For over 35 years, Whitney Veigas has been providing great-looking and cost-effective architectural sign programs throughout the Greater Boston area.

Our work is rooted in the conviction that great sign design is both achievable and essential to the success of all projects, regardless of budget or prominence. We work hand in hand with architects, contractors, and owners to complement their vision, and are experts in design that results in practical and smart solutions.

Most of our work utilizes the design-build model because it is efficient, provides upfront costs, and ensures a single point of responsibility from start to finish. With multiple environmental graphic designers and implementation experts on staff, we hold a rare position in the sign industry as a true design-build studio that places equal emphasis on quality design and streamlined implementation.

Updates

Powder House
- Jun 28, 2020

Basis Technology Buys Commercial Condo in Somerville Development Basis Technology has purchased commercial space at 1060 Broadway in Somerville for $8,008,504. The space is part of the Powder House school redevelopment project currently under construction which will include a total of 11,300 square feet of commercial space and 48 apartments.  The Powder House development will also host a variety of public space elements including a lawn and amphitheater and community gardens.


Packard Crossing
- Jun 26, 2020

Construction Continues on Phase 2 of Packard Crossing Foundation work is now advancing for Phase Two of Packard Crossing in Allston, metal framing is being laid for cement pouring. The two-building project will include a total of 114 apartments along with 3,050 square feet of retail space. Resident amenities will include a landscaped roof deck and a fitness center. 


Powder House
- Jun 14, 2020

Interior Finishing Ongoing for Mixed-Use Project in Somerville Interior finish work is ongoing for the redevelopment of the Powder House Community School in Somerville. This adaptive re-use project will create 28 market-rate units, 8 artist live-work units and 12 senior housing units. The project will also include a maker space, a flexible community hub with an outdoor amphitheater, commercial space, and a public park. 


Parcel K
- May 29, 2020

Leasing Underway for Ora Seaport With crews back on site to complete interior finish work, leasing is also underway for Ora Seaport as part of the Parcel K mixed-use development. Apartments within the 304 unit building range in size from 434 square foot studios through nearly 1150 square foot 3 bedrooms. Prices are currently listed at $2610-$9355 per month. Amenities at Ora include a 12th floor Skydeck, fitness center, and rooftop pool.  


Packard Crossing
- May 01, 2020

CO Issued for First Phase of Packard Crossing A temp. certificate of occupancy has been issued for the first phase of Packard Crossing in Allston. The new building, which has restored and integrated the existing Victorian house on the site, includes 38 apartments along with 39 parking spaces. Phase Two of the project, for which foundation was underway before the construction pause will include another 76 apartments, along with 3,050 square feet of ground-floor retail and a 175 space parking garage. 


Packard Crossing
- Mar 08, 2020

Foundation Work Underway for Phase Two at Packard Crossing Foundation work is now underway for Phase Two of Packard Crossing in Allston. Leasing has also kicked off for the first phase of the project, along Gardner Street. Phase one includes 38 apartments. Phase two, along Brighton Avenue, will include below-grade parking for 175 cars plus 76 apartments & 3,050 square feet of retail space. 


Packard Crossing
- Jan 10, 2020

Site Clear for 2nd Phase of Packard Crossing Demo of a commercial building at 45-55 Brighton Ave. is complete and the site is now clear for Phase 2 of Packard Crossing. This new building will feature a below-grade parking garage with 175 spaces, 3,050 square feet of retail space, plus 76 apartments. The first phase of the project, along Gardner Street, features 38 apartments and parking for 39 cars. 


Parcel K
- Dec 29, 2019

Interior Finishing Underway for Parcel K in the Seaport Interior finishing is underway for both Ora Seaport & the Hyatt Place hotel as part of the Parcel K development in the Seaport. The Hyatt Place hotel will feature 294 rooms plus a rooftop gym, and 4,000 square feet of meeting and event space. Next door Ora Seaport, will feature 304 luxury apartments complete with a rooftop pool, landscaped courtyard, and gym and wellness center. A one-level underground parking garage at the project will have the capacity for approximately 450 cars. Construction is expected to wrap up this spring.


TEMPO
- Dec 22, 2019

Framing Complete for Tempo Condos in JP Framing is complete and windows are going in for the Tempo Condos along Washington Street in Egleston Square. The new building will feature 39 luxury condos along with 2,560 square feet of ground-floor retail space. 20 parking spaces will also be included on-site.  Construction is expected to be completed by March 2020.


TEMPO
- Dec 10, 2019

Permit Pulled for New Gas Service to Tempo Condos in JP A permit for new gas service install has been issued for the upcoming luxury condo project, TEMPO in JP. The new building will feature 39 luxury homes along with 20 parking spaces and 3 ground floor retail spaces. Construction is expected to be completed by March 2020.


Haynes House Apartments
- Dec 07, 2019

Work Ongoing for Facade Replacement at The Haynes House Construction is ongoing for the renovation of the Haynes House in Roxbury, originally built in 1974. The renovation plan will generally include significant building envelope improvements with the demolition and replacement of the building’s exterior masonry facade, 100% window replacement, and improved accessible front and rear entrances. It also includes required life safety system upgrades, energy efficiency enhancements, new accessible units, and selective unit and common area upgrades. The 7-story building features 131 affordable family rental apartments.


545 East Third Street
- Nov 14, 2019

Certificate of Occupancy Issued for 545 East Third St. in South Boston A certificate of occupancy has been issued for the 18 unit condo project at 545 East Third Street in Southie. These luxury homes feature chef's kitchens, GE Cafe Designer Appliances, crown molding, and quartz countertops. The project also includes garage parking for 22 cars plus a fitness center.