H Carr & Sons is a New England Regional General Trades Contractor with offices in Boston, Providence, & Connecticut. A 3rd generation family-owned business for 90 years, H Carr can handle any sized project and excels in delivering high-quality work on time and handling the unique challenges of each job. See our website hcarr.com for a list of projects & more details.

Our Scopes of work covers the following and much more:

Drywall & Taping

Plaster- Venetian, 3 Coat & lath, 2 Coat with Blue board, Acoustical, ornamental 

Interior & Exterior Light Gauge Metal Framing

Acoustical Ceilings-including wood ceilings, acoustical wall panels & metal panel 

Fiber Cement Panel Siding-Hardie, Swiss Pearl, SVK among brands installed

Spray on Fireproofing- Dry & Wet mix

EIFS & DAFS

Division 10 Specialties- Mailboxes, Fire Extinguishers & Cabinets, Cornerguards, FRP, recessed floor mats

Firestopping- Hilti, STI

Doors, Frames, & Hardware- Installation

Updates

Bulfinch Crossing
- May 28, 2020

Final Touches Underway for The Sudbury: Leasing Kicks off This Summer With leasing to kick off this summer, finishing touches are underway for The Sudbury. The 45-story tower is the first building within the nearly 3 million square foot Bulfinch Crossing development. The Sudbury will offer luxurious homes for both renters and buyers with 368 apartments & 55 condos. The condos will range in size from 1738 to 2766 square feet, with just 5 homes per floor. Condo residents will also have access to an exclusive rooftop garden on the 48th floor. Other amenities, accessible for all residents will include a resort-style pool deck with lounge areas, a wrap-around 32nd floor Sky Deck with fire pits, and a Sky Lounge.    


Worcester Courthouse Redevelopment
- May 07, 2020

Interior Finishing Kicks off for the Worcester Courthouse Redevelopment With heightened safety regulations in place, Tocci Building continues work on the redevelopment of the historic Worcester Courthouse. Framing and rough MEPs are underway in the 1800s Building, and in the Annex finish work has started. The building which was originally constructed in 1843 and had been vacant since 2008 is being converted into 114 apartments. Units will range in size from studios through three bedrooms and amenities will include a fitness center, clubhouse lounge, and gallery space.  Photos: Tocci Building Corporation


Harvard University Science and Engineering Complex
- Apr 13, 2020

Harvard Pushes Back Opening of Science & Engineering Complex to Spring 2021 Originally expected to open this fall, Harvard has now announced the new Science and Engineering Complex will now open in the spring semester of 2021. Dean Frank Doyle of the Harvard John A. Paulson School of Engineering and Applied Sciences said in a statement, “due to the temporary suspension of construction work by the city of Boston, and our collective response to the coronavirus public health emergency, the SEC will not be ready in time for a summertime move-in and fall opening as previously planned. The good news is that, following a nearly five-year construction process, once construction fully resumes the SEC will be just weeks away from being ready for occupancy.” When complete the $1B project will be the new hub of learning for over 1,800 science and engineering students, researchers, and faculty and will serve as a new iconic gateway to Harvard’s growing Allston campus.  


Velo JP
- Mar 17, 2020

Certificate of Occupancy Issued for First Units at Velo JP A certificate of occupancy has been issued for the first tower, 122 units, at Velo JP along with the amenity space and 1/2 of the shared garage. When complete Velo will feature 250 units in total along with just over 4,000 square feet of retail space. The transit-oriented project is located directly across the street from the Forest Hills MBTA station.


Bulfinch Crossing
- Mar 08, 2020

Amenity Spaces Coming Together at The Sudbury While interior finishing is ongoing for the luxury residential units at The Sudbury, work also continues for the install of the building's pool. Along with the pool offering amazing views, residents will have access to a fitness center, clubroom, and sky lounge and terrace. The Sudbury will consist of 368 apartment units and 55 condos. The first units are expected to open this spring. Photo: @thesudburyboston


10 Fan Pier Boulevard
- Feb 25, 2020

Core Construction Continues for 10 Fan Pier Boulevard The final stages of core construction are underway for the 17-story office building at 10 Fan Pier Boulevard as the top part of the building continues to be structured. When completed the building will be home to Massachusetts Mutual Life Insurance Company (MassMutual) and about 1,000 of their employees. 


Bulfinch Crossing
- Feb 17, 2020

Foundation and Site Work Underway for One Congress Site and foundation work is underway for One Congress at Bulfinch Crossing. One Congress, the future home for State Street's headquarters will feature over 1 million square feet of Class A office space.  Amenities will include a grand three-story lobby, conference facilities, and a one-acre landscaped terrace. 


Bulfinch Crossing
- Jan 20, 2020

Interior Finish Work Ongoing for The Sudbury at Bulfinch Crossing With the first phase of move-ins expected this coming spring, interior finishing is ongoing for The Sudbury, the first building at Bulfinch Crossing. The 45-story tower will feature 368 apartments plus 55 condos. Resident amenities will include a rooftop garden and lounge, fitness facility and pool, clubroom, pet spa, and sky lounge. 


10 Fan Pier Boulevard
- Dec 28, 2019

Crane in Place at 10 Fan Pier Boulevard The tower crane is now in place and the concrete core is climbing at 10 Fan Pier Boulevard. The Seaport office project will feature 300,000 square feet of Class A office space, to be home to MassMutual. Completion of 10 Fan Pier Boulevard is expected in 2021.


Bulfinch Crossing
- Dec 17, 2019

$10.8M Electrical Permit Issued for One Congress An electrical permit valued at over $10.8M has been pulled by J&M Brown for One Congress. One Congress, the upcoming 600-foot office tower as part of Bulfinch Crossing will feature over 1 million square feet of Class A office space.  Amenities will include a grand three-story lobby, conference facilities, and a one-acre landscaped terrace. 


Bulfinch Crossing
- Dec 11, 2019

Bulfinch Crossing Secures $570 Million in Construction Financing The Bulfinch Crossing development has secured $570 million in construction financing via Wells Fargo. Bulfinch Crossing is a 2.9-million-square-foot multi-phased development project that will replace the existing above-grade concrete Government Center Garage with six mixed-use buildings, a pedestrian-friendly streetscape and a public plaza on two appropriately-scaled urban blocks spread across approximately 4.8 acres. The demolition of a major portion of the garage over Congress Street will allow for daylight to shine on Congress Street for the first time in more than 40 years.


Velo JP
- Dec 09, 2019

Interior Finishing Ongoing for Velo JP: First Units Expected to Open Early 2020 Interior finishing is ongoing for the first set of units at Velo JP (formerly known as The Residences at Forest Hills). The three-building project will include 250 apartments and 4,070 square feet of ground-floor retail. Residents will have access to an array of amenities including an outdoor courtyard with yoga and exercise space and personal garden plots along with a clubhouse to feature community lounge space and fitness center. First residents are expected to move in sometime in early 2020. 


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5

No Reviews