• S boston102615 071
  • Helical hartford101415 004
  • Helical faneuil04

Totals

Total Square Footage 5,704,051
Total Dollar Volume $851,054,000.00

General

Established 1986
Employees 50
Website http://helicaldrilling.com/
Phone Number 781-995-3584

Helical Drilling is a geotechnical design/build contractor focused on providing innovative, efficient and adaptable geotechnical engineering and ground construction solutions to general contractors, owners, and engineers throughout the Northeastern United States.

Helical is an ENR Top 600 Specialty Contractor specializing in Geopier® Rammed Aggregate Pier® ground improvement, earth retention, grouting, deep foundations, and piles, underpinning and additional geotechnical construction solutions.

Welcome to contact us: info@helicaldrilling.com.

 

Updates

500 Ocean Avenue
- Jul 11, 2019

500 Ocean Ave. Now Leasing With construction wrapping up for the first section of 500 Ocean Avenue in Revere, leasing is underway with first residents expected to take occupancy in early September. The luxury development, along Revere Beach will feature 305 apartments along with 13,000 square feet of amenity space including an outdoor pool, co-working space, and a roof deck with ocean views. Units range in size from 1 through 3 bedrooms and include black kitchen cabinets and slate appliances along with smartphone keyless entry systems and nest thermostats.  


Nova Residences of Quincy
- Jul 09, 2019

Facade Install Wrapping Up For Nova Quincy: Leasing is Underway Facade install is wrapping up for Nova Quincy and leasing is underway for fall move-in. The mixed-use project will include 171 apartments and 15,000 square feet of ground-floor retail. The second floor of the bulding features a series of studios furnished with The Ori Studio Suite. Along with providing ample storage space, the Ori system allows tenants to reconfigure their space at the touch of a button, creating a cozy sleeping room when needed and opening up the living area when they don't.  Resident amenities will also include a fitness center, lounge with shared workspace, and concierge service.


The Harvey
- Jul 09, 2019

Interior Finishing Nearly Complete for The Harvey Interior finishing is wrapping up for Charlestown's newest luxury residential project, The Harvey. The 177 unit project is expected to welcome first residents in mid-August. Units at The Harvey range in size from studios at 475 square feet starting at $2215 per month up to 2 bedroom, 2 bathroom homes featuring over 1,000 square feet of living space renting for over $4,000 per month. Resident amenities include an outdoor courtyard with city views, a fitness/yoga studio, a social lounge, and a dog wash station. The Harvey is targeting LEED Platinum-certifiable.


400 Mystic Avenue
- Jul 08, 2019

Construction Nearly Complete for 400 Mystic Ave: Expected Opening September Construction is wrapping up for the upcoming mixed-use project at 400 Mystic Avenue in Somerville, just minutes from Assembly Row. 400 Mystic Avenue, expected to welcome residents in September, features  27 luxury apartments and around 3,000 square feet of ground floor commercial space. Residents will have access to a roof-top lounge and deck with gas fireplaces and an outdoor kitchen. 


Boston East
- Jul 03, 2019

Boston East Refinanced for $55 Million The property at 126 Border Street has been refinanced for $55 million via TD Bank. Boston East is a six-story mixed-use development on the East Boston Waterfront. Boston East features 200 residential apartments and public waterfront amenities including a Harborwalk, art galleries, historic interpretive exhibits, available kayaks and paddleboards and a boat launch.


South Bay Town Center
- Jul 03, 2019

Steel Framing Almost Complete for Hilton Hotel in South Bay Center Structural steel framing is nearly complete for the upcoming Hilton Hotel as part of the South Bay Town Center redevelopment. The 6-story hotel will feature 130 guest rooms and is expected to be complete sometime next year. The hotel is the final piece of the redevelopment of the 10-acre site which includes new retail/restaurant space along with The Andi apartment building, featuring 475 units, now leasing. 


South Bay Town Center
- May 23, 2019

Foundation Work Started for Hilton Hotel at South Bay Center Foundation work has started for the upcoming Hilton Hotel as part of the South Bay Center's redevelopment. The extended stay hotel will feature 130 rooms along with parking for 77 cars. Construction on the hotel is set to be complete in 2020. 


The Pioneer
- May 10, 2019

First Units Complete at The Pioneer in Everett The first group of units are now available for move in at The Pioneer as work continues to finish off the remaining residences and parts of the courtyard. This 286 luxury project is located in Everett, and the name is a nod to the pioneering spirit of the community. The Pioneer offers unexpected amenity spaces that culminate in an enormous open-air courtyard decked out with a heated pool, fire pits, an outdoor kitchen, and even a poolside movie theater.  First residents were welcomed with a unique housewarming gift, a custom tartan blanket, designed by the Proverb creative team. Construction on the remaining units is expected to wrap up this summer.        


500 Ocean Avenue
- May 08, 2019

Framing Complete for 500 Ocean Avenue in Revere Wood framing is complete for 500 Ocean Avenue along Revere Beach with window install and exterior work also ongoing in parts of the project. This new full-service building will include a total of 305 residential units next to the Wonderland MBTA station. Resident amenities will include a programmed roof deck with unobstructed ocean views; a bar/lounge/media concept; a communal workspace; dynamic fitness concept with outdoor yoga space; outdoor lap pool; dog care facility; and indoor and outdoor gaming activities. A representative for Callahan Construction, the GC for the project, told BLDUP  the target date for first occupancy is 9/1/19.


1785 Columbus Avenue
- Apr 22, 2019

Foundation Work Has Started for 1785 Columbus Avenue With the site clear, foundation work is underway for the upcoming 7-story office building at 1785 Columbus Avenue in Roxbury. The project will include 139,200 square feet of office space along with 1,5000 square feet of ground-floor retail. The 2nd and 3rd floors of the building will be used by Horizons for Homeless Children for childcare and administration. A 157-space parking garage will also be located on site.  


Coppersmith Village
- Mar 27, 2019

Construction Nearly Complete for Coppersmith Village in East Boston Construction is wrapping up and leasing has started for Coppersmith Village in East Boston. The development includes two new apartment buildings along Border Street featuring 56 units and 15 condo townhomes on Liverpool Street. The site is located just a few minutes from the Maverick Square MBTA Station. A total of 37 parking spaces are included under the rental buildings and each townhome includes a one car garage. Coppersmith Village also features a 3,000 square foot ground floor retail/restaurant space.  


The Harvey
- Mar 27, 2019

Facade Install is Underway for The Harvey (and Parts of it are Yellow) Facade install has begun for The Harvey along Rutherford Avenue in the Hood Business Park in Charlestown. The building will be clad in terra-cotta colored rainscreen panels, including a sunny yellow on the interior courtyard facing section of the facade. Architects, CBT designed the building to both emulate the scale and proportion of the existing industrial structures along Rutherford Avenue while serving as a bold and inviting gateway to the revitalized Hood Business Park. The six-story, 177-unit residential building will also feature 10,500 square feet of retail space and parking for 90 cars and 172 bicycles. Construction is expected to be complete later this year.