• Download 3

Totals

Total Square Footage 30,104,826
Total Dollar Volume $11,064,283,671.00

General

Established 1988
Website http://www.elkus-manfredi.com/
Phone Number 617-426-1300

Proud Member Of:


Elkus Manfriedi provides architectural, master planning, urban design, space planning, and programming services. The company has had projects ranging from commercial to residential properties. The company is based in Boston, MA. 

Updates

Innovation and Design Building
- Nov 01, 2019

Permit Pulled for Renovation to MassChallenge Space in the Seaport Corderman & Company has pulled a permit for interior renovations of MassChallenge's event space at 21 Drydock Avenue. The project will include selective demo, new flooring and millwork and modification of MEP's and fire alarms system. The permit is valued at $416K.


99 A Street
- Oct 25, 2019

Updated Plans Presented for 99 A Street In response to community concerns, Anchor Line Partners & Alexandria have presented updated plans for the proposed life science building at 99 A Street. The new plans reduce the building height from 133' to 100' and also cut down total square footage from 370,000 to 300,00. A change in parking was also included, up to 162 spaces from 76.   


33 Arch Street
- Oct 22, 2019

$4.76M Reno Permit Pulled for DLA Piper Offices at 33 Arch St. Corderman & Company has pulled a permit for interior office renovations of the 25, 26th, and 27th floors, the DLA Piper offices, at 33 Arch Street. The phased project, valued at $4.76M will include selective demo, new millwork, flooring, painting and MEP's.   


The Hub on Causeway
- Oct 22, 2019

Window and Facade Install Ongoing for Phase III at The Hub on Causeway Window and Facade install continues for Phase III at the Hub on Causeway. The third and final phase of the project will consist of a 21-story 651,500 square foot office tower above the the podium building (Phase I) of the project. Upon completion, Verizon will occupy 440,000 square feet of the tower. Photo: Bowline Construction


Brookline Place Redevelopment
- Oct 21, 2019

CO Issued for 2 Brookline Place A Certificate of Occupancy has been issued for the new Children's Hospital building at Two Brookline Place. The 182,500 square foot building features medical offices along with ambulatory care space over ground-floor retail.


The St. Regis Residences, Boston
- Oct 17, 2019

Foundation Work Continues for The St. Regis Residences, Boston Foundation work continues on the complicated waterfront site, that will be home to The St. Regis Residences, Boston. A series of bright green tanks have popped up on site, containing slurry used for the foundation which will go down to bedrock. The luxury project will contain, 114 condo homes, a third of which have already been sold. The iconic tower will offer a range of units sizes from one-bedrooms through penthouse residences with four finish options.  Residents will have access to owner benefits, as well as the St. Regis brand’s legendary services, including bespoke and anticipatory butler and concierge assistance, and exclusive use of the tower’s entire floor of amenities including swimming pool and outdoor patio, spa, exercise room, library, sports simulator, St. Regis lounge, wine vault, media room and guest suites.


10 Fan Pier Boulevard
- Oct 14, 2019

Foundation Work Ongoing at 10 Fan Pier Blvd. Foundation work is progressing at 10 Fan Pier Boulevard in the Seaport for what will be MassMutual's new home in Boston. The 17-story tower will feature 310,000 square feet first-class office space, enough room for around 1,000 employees. The project will also include ground-floor retail space plus a 5,900 square foot public plaza facing the marina.   


Omni Boston Hotel at the Seaport
- Oct 13, 2019

Framing Progressing for Omni Boston Hotel at the Seaport Framing continues on the upcoming Omni Seaport Hotel with the first set of windows going in at the corner of Summer & D Streets for what will be one of two towers connected by the three-story podium. The 1,055 room hotel will also include 120,000 square feet of meeting space plus an underground tunnel connecting the hotel to the Convention Center across the street. Construction is expected to last through 2021.


Intercontinental Boston
- Oct 10, 2019

Intercontinental to Undergo $5M Interior Facelift A building permit has been pulled for interior renovations to the Intercontinental Boston, which originally opened in 2006. The $5.19M permit calls for new carpet, wall coverings, and paint in the guestrooms on floors 2-12 of the luxury hotel.  


The Hub on Causeway
- Oct 10, 2019

Final Phase of The Hub on Causeway Taking Shape: Move-Ins Begin at Hub50House With a flurry of activity below at the podium level, facade install has started on the third and final phase of The Hub on Causeway, the 21-story office tower. At The Hub, the Star Market is now open, construction is nearly complete for Big Night Live with first acts announced, and the 25,000 square foot Banner Kitchen and Tap is also expected to open this month. The office tower above will contain around 650,000 square feet of space, 440,00 of which has already been leased to Verizon. Across the site, Hub50House, the 440 unit residential tower has also welcomed its first group of residents.


Garden Garage
- Oct 01, 2019

Foundation In Place and Work Begins on the Core for Garden Garage Tower The foundation for the 44 story Garden Garage Tower is in place and work has also started on the core of the building. The West End Tower will feature 469 apartments along with 20,000 square feet of amenity space, and 2,300 square feet of ground-floor retail. The new parking garage under the tower will hold around 830 spaces. Construction is expected to be complete in late 2021.


7INK by Ollie
- Sep 27, 2019

Demo Underway at 7Ink by Ollie Site Demo of the existing 2 story structure that sat on the final Ink Block development site has kicked off. The site is the future home of 7Ink by Ollie, Boston's first major co-living project that will offer units ranging in size from studios through 4 bedrooms. The upcoming 14-story tower will feature 180 units along with ample community space offering an array of social programming and services.  Construction is expected to last around 20 months and be completed in 2021.


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

0.0 / 5.0

Rating Breakdown
1
2
3
4
5

No Reviews