Epsilon Associates At A Glance


PROJECT STATUS
Construction Complete: 3 |
Under Official Review: 1

WORK BY SECTOR
Retail: 1 |
Office: 1 |
Housing: 1 |
Educational: 1 |
Healthcare: 1

PROJECT SIZES
$0 - $10M: 0 | $10M - $100M: 2 | $100M+: 2

Totals

Total Square Footage Free
Total Dollar Volume Free

General

Established 1997
Website Free
Phone Number ITK

Proud Member Of:


Epsilon Associates, Inc. is an environmental engineering and consulting company specializing in securing environmental approvals for real estate, energy, and infrastructure development projects for public and private sector clients. Our reputation for practical strategies, a focused work effort, and successful project outcomes has made Epsilon an industry leader.

Updates

Innovation and Design Building
- Jan 12, 2020

$2.4M Fit-Out Permit Pulled for Fit-Out at Innovation & Design Building Corderman & Company has pulled a permit valued at $2.442M for the fit-out of Suite 601 at the Innovation and Design Building. The project will include select demo along with new flooring, ceilings, millwork, and MEPs.  


Innovation and Design Building
- Nov 18, 2019

$1.19M Permit Pulled for Renovations to Holly Hunt Showroom  A permit valued at $1.19M has been pulled for renovations to the Holly Hunt showroom at Boston's Innovation and Design Building in the Seaport. The permit was pulled by Corderman and Company and includes selective demo along with new painting and millwork. 


Innovation and Design Building
- Nov 01, 2019

Permit Pulled for Renovation to MassChallenge Space in the Seaport Corderman & Company has pulled a permit for interior renovations of MassChallenge's event space at 21 Drydock Avenue. The project will include selective demo, new flooring and millwork and modification of MEP's and fire alarms system. The permit is valued at $416K.


Brigham and Women's Faulkner Hospital Addition
- Jul 31, 2019

Faulkner Hosptial Addition Under Review The proposed addition to Brigham & Women's Faulkner Hospital is now under review with the organization filing a PNF earlier this week. The project calls for a 5-story, 98,000-square-foot Inpatient Addition next to and south of the hospital's main entrance, which will include 78 new inpatient beds as well as clinical support and ambulatory space. Plans would also add three levels onto the existing East Parking Garage to include 171 new spaces. The West parking garage would also be replaced with a new structure adding another 332 parking spaces.  


Brigham and Women's Faulkner Hospital Addition
- Jun 16, 2019

LOI Filed for Addition to Faulkner Hospital Brigham & Women's Faulkner Hospital has filed a Letter of Intent to build a 5-story, 98,000 square foot addition to the south of the hospital's main entrance. The Inpatient building would feature 78 new beds as well as clinical support and ambulatory space. The addition would represent the hospital's first development since 1995 and the first new inpatient building since 1976.


3521-3529 Washington Street
- Jul 31, 2018

Foundation Work Underway at 3521-3529 Washington StreetFoundation work is ongoing at 3521-3529 Washington Street in Jamaica Plain.  This upcoming project will include 132 residential units, 25,000 square feet of retail and a four-story, 132,000-square-foot self-storage facility.  The site located near the Forest Hills MBTA station, will also include 166 parking spaces.


100 Shawmut
- Jul 13, 2018

Approval of Shawmut Avenue/Washington Street Block in South End to create 536 residential unitsThe Shawmut Avenue/Washington Street Block project will include three new buildings and represents a collaborative effort between the developer and two Chinatown community organizations, the Chinese Consolidated Benevolent Association of New England (CCBA) and Boston Chinese Evangelical Church (BCEC).The first building, 112 Shawmut Avenue, will be a maximum of 13 stories and consist of 139 residential units, associated residential amenity spaces, and a three-level enclosed garage containing 110 parking spaces, as well as related site and landscape improvements.The second building, 120 Shawmut Avenue, will include the expansion of the BCEC building to consolidate BCEC’s services onto one site. The improvements at 120 Shawmut Avenue will consist of either the demolition of a portion of the existing facility and the construction of a vertical addition, or the new construction of up to a 12-story structure to house two religious sanctuaries with combined seating for 1,130 people, a gymnasium, fitness rooms, offices, classrooms and meeting spaces for religious education, recreational and social services uses, a small ground floor commercial space, and 84 residential units on the upper floors of the building.The third building, 50 Herald Street, is currently owned by the CCBA. The 50 Herald Street building will be nine stories and set back at the corner of Herald and Washington Streets, rising to 14 stories further south along Washington Street. The building will contain 313 residential units with ground floor retail, commercial, cultural, and/or community space along Washington Street. In addition, there will be an underground garage with 120 parking spaces.


The Overlook at St. Gabriel’s
- Jul 09, 2018

Saint Gabriel's Construction OngoingConstruction is ongoing at 159 Washington Street in Brighton, the site of the Saint Gabriel’s Monastery. The project is slated for completion in mid-2019. The project consists of the construction of two five-story high new 400 Residential units, referred to as building two and three. Building two has a maximum footprint of 28 200 square-feet and building three has 37 500 square-feet. The first floor consists of parking in building two and residential units in building three. and residential and amenity spaces on the second floor through 5th floorsPer the project's Expanded Project Notification Form (EPNF), resident amenities could include "a fitness center, indoor basketball court, common lounges, kitchens, games room, café, outdoor pool, outdoor grills, and a generous amount of hard and soft landscaped areas." A total of approximately 395 parking spaces would be constructed on site.


Innovation and Design Building
- Jul 06, 2018

Flour Prepares For September OpeningThe 8th Flour location plans to open this September in Boston's Innovation and Design Building. Permitting includes a change of occupancy to include commissary kitchen with an interior fit-out of a new commercial kitchen in accordance with plans filed. Additional work includes new flooring, ceilings, kitchen equipment, and new MEP equipment.Flour was founded in 2000 by Joanne Chang and has become Boston's most popular bakery and cafe. In 2016, Chang won a James Beard Award for Outstanding Baker.


Exchange South End
- Jul 05, 2018

Exchange South End Awaits ApprovalWith the Exchange South End proposal under board review, the $600 million commercial development is still aiming to begin construction in the fall of 2018. The development would transform 5.6 acres of South End real estate into a massive mixed-use opportunity for the neighborhood.The nearly 1.6 million square foot project would include four new buildings featuring approximately 1,481,350 square feet of commercial, technology, and life science research space with 42,500 square feet of ground-floor retail space and 30,000 square feet of civic and incubator space oriented about a new public park.Over one acre of new pedestrian-friendly public open space, known as Albany Green, would be constructed on site. Exchange South End would host 4,000 to 7,000 new jobs, and represent a total investment of over $1 billion in the South End neighborhood.


100 Shawmut
- Jun 21, 2018

Development Looks to Add to Boston's Roaring South EndThe proposed development at 112 Shawmut Ave in Boston's South End is still under review but looks to add to the roaring Boston neighborhood that shows no signs of slowing down. 112 Shawmut Ave would total 192,568 square feet and would include 124 parking spaces provided across three levels, including one below grade. Bicycle storage space would be provided on site. 112 Shawmut Avenue is located steps from The Lucas, an upcoming luxury condominium development set in a historic church, and near multiple recently completed, under construction and approved mixed-use developments including National Development’s Ink Block, Related Beal’s 370-380 Harrison Avenue and UDR’s 345 Harrison. The project remains on schedule using Touchplan, a construction software that allows developers to plan, implement, and monitor projects in their entirety. The innovative software gives developers the ability to see the full spectrum of their project down to every last detail. Touchplan has let developers keep their projects on or ahead of time leading to lower costs and more efficient construction.


The Overlook at St. Gabriel’s
- Jun 13, 2018

Building Permit Issued for Brighton Development ProjectA building permit has been issued for the Saint Gabriel's Monastery Redevelopment project in Brighton, MA.The project consists of the construction of two five-story high new 400 Residential units, referred to as building two and three. Building two has a maximum footprint of 28 200 square-feet and building three has 37 500 square-feet. The first floor consists of parking in building two and residential units in building three. and residential and amenity spaces on the second floor through 5th floors


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5

No Reviews


Projects

Brigham and Women's Faulkner Hospital Addition
1153 Centre Street, Boston, MA, 02130
New England Conservatory Student Life and Performance Center
241 Saint Botolph Street, Boston, MA, 02115
Innovation and Design Building
23 Drydock Avenue, Boston, MA, 02210