part of the project, a new set of stairs including public open space will be built to connect Summer Street down to Congress Street.


Seaport Square Block L4
- Feb 25, 2020

Foundation & Garage Construction Continues on Seaport Square Block L4 Work continues on the foundation and underground garage for Seaport Square Block L4. The 17-story office building is expected to open in 2021. When completed, the tower will be Amazon's Seaport office and will house around 2,000 employees.


Seaport Square Parcel P
- Feb 14, 2020

$236M Building Permit Pulled for 400 Summer Street Suffolk Construction has pulled a building permit valued at $236M to kick off construction of 400 Summer Street in the Seaport. The upcoming 16 story lab building will feature 625,000 square feet of space including 30,000 square feet of retail space. Foundation Medicine has leased 580,000 square feet of laboratory and office space at the project.  The development will also involve the construction of a grand public stair connecting Summer and Congress Streets.


Seaport Square Block L4
- Dec 29, 2019

Tower Crane in Place for Amazon's Future Seaport Office Tower The tower crane is up at Seaport Square Block L4, for what will be home to Amazon's Seaport office. The 17-story tower will feature 444,000 square feet of office space above, 81,000 square feet of retail. Approximately 2,000 Amazon employees will work from this new location when it opens sometime in 2021.


Seaport Square Parcel P
- Aug 01, 2019

Foundation Medicine Leases 580,000 Square Feet at 400 Summer Street WS Development has announced that Foundation Medicine has leased 580,000 square feet of laboratory and office space at 400 Summer Street, part of the company’s 23-acre Boston Seaport development. “We are honored that Foundation Medicine has chosen 400 Summer Street for their headquarters. Boston’s Seaport has come to serve as the city’s hub for forward-thinking employers, residents, and retailers, and now as a global hub of the life sciences sector. No company better represents the power of innovation than Foundation Medicine and we are proud to welcome them to our neighborhood,” said Jeremy Sclar, President of WS Development. The upcoming 626,000 square foot, 16 story lab/office project at 400 Summer Street. will include a new set of stairs including public open space to connect Summer Street down to Congress Street.


Seaport Square Block L4
- Jul 23, 2019

Work Continues on Foundation/Below Grade Parking for Seaport Square Block L4 Construction is ongoing for the foundation and two levels of below-grade parking at Seaport Square Block L4, future home of Amazon. Block L4 will feature 444,000 square feet of office space above two levels of retail, 81,000 square feet. The project will also bring a new park to the area, connecting Summer Street to the Waterfront, Harbor Square Park will be a 1/3 mile public promenade designed by the world-renowned landscape architecture firm James Corner Field Operations, possibly best known for their work on Manhattan’s High Line.  Construction on Seaport Square Block L4 is expected to be complete in 2021.


Seaport Square Parcel P
- Jul 18, 2019

WS Development Plans to Begin Construction on 400 Summer St. Later This Year At yesterday's NAIOP Seaport by Foot Tour event, Yanni Tsipis of WS Development discussed a few of his firm's upcoming projects in Seaport Square. With work underway for Amazon's future home at Seaport Square Block L4, WS expects to begin construction on Parcel P next, later this year. Parcel P, or 400 Summer Street, will include over 600,000 square feet of lab space and is aesthetically designed to connect Fort Point's industrial style with The Seaport. As part of the 400 Summer Street project, WS will be building a new connection between Summer and Congress Streets. These gorgeous new stairs will include public space and allow for a much more pleasant pedestrian connection than the current A Street Stair option.


Seaport Square Block L4
- Jun 13, 2019

Seaport Square Block L4 Financed for $435 Million The project at Seaport Square Block L4 has been financed via Citizens Bank for $435 million. The upcoming project consists of a 17 story retail and office building to be constructed on a 1.63-acre parcel in Boston's Seaport Square. The 525,000 square foot building will feature 81,000 square feet of retail space on the first two levels accompanied by 444,000 square feet of office space on the upper 15 levels.


Seaport Square Block L4
- May 30, 2019

WS Development Officially Breaks Ground on New Amazon Office Space on Seaport Square Block L4 Governor Baker & Mayor Walsh were on hand earlier this week for the groundbreaking ceremony for WS Development's newest Seaport Project, 111 Harbor Way (Block L4). While construction has been underway for a few months, WS took the opportunity to officially break ground on the upcoming 17-story, 525,000 square foot project. Amazon will be expanding into 430,000 square feet of new office space at the building, creating 2,000 high-tech jobs, in fields including machine learning, speech science, cloud computing, and robotics engineering. Michael Touloumtzis of Amazon told the crowd Amazon continues to expand in Massachusetts partly due to the strong talent pool here and his team is excited to expand into the high-tech new space sometime in 2021. Yanni Tsipis of WS Development touched on the importance of the project in expanding the public realm with an emphasis on green space. Harbor Square Park will be a focal point of the future Harbor Way, a 1/3-mile public promenade that will connect Summer Street to the water’s edge – a plan conceived of by the world-renowned landscape architecture firm James Corner Field Operations, possibly best known for their work on Manhattan’s High Line.   The event which featured mini-lobster rolls, steel drums, and some delicious Taiyaki Ice Cream was capped off with the firing of confetti cannons. Photos courtesy: Michael Blanchard


Seaport Square Block L4
- May 23, 2019

WS Development & Amazon to Break Ground on Tuesday in the Seaport Seaport will usher in its next exciting wave of development with the groundbreaking of 111 Harbor Way (Block L4 of the Boston Seaport project), home to Amazon’s new office in the heart of the Seaport neighborhood. Attendees will include Governor Baker, Mayor Walsh, the WS Development team and representatives from Amazon. Slated for completion in 2021, the building is a central component of WS Development’s Boston Seaport project, the largest single real estate endeavor in city history, spanning 23 acres across 20 city blocks. 111 Harbor Way is a 525,000 square foot, 17-story building with two stories devoted to retail and restaurant uses. Last year, Amazon announced it would expand its Boston Tech Hub and create an additional 2,000 high-tech jobs, in fields including machine learning, speech science, cloud computing, and robotics engineering. To accommodate the new job creation, Amazon will be expanding into 430,000 square feet of new office space at 111 Harbor Way. WS Development chose esteemed architectural firm Gensler to envision and design the tower. In a collaboration between its Boston and San Francisco offices, Gensler respected the authentic industrial context of the Seaport, creating a building that has a timeless aesthetic and a highly articulated expression. The building’s design emphasizes human-focused elements, including outdoor terraces on alternating floors and the Paseo, a street-level interior public promenade lined with shops, cafes, and a welcoming central amphitheater. The Paseo will lead pedestrians to Harbor Square Park, a one-acre public space being constructed concurrently with the building, which will expand the public realm in the Seaport and create a vibrant new open space hub for the Seaport. Harbor Square Park is a focal point of the future Harbor Way, a 1/3-mile public promenade that will connect Summer Street to the water’s edge – a plan conceived of by the world-renowned landscape architecture firm James Corner Field Operations, possibly best known for their work on Manhattan’s High Line. The park will create a hub of community activity across all seasons, hosting hundreds of public events annually including art and music performances, markets, and a public winter skating rink.


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5

No Reviews


Projects

Seaport Square Parcel P
14 Haul Road, Boston, MA, 02210
Lincoln Yards