Project Progress: Under Construction


About 321 Harrison Avenue

South End, Boston, MA

Eight-story, 232,500 square foot office building is under construction on top of the existing three-story, 300 car garage at 321 Harrison Avenue.

The resulting 11-story building will be approximately 150 feet tall and will feature a new glass curtainwall facade. The Roman numerals III II I (3 2 1) will be incorporated into the curtainwall facing the Massachusetts Turnpike, a nod to the building's address. The existing garage will be retained. Approximately 2,500 square feet of retail or gallery space will be added to the existing garage's street level.

The new building will be located on an 83,470 square foot parcel that includes both the existing garage and an existing eleven-story, 235,000 square foot office building at 1000 Washington Street. Approximately 60 parking spaces will be removed from the existing garage to construct the new building at 321 Harrison Avenue. The resulting 240 space garage will serve both the new building and the existing building at 1000 Washington Street.

The existing lobby that connects 1000 Washington Street and the garage will be reconfigured to accommodate the elevator core for the new building, thus connecting both buildings and serving as a shared lobby. The project site will be reconfigured to create new open space, creating a walkable urban experience with widened sidewalks, green space, and outdoor seating.

Renderings of 321 Harrison Avenue:

321 Harrison Avenue Renderings

 

 

 

 

Construction Cost $164,669,530.00
Square Feet 232,500
Sector

Office

Retail

Parking

Stories 11
Height (feet) 150
Start Date Apr 06, 2016
In The Know
Sign up to unlock 30 extra data points.
Current Owner xxxxxxxxxxxxx
Owner Contact Info xxxxxxxxxxxxx
And More Sign up >>

Latest Updates


Mar 06, 2020

Steel Framing Ongoing for 321 Harrison Ave

Read More >>


Jan 05, 2020

Core Rising at 321 Harrison Ave. In The South End

Read More >>


Nov 15, 2019

Tower Crane in Place for 321 Harrison Ave. Addition and Renovations

Read More >>


Aug 14, 2019

Plumbing Permit Issued for 321 Harrison

Read More >>


Jul 03, 2019

The property at 321 Harrison Street in Boston has been refinanced via Goldman Sachs Bank...

Read More >>


Apr 03, 2019

Work Ongoing in Garage for Addition at 321 Harrison Avenue

Read More >>


Dec 31, 2017

321 Harrison office development in South End could break ground by March

Read More >>


Sep 18, 2017

CIM Group acquires 321 Harrison Avenue in South End, site of approved office development, for...

Read More >>


Jan 08, 2017

Revised renderings revealed of 321 Harrison Avenue office building in South End

Read More >>


Sep 16, 2016

321 Harrison Avenue approved, construction could commence Q1 2017

Read More >>


May 27, 2016

New details for proposed South End garage redevelopment across from Ink Block

Read More >>


Feb 08, 2016

New office building proposed in Boston's South End across the street from Ink Block


Nordblom...

Read More >>


Latest Press Releases

Recent Comments

There are no recent comments.

Add Comment