Gables Seaport
- Feb 19, 2020

Construction Wrapping Up at Gables Seaport: Units Now Leasing With pre-leasing now underway, construction is wrapping up at Gables Seaport. The 307 unit luxury building offers units ranging in size from 467 square foot studios through 1291 square foot 2 bed/2baths. Amenities will include a 10,000+ square foot 3rd-floor outdoor amenity deck, pool, expansive lounge with co-working areas, and fully-equipped fitness center. First units are expected to open this spring.


Gables Seaport
- Dec 09, 2019

Gables Residential On Track to Deliver Superior Residential Experience in  Spring 2020 Gables Residential, a leader in multifamily development and management, announced today that the highly anticipated apartment community, Gables Seaport, located on 501 Congress Street, will open in Spring 2020. In conjunction with Drew Company, Gables Residential is bringing a 23-story, 307 apartment home building in South Boston’s Seaport District, an area that has been transformed over the last few years into a bustling waterfront destination with new dining, shopping, and cultural amenities. Apart from the highly desirable location, the building will be distinguished by exquisite amenities and meticulously designed spaces. Residents will indulge in some of the most exquisite features in the area including a terrace designed to be an oasis in the city, complete with swimming pool and an outdoor lounge. Views will be enjoyed by many, and when residents need to travel, they can conveniently do so as the MBTA’s Silver Line is mere steps away. “Seaport offers many of the qualities we seek in a development opportunity, including an irreplaceable site close to transit, employers, retail and entertainment”, said Joe Shea, Director of Development for Gables Residential.   “Drew Company’s history in Seaport has been a great resource, and we look forward to future ventures with them.” Gables Seaport marks the first partnership between Gables and Drew Company in Boston.   “Our focus is on developing communities that offer a variety of amenities and to enhance our residents’ quality of life.  In Boston, that lifestyle embraces a vibrant walkable neighborhood with the appeal of a lively urban atmosphere, with access to public transportation.  Designed with ‘best in class’ finishes, the studio, one, and two-bedroom units are ideal for someone looking to take full advantage of the Seaport lifestyle,” said Jorgen Punda, Regional Vice President Investments at Gables Residential. Gables Residential emphasizes sustainability in all of its projects and Gables Seaport is no exception.  The building has a number of sustainable elements designed for efficiency including a green roof system that will guide rainfall toward plantings and soil, greatly reducing runoff. The building will be certified, LEED Silver.    Gables is working with CBT Architects on the building design, and Halvorson Design on the roof deck and amenity spaces.


Gables Seaport
- Oct 14, 2019

Interior Finishing Ongoing for Gables Seaport Interior finish work is ongoing for the 307 luxury apartments at Gables Seaport along Congress Street directly next to the Silver Line MBTA Station. Gables Seaport will feature a mix of studios through 3 bedrooms and offer residents 24-hour concierge service, a clubroom and outdoor lounge, fitness center, and resort-inspired pool. As the building sits so close to the silver line, only 84 parking spaces are included on-site.  


Gables Seaport
- Aug 15, 2019

Fire Alarm Permit Issued for Waterside Place Phase 1B A fire alarm permit has been issued Waterside Place Phase 1B in the Seaport. The 23--story tower will feature 307 apartments along with 3,500 square feet of ground-floor retail space. Construction is expected to be complete this coming winter.      


Gables Seaport
- Jul 18, 2019

Window and Facade Install Nearly Complete for Waterside Place Phase 1B Just last month the project topped off and now window install has already reached the top floors for Waterside Place Phase 1B. The new luxury apartment tower will feature 307 apartments and 3,500 square feet of ground-floor retail. Located directly next to the MBTA Silver Line the transit-oriented development does include parking for just 84 cars.  The building expects to welcome first residents in winter 2020.


Gables Seaport
- Jun 02, 2019

Waterside Place Phase 1B Tops Off The 23-story tower at 501 Congress Street next to the MBTA Silver Line station has topped off. Waterside Place Phase 1B will include 307 apartments along with 3,500 square feet of retail space. Resident amenities will include a resort style pool, fitness center, pet spa, and an outdoor lounge. Construction is set to be complete in 2020.


Gables Seaport
- May 03, 2019

Window Install Has Started for Waterside Place Phase 1B With framing for the 23-story tower rising window install has started on the lower floors of Waterside Place Phase 1B. The new Seaport apartment tower will feature 307 units, ranging in size from studios through three-bedrooms.  The tower also includes 3,500 square feet of ground-floor retail and a second-floor parking garage with approximately 84 spaces. Waterside Place Phase 1B is be located next to the Silver Line MBTA station, allowing for easy access to downtown.


Gables Seaport
- Apr 17, 2019

Notice of Project Change at Waterside Place This NPC is requesting a change of use for the remaining portion of the ground floor commercial space allocated to an innovation center in Phase IA of Waterside Place. There were approximately 6,555 square feet allocated to such innovation use. Despite diligent efforts that commenced prior to building completion and which still continue, Drew Company, Inc. has not been successful in obtaining a tenant that qualifies as an “innovation” user. Due to a lack of success in attracting any entity that would qualify as an Innovation User, on January 14, 2016, the Agency by Board vote authorized the Developer to lease a portion of this space to the South Boston Community Health Center to provide a much-needed neighborhood service. Prior to that approval and since the Developer used best efforts to find a suitable Innovation tenant for the remaining 3,593 square feet. These efforts have included discussions with approximately twenty-five prospective innovation users. These efforts have not resulted in a single lease for the space. As a result, on March 16, 2017, the Agency by Board vote authorized the Developer to temporarily lease the remaining 3,593 square feet to the general contractor for the Waterside Place Phase 1B project. Unfortunately, due to the high cost of the buildout and time required to complete the buildout, the general contractor made alternative arrangements for the field office for Waterside Place Phase 1B. Drew Company, Inc. has since continued to engage in discussions with potential tenants and brokers in an effort to identify a tenant for the innovation space, from co-working groups to technology-based start-ups to financial firms focused on incubating entrepreneurial enterprises and have engaged Boston Urban Partners to assist with this effort. Unfortunately, it appears that most prospective tenants are either unable to secure financing for their business concepts or had other business reasons affecting their interest in the space. The 3,593 square feet of space continues to sit vacant nearly 5 years after the completion of the project. Recently, the Boston Veterinary Clinic (“Boston Vet”), approached Drew Company, Inc. expressing an interest in leasing the remaining 3,593 square feet of the innovation space to open a second veterinary clinic location in Boston. While the use does not technically qualify as “innovation”, it does provide a much-needed neighborhood service to area residents and workers. Currently serving the South End community, Boston Vet’s expansion to South Boston would be a welcome amenity to the Seaport District, which is woefully lacking in community services for its residents and workers, especially given the high percentage of area residents that have pets with no close proximity to veterinary services. Based on the lack of success in locating a prospective tenant that qualifies as an “innovation” user and the continued need for neighborhood services, the proponent respectfully requests that the Authority approve the change of use request for approximately 3,593 square feet in Waterside Place Phase IA as described in this NPC.


Gables Seaport
- Jan 15, 2019

Framing Begins for Waterside Place Phase 1B With the core climbing, framing has now started for Waterside Place's second phase along Congress Street in the Seaport. The upcoming 23-story tower will feature 307 apartments along with 3.500 square feet of ground floor retail and parking for 84 cars. Minimal parking is needed as this transit-oriented project sits directly next to the World Trade Center Silverline MBTA stop. 


Gables Seaport
- Oct 03, 2018

Work Begins on Interior Core for Waterside Place Phase 1B The interior core for the upcoming phase 1B of Waterside Place on Congress Street is beginning to rise.  The 23-story tower is set to feature 307 apartments along with 3,500 square feet of ground-floor retail. 62 of the residences on the project will be "innovation units".    The first tower of Waterside Place, located next door, was completed in February 2014 and features 236 units.


Gables Seaport
- Feb 25, 2018

Foundation construction begins at Waterside Place Phase 1B apartments in Seaport District Construction of the foundation of the 23-story Waterside Place Phase 1B apartment tower in the Seaport District has begun, following the project’s securing of construction financing last month. The construction team is now beginning to drive structural piles into the project site, and in the coming months, concrete will be poured to build the foundation. The $157 million Waterside Place Phase 1B will feature 307 apartment residences and 3,500 square feet of ground-floor retail, and will be located steps from Boston Harbor and Downtown Boston. The following is a photograph of Waterside Place Phase 1B:


Gables Seaport
- Jan 18, 2018

Waterside Place Phase 1B apartments in Seaport District secure construction financing and long-term ground lease The next phase of the Seaport District’s Waterside Place development, which will feature 307 apartment residences and 3,500 square feet of ground-floor retail, is expected to break ground imminently following developer Gables Residential’s securing of construction financing and a long-term ground lease for the Massport owned project site. Wells Fargo Bank has provided the proponent with a $102 million construction loan, allowing construction of the $157 million project to proceed. Construction fencing has been erected around the site, located at 501 Congress Street, and initial site preparation work has begun. The 23-story Waterside Place Phase 1B tower will contain studio, one-, two- and three-bedroom residences, including 62 innovation units.


No new thoughts. Inquire about becoming a thought leader by clicking here

Average User Rating

Rating Breakdown
1
2
3
4
5

No Reviews


To unlock, this organization must be verified.

Please click here to verify >>

Projects

Gables Seaport