At CUBE 3 Studio, we pride ourselves on providing creative, intelligent designs that take three very important factors into consideration: clients’ needs, budgets and the environment. By balancing these vital aspects, we ensure every design element has a point. And a point of view. Step inside any of our buildings and you’ll know what we mean.

Updates

BLVD at Revere Beach
- Jul 05, 2019

Site Work Underway for BLVD at Revere Beach With existing buildings on the site demolished, site work is now underway for BLVD at Revere Beach. The oceanfront project from developer, NRP Group, will include 145 rental apartments along with 2,500 square feet of ground-floor retail space. The luxury homes at BLVD will offer residents an amenity package including the ability to rent sea kayaks, as well as a courtyard with fire pits, bocce courts, a saltwater pool, barbecue grills, a sky lounge, a state-of-the-art fitness center, a cyber lounge, and a pet spa. Construction is expected to be complete sometime in 2020.


Emery Flats
- Jun 03, 2019

Emery Flats In Woburn Now Leasing: Expected First Occupancy in July Leasing has kicked off for the 200 unit Emery Flats in Woburn with construction nearly complete on the first building in the development. Residences range in size from studios renting for $1950 to 3 bedrooms at $3600 per month with first units expected to be available around July 15th. The second building in the project should be complete sometime in September. Resident amenities at Emery Flats will include an outdoor pool, fitness center, rooftop lounge, and co-working area.   


The Mark at DeNormandie Wharf
- Jun 03, 2019

Foundation Construction Ongoing for The Mark at DeNormandie Wharf Foundation work is ongoing along the East Boston Waterfront for The Mark at DeNormandie Wharf. The upcoming 107 unit luxury project has already sold 50% of the units in Phase II. Resident amenities at The Mark will include an outdoor waterfront terrace along with a billiards lounge and movie/golf lounge. The development is located just a few blocks from Maverick Square.


Saint Gabriel’s Monastery Redevelopment
- May 22, 2019

Various Stages of Construction Ongoing for St. Gabriel's Redevelopment as Leasing Kicks Off The redevelopment of the 11.6 acre St. Gabriel's Monastery site in Brighton is ongoing with window install and exterior work ongoing for the first new construction residential building along with framing for the latter stages of the project. Renovations are also progressing on the Monastery that is being preserved and converted to apartments as part of the development. As construction progresses, leasing has kicked off, inviting prospective residents to "be a part of history in the making". In total the development will include 555 apartments and 105 of condominiums units. Residents will have access to 22,000 square feet of community spaces including a resort style Infinity pool with sundeck, a 5,000 SF fitness center with Peloton bikes and on-demand fitness, and a sky lounge with views of downtown Boston.


455 Harvard Street
- May 15, 2019

455 Harvard Street in Brookline Takes Shape Framing is complete and window install is underway for 455 Harvard Street in Brookline. The four-story building will feature 17 apartments, 4 of which will be designated affordable, along with over 1,700 square feet of ground-floor retail space. Residents will have access to a roof deck and on-site parking.


Lightview Northeastern
- Apr 25, 2019

Northeastern's New Residence Hall Fully Leased for Fall as Construction Continues Northeastern University's new Residence Hall, Lightview may still be under construction but the project is already fully leased for the upcoming fall semester. The 21-story tower will include 221 student housing units with a total of 812 beds. Interior finishing is ongoing for the 1, 2, 3, and 4 bedroom units. Resident amenities will include a social lounge, a recreation, and gaming area and a fitness center. Lightview is set to open this fall. 


The Mark at DeNormandie Wharf
- Mar 27, 2019

Site Work Begins for The Mark at DeNormandie Wharf With sales of the luxury waterfront building already underway, site work has started for The Mark at DeNormandie Wharf in East Boston.  The project will include 107 condominium residences with over 6,500 square feet of ground-floor public shared workspace. Resident amenities at The Mark will include a 5,045 square foot private elevated courtyard with grilling areas, fitness and wellness spaces, lounge areas and small, programmable function spaces. As part of the project, a new 240 linear foot Harborwalk section will be constructed along Boston Harbor, filling a missing link in the Harborwalk between Carlton Wharf and Lo Presti Park.


4-48 Commercial Street
- Mar 19, 2019

Site Work Begins for Mixed-Used Development in Weymouth Landing Site work has started for the next mixed-use development along Commercial Street in Weymouth Landing. The project which will feature 87 residential units along with ground floor retails space sits next to the recently completed Landing 53. The site, on the Weymouth side of the border, offers easy access to the Commuter Rail.


Emery Flats
- Mar 11, 2019

Construction Ongoing for 200 Unit Project in Woburn Interior and exterior work are ongoing for the two building project, Emery Flats just north of Boston in Woburn. The development will feature 200 apartments, a mix of studio, one, two, and three bedrooms. Building amenities will include a fitness center, rooftop lounge, game space, co-working area, a clubroom with a full kitchen and an outdoor swimming pool. First units are expected to welcome residents in early summer.


Broadstone Bare Cove
- Mar 05, 2019

220 Unit Project Taking Shape in Hingham Construction is rapidly progressing on the two buildings that will make up Broadstone Bare Cove, just off Route 3A, in Hingham. The project will feature 220 residential units along with many indoor and outdoor amenities including a pool and resident sky lounge. The 12-acre site sits adjacent to Bare Cove Park, a 484-acre historic town-owned park situated along the banks of the Weymouth Back River. Construction on Broadstone Bare Cove is set to be complete in late 2020. 


Saint Gabriel’s Monastery Redevelopment
- Feb 07, 2019

Framing Rising for First New Construction Building at St. Gabriel's The redevelopment of 11+ acre St. Gabriel's site in Brighton is in full swing with framing rising for the first new construction building that will part of the massive project. This first building is set to contain 127 units with plans to open later this year. At the Monastery exterior repairs are ongoing while on the inside crews are beginning the framing to transform the space into 27 apartments. Foundation work is also ongoing for Buildings 2 & 3 which are expected to be complete in fall 2020. In total, the project will include 555 residential apartment units, and 105 of condominiums units, and around 510 parking spaces.      


455 Harvard Street
- Jan 22, 2019

Core Climbing for 455 Harvard Street in Brookline The concrete core is climbing for the upcoming four-story, mixed-use project along Harvard Avenue just a few blocks from Coolidge Corner. The project will feature 17 rental units along with 1,735 square feet of ground-floor retail space. The units range in size from one to three bedrooms and a few offer private roof decks. Construction is set to be complete this summer.