1258 Mass Ave
- Sep 19, 2019

Plumbing Permit Issued for 1258 Mass Ave Project A plumbing permit has been issued for the project at 1258-1272 Massachusetts Ave. The two-building project will include a total of 40 apartments, including five affordable units, and approximately 1,500 square feet of sub-dividable ground-floor commercial space. Apartments will include studio, one-bedroom, and two-bedroom configurations and will range from 600 to 900 square feet.


319-327 Chelsea Street
- Sep 13, 2019

Change of Ownership Approved for East Boston Project The Boston Planning Board has approved the change of ownership of the previously approved project at 319-327 Chelsea Street in East Boston. The project will include 38 rental units, ground floor retail space and parking for 42 cars.  The project will replace the Magrath Funeral Home on the site. As the funeral home has now been relocated the new owners, MG2 Group, are looking to advance the project. 


Stadia 50
- Jul 08, 2019

Stadia 50 in Brighton Taking Shape Framing is nearing the top floor for the upcoming condo project at 46 Hichborn Street in Brighton, dubbed Stadia 50. The luxury building will include 46 condos, 13 of which will include private roof decks.  Also on the roof will be a common roof deck along with a swimming pool. Additional amenities would include a yoga and fitness room, a community room, a gym, and individual storage rooms. 50 garage parking spaces would be located in a lower and ground level interior parking facility. Upcoming residential building featuring 46 condominium residences located steps from the 15.2-acre Boston Landingmixed-use development and commuter rail station. Residences would include 6 studios, 7 one bedrooms, 7 one-bedroom-pluses, 22 two-bedrooms, 3 two-bedroom-pluses, and 1 three-bedroom. Six residences would be designated affordable. A number of residences at Stadia 50 will feature private exterior decks. 13 private roof decks would also be constructed, in addition to a large common roof deck with a rooftop pool. Additional amenities would include a yoga and fitness room, a community room, a gym, and individual storage rooms. 50 garage parking spaces would be located in a lower and ground level interior parking facility. Bicycle storage will also be provided at Stadia 50. The building would be LEED-certifiable and incorporate sustainable features and green living materials.    


917 Bennington Street
- Jul 08, 2019

Concrete Core Rising for 917 Bennington in East Boston The concrete core is rising along Bennington Street in East Boston for the upcoming 5-story apartment building. The project will feature 42 rentals, ranging in size from studios through 2 bedrooms, many featuring private balconies. 917 Bennington is located just steps from the Orient Heights MBTA Blue Line station.


1258 Mass Ave
- Jul 02, 2019

Work Underway for Concrete Core at 1258-1272 Mass. Ave The concrete core for the first of two buildings along Massachusetts Avenue in Dorchester is beginning to climb. The development is set to include two, six-story buildings featuring 40 apartments total. Units will range in size from studios through two bedrooms. Between the two buildings, there will also be around 1,500 square feet of commercial space and 37 parking spaces.


Stadia 50
- May 17, 2019

Framing Started for 46 Hichborn in Brighton Wood framing has started for the upcoming condo project at 46 Hichborn Street in Brighton, just around the corner from Boston Landing. The project will feature 46 condos, a mix of studios through two bedrooms. 6 units will be designated affordable. Resident amenities will include a yoga and fitness space and roof deck with a pool. The project will also include 50 garage spaces. 


24-26 Hichborn Street
- May 09, 2019

Condos at 24-26 Hichborn in Brighton Now Complete Construction is now complete on 20 new luxury condos along Hichborn Street in Brighton, just around the corner from Boston Landing. Residences include four two-bedrooms and 16 three-bedrooms, each featuring a private balcony. The building also features a green roof deck and 26 car garage.  


917 Bennington Street
- Mar 26, 2019

Foundation Work Ongoing for 917 Bennington St. in East Boston Foundation work is ongoing for the upcoming 5-story residential building at 917 Bennington Street in East Boston, just one block from the Orient Heights MBTA Station. The project will hold 42 apartments, a mix of studio, one and two bedrooms. Amenities will include a roof deck overlooking Constitution Beach along with bike storage and garage parking for 45 cars.


Stadia 50
- Mar 07, 2019

Foundation Work Underway for 46 Hichborn in Brighton Foundation work has started for the condo building at 46 Hichborn Street just around the corner from Boston Landing and next door to the nearly complete 24-26 Hichborn. The building will include 46 luxury condos, a mix of studios through three bedrooms, and 50 parking spaces. Building amenities will include a roof deck with a pool and fitness center with yoga room. 


151 Liverpool Street
- Jan 04, 2019

Site Clear at 151 Liverpool Street in East Boston Demolition is complete at 151 Liverpool Street in East Boston to make way for the upcoming 36 unit condo building. The 6-story project will feature a mix of one, two, and three bedroom units along with 36 parking spaces. The roof of the building will feature a series of resident amenities including a deck, exercise facility and running track.


85 Willow Court
- Dec 31, 2018

CO Issued for 85 Willow Court in Dorchester A certificate of occupancy has been issued for the new condo project just outside the South Bay Center in Dorchester. 85 Willow Court features 14 luxury condos and parking for 21 cars.  


75-85 Liverpool Street
- Nov 08, 2018

Demo Permit App Filed for 75-85 Liverpool in East Boston The development team for 75-85 Liverpool Street in East Boston has submitted a demo permit application to clear the existing buildings from the site.  Demo will make way for the approved 22 unit residential building. The new building will also feature 2 office spaces on the ground floor totaling 800sf.  