• Cranshaw 1

Totals

Total Square Footage 3,025,389
Total Dollar Volume $1,095,700,000.00

General

Established 1983
Website Please click here to verify >>
Phone Number 617-965-7300

Description

Cranshaw Construction is a general contracting and construction management company with practical design and construction experience. Founded in 1983, the company has successfully completed over 20 million square feet of commercial space, totaling close to $2 billion in suburban and downtown Boston in the last 31 years. They have successfully completed a variety of complex projects ranging from shopping centers, assisted living and manufacturing/research and development facilities to television stations and first class office developments.

 

Cranshaw Construction is an affiliate of National Development, an interdisciplinary real estate firm providing development, property management and investment acquisition services. The company’s affiliation with National Development helps Cranshaw Construction to take an “owner’s perspective” in managing the construction of a project from the earliest conceptual phases through final occupancy.

 

The synergies and feedback received from the other disciplines and services provided by National Development, such as the property management division, allows Cranshaw Construction to have first hand and up to date knowledge as to what building elements and design operate most efficiently and cost effectively without compromising the marketability of the product in the future.

 

The team understands that there are multiple approaches to the development, design and construction of any particular project. Each project presents its own set of unique challenges that must be analyzed and balanced with the owner’s objectives to arrive at the best possible solution.

 

Cranshaw Construction has developed an aggressive approach that will provide for immediate participation of personnel, resources and procedures. We endorse a close working relationship with the owner/tenant and other team members. In the construction of over 20 million square feet, we have an impeccable record of on time and on budget construction.

 

As an owner oriented contractor, our philosophy is to identify costs and issues at the outset of a project, work closely with the project team on value engineering while balancing cost, quality and performance.

Updates

WinnCompanies
- Jun 12, 2019

Wood Framing Complete for Brighton Marine

Wood Framing is complete for the upcoming veteran's housing development along Commonwealth Avenue in Brighton. The project will include 100 apartments, a mix of studios through three bedrooms along with as well as 5,650 square feet of common amenity space. 11 units will be reserved for formerly homeless veterans.

Brighton Marine June

 


National Development
- Jun 03, 2019

Emery Flats In Woburn Now Leasing: Expected First Occupancy in July

Leasing has kicked off for the 200 unit Emery Flats in Woburn with construction nearly complete on the first building in the development. Residences range in size from studios renting for $1950 to 3 bedrooms at $3600 per month with first units expected to be available around July 15th. The second building in the project should be complete sometime in September. Resident amenities at Emery Flats will include an outdoor pool, fitness center, rooftop lounge, and co-working area. 

Emery Flats 1

 

Emery Flats 2


Federal Realty Investment Trust
- May 07, 2019

Work Begins on Core for Future Puma Headquarters at Assembly Row

Work has started on the core for the upcoming 300,000 square foot commercial building at 455 Grand Union Blvd in Somerville's Assembly Row. The nearly 300,000 square foot commercial building will be home to Puma North America, who announced in January they will lease 150,000 square feet of space within the project. The Class A office building will feature 550 dedicated parking spaces and approximately 25,000 SF of ground floor retail. PUMA is expected to occupy 455 Grand Union Boulevard in early 2021 with 450 employees relocating from offices in Boston and their current headquarters building in Westford, Massachusetts.

455 Grand Union Boulevard Somerville


National Development
- Apr 25, 2019

Work Begins on Repositioning of 960 Mass. Ave.

Construction has started for the renovation of the former industrial property at 960 Mass. Ave. Plans call for a new building facade and interior renovations along with updates to HVAC & electrical systems, that will reposition the asset as creative office and light industrial space. The building is located in Boston's Newmarket neighborhood just a few blocks from the South Bay Center. Construction is expected to be complete later this year.

960 Mass Ave REnovations


National Development
- Apr 17, 2019

Exterior Work Nearly Complete for Avenu at Natick

Exterior work is nearly complete with interior finishing ongoing for the upcoming Active Adult community, Avenu at Natick. The 164 unit project, just across the street from The Natick Mall will feature a mix of one and two bedroom homes, 10% of which are designated affordable. Amenities at Avenu Natick will include a 16,000-square-foot, landscaped courtyard, a pool deck with cabanas, lounge and recreation area along with a theater, spa, and fitness center. Units are available for preleasing now with expected opening later this year.

Avenu Natick April


Urbanica Development
- Mar 22, 2019

With Hotel Open, Construction Ongoing for the Residential Portion of The Melnea Hotel and Residences

Exterior work is wrapping up for the residential section of the Melnea Hotel and Residences at the corner of Melnea Cass Boulevard and Washington Street in Roxbury. The first part of the project, The Residence Inn, featuring 135 rooms opened earlier this year. The residential side of the development will include 50 apartments. 8,000 square feet of commercial space is located across the ground floors of the buildings.

Melnea Hotel and Residences Roxbury March


Frankfort Gove LLC
- Mar 15, 2019

Redevelopment of Mount Carmel Church in East Boston Approved

The BPDA has approved the redevelopment of the Our Lady of Mount Carmel Church in East Boston. The project will create a total of 112 residential units, including 14 income-restricted units. Our Lady of Mount Carmel Catholic Church will be renovated and converted into a residential structure with 14 homeownership units.  The approximately 115,000 square foot residential development will include 84 off-street vehicle parking spaces, storage space for approximately 135 bicycles, and open space, landscaping, and other public realm improvements.


National Development
- Mar 11, 2019

Construction Ongoing for 200 Unit Project in Woburn

Interior and exterior work are ongoing for the two building project, Emery Flats just north of Boston in Woburn. The development will feature 200 apartments, a mix of studio, one, two, and three bedrooms. Building amenities will include a fitness center, rooftop lounge, game space, co-working area, a clubroom with a full kitchen and an outdoor swimming pool. First units are expected to welcome residents in early summer.

emery flats woburn


WinnCompanies
- Mar 08, 2019

Structure Beginning to Take Shape for Veteran's Housing in Brighton

Brighton Marine, located just off Commonwealth Avenue, is beginning to take shape. The project will include 102 mixed-income apartments for veterans. The development will combine a new six-story building with a renovated historic structure with units ranging in size from studios through three bedrooms. Brighton Marine will also feature common amenity space for residents.

Brighton Marine Affordable Housing March


Federal Realty Investment Trust
- Mar 01, 2019

Assembly Row's Next Residential Project is Underway

Site work has started at Assembly Row Block 8 for the upcoming mixed-use building that will bring another 500 residential units to the Somerville neighborhood. Block 8 will also include over 26,000 square feet of restaurant and retail space. Residential amenities are set to include a 4th-floor courtyard with a pool & private patios and a rooftop outdoor terrace.

The project sits next to the Orange Line MBTA station and Montaje, completed in 2017, with rents ranging from around $2200 per month for studios up to $5000 for three bedroom units.

Assembly Row Block 8


Federal Realty Investment Trust
- Feb 28, 2019

Construction Launches for 455 Grand Union Blvd. at Assembly Row

Federal Realty Investment Trust broke ground on 455 Grand Union Boulevard at Assembly Row earlier this week with Somerville Mayor Joseph Curtatone and PUMA North America CEO Bob Philion.  PUMA has signed a lease for 150,000 square feet to anchor the new 300,000 square foot retail and office building as the company’s North American headquarters. This celebration marks the launch of Phase 3 of the development, which also includes a new 24-story, 500-unit apartment building with ground floor retail space, across from the Assembly Square MBTA T station. 

Beyond Phase 3, Federal Realty has approximately five more acres of developable land that has been entitled to accommodate up to 1.5 million square feet of office and/or lab development. 

At the completion of Phase 3, Assembly Row will include over 55 shops, 22 restaurants, 1,514 residential units, over 1.1 million square feet of Class A office space, and The Row Hotel, a 158-room Marriott Autograph Collection Hotel, which opened in 2018. 

“PUMA, a worldwide leading sports brand, sees the long-term value of the dynamic, transit-oriented Assembly Row experience and Somerville’s creative energy, as well as the amenity-rich location” noted Patrick McMahon, senior vice president, regional development for Federal Realty Investment Trust. “We look forward to collaborating with both the City and PUMA and welcoming more like-minded companies to this destination campus environment.”    

As part of Federal Realty’s partnership with the city of Somerville, Phase 3 is expected to generate approximately 600 construction jobs and approximately 900 permanent office jobs.  In addition to annual taxes, the project will yield $5.6M in building permit fees and the contribution of $12M over the next several years to the creation of affordable housing in the City.   

Designed by Jacobs, the 13-story Class A office building with 550 dedicated parking spaces and approximately 25,000 square feet of ground-floor retail will be home to PUMA North America’s new headquarters. PUMA is expected to occupy 455 Grand Union Boulevard in early 2021 with 450 employees relocating from its current offices in Boston and Westford, Mass. 455 Grand Union Boulevard is now under construction and over 50 percent pre-leased. Cranshaw Construction is the general contractor and Copley Wolff Design Group is the landscape architect for the project. The neighborhood's existing office space at 450 Artisan Way is currently 100 percent leased.  Additionally, Partners Healthcare is headquartered at Assembly Row with 730,000 square feet of office space.

“We’re excited to have officially broken ground on the new headquarters of PUMA North America,” said Bob Philion, president and CEO of PUMA North America. “We’re confident that our new Assembly Row location will help us bolster PUMA’s presence in North America. We look forward to becoming an integral part of the Somerville community and taking advantage of everything this vibrant city has to offer our employees.

455 Grand Union Ground Breaking

Patrick McMahon, SVP, Regional Development Federal Realty Investment Trust
Matt Ehrie, VP, Regional Portfolio Manager, Federal Realty Investment Trust
Adam Petrik, Global Director of Brand and Marketing, PUMA
Katjana Ballantyne, Councilor, Ward 7 and Council President, City of Somerville
Bob Philion, President & CEO PUMA North America
Joseph Curtatone, Mayor, City of Somerville
Don Wood, President, and CEO, Federal Realty Investment Trust
George Proakis, Executive Director, Office of Strategic Planning and Community Development, City of Somerville
Tom Galligani, Director of Economic Development, City of Somerville
Brad Dutton, V.P. Regional Construction, Development, Federal Realty Investment Trust
David Middleton, General Manager, Assembly Row 


National Development
- Feb 07, 2019

Construction Ongoing for Avenu at Natick

Exterior work is progressing for the new 62+ active adult community, Avenu at Natick. The project will include 164 luxurious rental homes along with plenty of amenities including a 16,000-square-foot, landscaped courtyard, a pool deck with cabanas, a private dining room, theater, spa, fitness center, and yoga rooms. The one and two bedroom residences are now leasing with opening expected later this year.

Avenu Natick


Federal Realty Investment Trust
- Jan 18, 2019

PUMA Leases 150K SF in Upcoming Phase 3 of Assembly Row

PUMA at assembly row 

Federal Realty Investment Trust has signed a lease for 150,000 square feet with PUMA North America to anchor a new 300,000 square foot office building, with ground floor retail space, at 455 Grand Union Boulevard at Assembly Row, the rapidly growing, mixed-use neighborhood just minutes from downtown Boston.  In addition to 455 Grand Union Boulevard, Phase 3 of development includes a new, 24-story, 500-unit apartment building, with ground floor retail space, across from the T station. Beyond Phase 3, Federal Realty has approximately 5 more acres of developable land that has been entitled to accommodate up to 1.5 million square feet of office and/or lab development.

 “Somerville is a vibrant city full of creative energy, easy to get to, and with a spirit that aligns well with our brand,” said Bob Philion, president and CEO of PUMA North America. “We get all the benefits of being in such proximity to downtown and many of our region’s most diverse communities located along the orange line while mitigating commute times for our suburban employees.”

Designed by Jacobs, the 13-story Class A office building with 550 dedicated parking spaces and approximately 25,000 SF of ground floor retail will be home to PUMA’s North American headquarters. PUMA is expected to occupy 455 Grand Union Boulevard in early 2021 with 450 employees relocating from offices in Boston and their current headquarters building in Westford, Massachusetts. 455 Grand Union Boulevard is now under construction and over 50% pre-leased.

“PUMA’s decision to move their headquarters to Assembly Row would not have happened without FRIT’s commitment to work with us to go beyond just building buildings and instead to create Greater Boston’s newest and most vibrant transit-connected neighborhood,” said Mayor Joseph A. Curtatone. “With companies like Partners HealthCare, SmartBear, and now PUMA, the momentum just continues to build in Assembly. We look forward to introducing PUMA—and all the employers to come—to our diverse and talented workforce.”

At the completion of Phase 3, Assembly Row will include over 55 shops, 22 restaurants, 1,514 residential units, over 1.1M SF of Class A office space and The Row Hotel, a 158-room Marriott  Autograph Collection Hotel.  

“We have spent the past ten years working with the City of Somerville to create a dynamic neighborhood that attracts world-class companies,” said Patrick McMahon, vice president development at Federal Realty Investment Trust. “We are excited that PUMA has placed long-term value on the Assembly Row location, our expansive array of high-quality amenities, vibrant mix of uses and direct access to the T and highway.  We look forward to welcoming the PUMA team with our more than 10 soccer fields worth of amenities and watching PUMA sustain its position as an international leader in the sports brand world.” 


Urbanica Development
- Jan 15, 2019

CO Issued for Residence Inn at Melnea Hotel & Residences Project

A Certificate of Occupancy has been issued for the new 135 room Residences Inn by Marriott along Melnea Cass Boulevard in Roxbury. The hotel is part of the 1.3 acre, Melnea Hotel & Residences project. Still under construction is the 50 unit apartment building that will complete the project. The development also features parking for 65 cars and ground floor retail including a restaurant space in the hotel.

 


WinnCompanies
- Dec 12, 2018

Foundation Work Underway for Veteran's Housing in Brighton

Foundation work is ongoing for the upcoming 100 rental unit building along Commonwealth Avenue on the Brighton Marine Health Center Campus. The project will include a mix of studios through three bedrooms, all will be leased with a preference for veterans including 11 units reserved for formerly homeless vets. The building will also include over 5,000sf of amenity space and parking for 87 cars.

Construction is expected to be complete in Summer 2019.

 

 


Trinity Financial
- Dec 03, 2018

CO Issued for First 4 Floors of The Treadmark in Dorchester

A Certificate of Occupancy has been issued for floors 1-4 of the Treadmark in Dorchester. This certificate covers 51 of the 83 residential units. This project also includes around 5,000 sq. ft. of ground floor retail and parking for 30 cars. Completion of the project is a long time coming after a notorious fire destroyed the under-construction building in summer 2017.

 


Urbanica Development
- Oct 30, 2018

Exterior Finishing Nearing Completion for Residence Inn Roxbury

Exterior finishing is nearing completion for the Residence Inn by Marriott that will be part of the Melnea Hotel and Residences development.  The project at the corner of Melnea Cass Blvd and Washington Street in Roxbury will include the 108 room Marriott Hotel along with another six-story 50 unit residential building.  There will also be around 8,000sf of commercial space within the development.

Melnea_hotel_residences


Frankfort Gove LLC
- Oct 09, 2018

Proposed East Boston Development Under Official Review

The proposed redevelopment at the site of the former Our Lady of Mount Carmel Church in East Boston’s Maverick Square neighborhood is under official review by the Boston Planning and Development Agency.

The proposed project would transform the site into 115 residences across two buildings. The church would be turned into 13 residences and to connect it to a new 15-unit building. The plans also call to tear down the convent across the street for a six-story building with 87 units - with part of the building being just four stories tall and mimicking a row of townhouses to better blend in with the neighborhood. 


Trinity Financial
- Sep 20, 2018

Interior Finishing Underway at Treadmark 2.0 in Dorchester

Interior finishing is underway for the 83 residential units coming to Dorchester Avenue across from Ashmont Station. Treadmark 2.0 is expected to open in November 2018 after a fire destroyed the project last summer prior to initial opening. Of the 83 units, 51 are designated as affordable rentals and 32 will be condos. The ground floor of the project will include a 5,000 sf commercial space to feature specialty food market, American Provisions. 

Treadmark


Melnea Hotel and Residences
- Jul 20, 2018

Exterior Work Underway at Melnea Hotel and Residences

Exterior work is well underway, at the corner of Washington & Melnea Cass Blvd in Roxbury, on the new Melnea Hotel & Residences. This upcoming 126,400 square-foot development project will feature two new buildings, a 6-story Marriott Residence Inn hotel, and a 50-unit residential apartment building.  Retail space totaling 8,000 square-feet will be located on the first floor of each building.





Treadmark
- Jul 09, 2018

Exterior Work Continues at Treadmark in Dorchester

The Treadmark in Dorchester has once again reached its full height of six stories after a fire last year forced the demolition of most of the original wood framing.  Exterior work now continues on the 83 unit project. Directly across from the Ashmont, MBTA Station, the development will include a common roof deck, underground parking, and around 5,000 square-feet of ground floor retail.



Brighton Marine
- Jun 21, 2018

Ground Breaking Held for Brighton Marine Residences

Earlier this week Boston Mayor Marty Walsh and Governor Charlier Baker helped break ground for the upcoming Brighton Marine Residences.  This project will create just over 100 units of affordable housing for veterans in the Boston area.

The six story building positioned along Commonwealth Avenue, with easy access to the MBTA Green Line, is expected to be completed by Fall 2019.



AC Hotel Boston Cleveland Circle
- Jun 20, 2018

Certificate of Occupancy at The Circle in Brighton

Certificate of occupancy issued for the AC Hotel in Cleveland Circle (The Circle). The 218,520 square foot mixed-use development at the former Circle Cinema site in Cleveland Circle features both a five-story, 162-room AC Hotel by Marriott and a six-story, 92-unit Waterstone luxury adult apartment community will be located at The Circle.

The project includes a total of approximately 14,000 square feet of retail space. A total of 188 parking spaces are on site, including 103 in underground parking garages underneath both buildings and 85 at-grade spaces.


Siena at Ink Block
- Jun 13, 2018

Skylounge Now Open at Siena at Ink Block

The Skylounge rooftop is now open at Siena at Ink Block. Reserved for residents of Siena, the Skylounge is tailor-made for entertaining needs, from special occasions to mid-week gatherings. Head to the Skylounge for an after-work cocktail. Unwind by the sparkling fireplace in the lounge. Get the party started by the outdoor fire pit. Or treat guests to dry-aged steaks cooked to perfection on the gas grill.

This Boston roof deck is like no other. Designed by Elkus Manfredi Architects, every detail is thought through. Take the large garage-style door that lets light pour in and air flow freely between the lounge and the deck during mild summer nights. Or consider the surprising pops of color and refined millwork throughout the rooftop Skylounge, a nod to the fashion-forward styles and tailored lines of Siena, Italy.

Exterior illumination lends a tranquil feel to the space and creates an intriguing crisscross pattern on the façade, just enough for passersby below to notice. Even as you take a seat in one of the elegant sectionals on the deck, glass railings provide unobstructed views of the city.


AC Hotel Boston Cleveland Circle
- May 03, 2018

AC Hotel Construction Complete in Cleveland Circle

Construction of the AC Hotel in Cleveland Circle is now complete with a planned opening for mid-May. The 218,520 square foot mixed-use development at the former Circle Cinema site in Cleveland Circle will feature both a five-story, 162-room AC Hotel by Marriott and a six-story, 92-unit Waterstone luxury adult apartment community will be located at The Circle. 

The project includes a total of approximately 14,000 square feet of retail space. A total of 188 parking spaces are on site, including 103 in underground parking garages underneath both buildings and 85 at-grade spaces.


AC Hotel Boston Downtown
- Mar 04, 2018

New-construction AC Hotel Boston Downtown opens at Ink Block in South End


The newly built AC Hotel Boston Downtown, a 205-room boutique hotel located at the South End’s Ink Block development, has opened. Construction is complete, and the hotel's AC Lounge cocktail bar and lounge and AC Kitchen restaurant are now serving food and drinks. AC Hotel Boston Downtown features amenities including a 24-hour fitness center and yoga studio, an indoor pool and meeting/event space, and is located minutes from the Financial District, the Seaport District and Logan Airport. The following is a photograph of AC Hotel Boston Downtown:



Mount Carmel Development
- Feb 27, 2018

East Boston church property slated for residential redevelopment


The site of the shuttered Our Lady of Mount Carmel Church in East Boston’s Maverick Square neighborhood could be redeveloped into 115 residences per newly revealed plans. Frankfort Gove LLC proposes to restore and expand the existing church, and construct a new four-to-six-story residential building on the site. The expanded church would contain 28 residences, and the new building would contain 87. The existing rectory and convent buildings are structurally deficient and would be demolished. The proponent has filed a Letter of Intent (LOI) to develop the site with the City of Boston, starting the project's review process.


Brighton Marine
- Feb 16, 2018

Financing secured for 102-unit Brighton apartment development


A 102-unit apartment development in Brighton that will be aimed towards veterans has secured financing and is expected to break ground this Spring. The $43 million building, developed by Brighton Marine Health Center and WinnCompanies, will open by Fall 2019 and include 11 apartments reserved for homeless veterans. Residents will have easy access to Brighton Marine’s existing medical and social services campus, which will remain on site. Financing partners for the development include Bank of America, Boston Community Capital, the City of Boston and the State of Massachusetts.


AC Hotel Boston Downtown
- Feb 11, 2018

Finishing touches underway at AC Hotel Boston Downtown, opening early 2018


Finishing touches are underway at AC Hotel Boston Downtown, a new 205-room boutique hotel opening in the first quarter of 2018 located adjacent to the South End’s Ink Block development. Black exterior finishes, windows and signage have been fully installed along the hotel’s facade. Inside AC Hotel Boston Downtown, the construction team is putting finishing touches on the hotel’s rooms and common spaces. When completed, AC Hotel Boston Downtown will feature amenities including a 24-hour fitness center and yoga studio, an indoor pool, the AC Lounge cocktail bar and lounge, the AC Kitchen restaurant offering European-inspired breakfast and meeting/event space. The following is a photograph of AC Hotel Boston Downtown:


AC Hotel Boston Downtown


Siena at Ink Block
- Feb 06, 2018

Finishing touches underway at South End’s Siena at Ink Block new-construction luxury condominiums


The stunning facade of the South End’s eight-story, 76-unit Siena at Ink Block new-construction condominium building, featuring black and white exterior finish panels meshed with floor-to-ceiling glass, has been just about fully installed. Luxurious interior finishes are now being installed inside the building, including quartz countertops, stainless steel Bosch appliances, hardwood flooring, bathroom tiling and wool carpets in bedrooms, ahead of Siena at Ink Block’s anticipated opening early this year.


Finishing touches are also being put upon Siena at Ink Block’s amenity spaces, including a fully equipped fitness center and an indoor-outdoor rooftop sky lounge with sweeping views. Siena at Ink Block is located in the burgeoning Upper South End, steps from conveniences including a Whole Foods Market and multiple retail options, restaurants and bars. The following is a photograph of Siena at Ink Block:


Siena at Ink Block


Portside at East Pier Phase Two
- Feb 04, 2018

Phase Two of East Boston’s waterfront Portside at East Pier luxury apartments opening this March


The Beacon Collection, Phase Two of the Portside at East Pier luxury apartments on the East Boston waterfront overlooking the Boston skyline, is expected to open this March. The 296-unit new-construction community will be spread across two buildings, and will feature amenities including an indoor pool with an outdoor sundeck, a fitness center with a spin room and yoga room, a rooftop deck overlooking Boston Harbor and a golf simulator. The Beacon Collection will join Portside at East Pier’s Meridian Collection, Phase One of the development which opened in 2014, and will include an extension of the public waterfront Harborwalk. The latest renderings of the Beacon Collection are posted above. The following are photographs of Portside at East Pier:


Portside at East Pier Photos


Emery Flats
- Jan 11, 2018

200 new apartments break ground in Woburn


National Development has broken ground on Emery Flats, a residential community featuring 200 apartments located just off of Interstate 93 in Woburn, minutes from Downtown Boston. The two-building community will contain a mix of studio, one-bedroom, two-bedroom and three-bedroom apartments, with each unit including washer/dryer units and individual heating/cooling controls. Communal amenities will include a fitness center, a rooftop lounge, lounge and work spaces and an outdoor swimming pool. Emery Flats is scheduled to open in February 2019.


Treadmark
- Dec 20, 2017

Rebuilding of Dorchester's fire-ravaged Treadmark mixed-use development begins


Trinity Financial has commenced rebuilding its' Treadmark mixed-use development across from Ashmont Station in Dorchester, after a fire destroyed the nearly-completed building last summer. Following the demolition of prior wood framing atop the building's base podium, new wood framing materials have been delivered onto the site to re-frame Treadmark's five upper floors. Upon completion, Treadmark will feature 83 residential units, including 51 affordable rental units and 32 ownership condominiums, as well as approximately 5,000 square feet of ground-floor retail space anchored by South Boston-based specialty food retailer American Provisions. The following is a photograph of Treadmark:



The District Burlington
- Dec 04, 2017

Hotel opens at The District Burlington, new mixed-use neighborhood north of Boston


A 170-room Marriott Residence Inn hotel has opened at The District Burlington, a new mixed-use neighborhood located in Burlington, MA created from a 1970s office park. Suites at the hotel include one- and two-bedrooms and feature free Wi-Fi and flat-screens, kitchens and living areas. On-site amenities include parking, an indoor pool, a hot tub and a gym. A casual steakhouse will open at the hotel in 2018, complementing The District's culinary options which include Island Creek Oyster Bar, Pressed Cafe, Tavern in the Square and Tuscan Kitchen.


The District Burlington's office component is over 85% leased by over 40 tenants, including BAE Systems, Black Duck Software, Charles River Development and Decision Resources. A total of 30,000 square feet of retail are now located at the development, and The District Burlington's streetscape has been enhanced with new sidewalks and bicycle sharing in order to improve walkability and connectivity. The development is located just 15 miles from Boston, minutes from Interstate 95/128.


Constitution Wharf
- Nov 07, 2017

Common area renovations underway at Constitution Wharf, creative waterfront office space overlooking Boston skyline now leasing


Large common area sections of Constitution Wharf, a creative office building overlooking the Downtown Boston skyline undergoing a full repositioning, have been demolished, with framing and fit out of exclusive, innovative new amenity spaces well underway. Metal framing sections have been erected within Constitution Wharf’s lobby area to build the building’s future lounge, cafe and fitness areas, and the building’s high-ceilinged, natural light-filled entryway has been prepared for installation of modern new finishes. Outside Constitution Wharf and along the Harborwalk, landscaping has been cleared to make way for construction of a revolutionary outdoor work & social room featuring an oversized media screen, creative seating, interactive event space, a fireplace, public art and sweeping Boston Harbor views.


Tenants at the newly repositioned, 180,000-square-foot Constitution Wharf include online shoe shopping destination Shoes.com, who has opened a new 31,300-square-foot headquarters at the building featuring oversized windows and a dedicated rooftop patio featuring sweeping views of the Boston harbor. Completion of renovations to Constitution Wharf’s common areas is expected by the end of 2017. The following are photographs of Constitution Wharf:


Constitution Wharf Photos


The following are photographs of Shoes.com’s new headquarters, courtesy Newmark Knight Frank:


Shoes.com Photos


The District Burlington
- Oct 11, 2017

$205 million financing obtained for The District Burlington


The District Burlington, a former suburban office park recently transformed by National Development, Charles River Realty Investors and AEW Capital Management into a walkable mixed-use neighborhood, has received $205 million in financing secured by HFF. The seven-year fixed-rate permanent loan was obtained though a major life insurance company. “The borrower did a fantastic job repositioning the asset to become a best-in-class mixed-use park with the best amenity package available in the market,” said HFF Managing Director Greg LaBine in a prepared statement. “That led to increased tenant demand and higher rents, which when coupled with top institutional sponsorship within the borrower group, made this a compelling opportunity for the lender.”


The District Burlington is over 85% leased by a very diverse set of over 40 tenants, including BAE Systems, Black Duck Software, Charles River Development and Decision Resources. With amenities such as a new Marriott Residence Inn hotel, an 8,000-square-foot fitness center, an OMMMSpace housing yoga and meditation classes, private shuttle service to the Alewife MBTA Red Line station and a 30,000-square-foot retail cluster featuring Island Creek Oyster Bar, Pressed Cafe, Tavern in the Square, Tuscan Kitchen and Market and TD Bank, The District Burlington provides an ideal blend of a relaxing suburban setting and urban convenience. The development is located just 15 miles from Boston, minutes from Interstate 95/128.


Boston East
- Sep 28, 2017

Pre-leasing underway at Boston East apartments on East Boston Waterfront, opening this Fall


Pre-leasing has begun at the 200-unit Boston East new-construction apartment development opening this Fall on the East Boston Waterfront, which will feature studio, 1- and 2-bedroom apartments with rents starting at $1,950/month. Studios at Boston East range from $1,950 to $2,250 per month, 1-bedrooms begin at around $2,200 and cap out at about $2,800 per month, 2-bedrooms range from just under $3,100 to about $3,700 per month and 3-bedrooms can be rented starting at $4,800 per month. 1-, 2-, and 3-bedroom loft-style apartments range from about $2,400 to just over $5,000 per month. Boston East apartments feature luxurious amenities including patios and balconies in select apartments, quartz countertops, hardwood flooring and oversized windows, with sweeping views of Boston Harbor throughout. Communal amenities include a top floor lounge and terrace, a courtyard with a fire pit and lounge areas, a state-of-the-art fitness center and on-site parking. The latest renderings of Boston East are posted above.


960 Massachusetts Avenue & 100 Newmarket Street
- Sep 27, 2017

National Development and Charles River Realty Investors acquire developable Newmarket industrial property for $11.7 million


National Development and Charles River Realty Investors have acquired a 2.77-acre industrial property in Roxbury's Newmarket Square for $11.7 million. Two buildings stand on the property, bounded by Massachusetts Avenue, Theodore Glynn Way and Newmarket Street. 960 Massachusetts Avenue, a three-story, 75,424-square-foot building, is 84%-leased to seven tenants. 100 Newmarket Street, a single-story, 6,000-square-foot building, is fully leased. The property is zoned for a variety of uses, including warehouse/distribution, manufacturing, research and development, retail, creative office and laboratory, presenting potential for a development project of approximately 240,000 square feet.


Commercial broker Transwestern Consulting Group represented seller 960 Massachusetts Avenue Limited Partnership and sourced the buyer. National Development and Charles River Realty Investors have retained Transwestern to provide leasing services for the property. The property is located minutes to Downtown Boston, within close proximity to the Newmarket MBTA Commuter Rail Station, the Massachusetts Turnpike and Interstate 93.


AC Hotel Boston Cleveland Circle
- Sep 14, 2017

Historic Circle Cinema sign re-installed atop Cleveland Circle mixed-use development


National Development has re-installed the historic Circle Cinema sign, a longtime landmark of Cleveland Circle, atop the new six-story, 92-unit Waterstone luxury adult apartment community at the $85 million, 218,520-square-foot Circle mixed-use development. The sign was unveiled in a special ceremony Wedensday evening attended by Boston Mayor Marty Walsh, Boston City Councillor Mark Ciommo and National Development Managing Partner Ted Tye. The Circle is expected to open in early 2018, and will also feature a 162-room AC Hotel and approximately 14,000 square feet of retail space across the ground floors of both new buildings. The following are photographs from the Circle sign installation ceremony:


The Circle Photos


Portside at East Pier Phase Two
- Sep 06, 2017

Facade nearing completion at Portside at East Pier Phase Two apartments, opening next Fall on East Boston Waterfront


The five-story facade of the upcoming Portside at East Pier Phase Two apartments on the East Boston Waterfront is nearing completion, with red and tan bricks and silver and white metal panels installed along large facade sections. Windows are fully installed throughout both buildings, and interior finishing of apartments and common spaces has begun. Opening in Fall 2018, Portside at East Pier Phase Two will feature 296 waterfront apartment residences overlooking Boston Harbor and Boston skyline. The following are photographs of Portside of East Pier Phase Two:


Portside at East Pier Phase Two Photos


Constitution Wharf
- Aug 29, 2017

Shoes.com opens new waterfront headquarters at Constitution Wharf, newly renovated creative Boston office building now leasing


Online shoe shopping destination Shoes.com has opened its’ new 31,300-square-foot headquarters at Constitution Wharf, a newly renovated creative Boston waterfront office building. Shoes.com has doubled its’ local employment base with its’ move to Constitution Wharf from its’ longtime Downtown Crossing headquarters, following Wal-Mart subsidiary Jet.com’s acquisition of Shoes.com in January 2017.


Shoes.com’s new headquarters takes full advantage of Constitution Wharf’s unparalleled waterfront location, with oversized windows overlooking Boston Harbor and a dedicated rooftop patio featuring sweeping views of the Boston skyline. Employees also have access to Constitution Wharf’s common spaces, including a lounge, a cafe, a fitness area and a revolutionary outdoor work & social room featuring an oversized media screen, creative seating, interactive event space, a fire pit and sweeping Boston Harbor views. Office space at the 180,000-square-foot Constitution Wharf is now available for lease. The following are photographs of Shoes.com’s new headquarters at Constitution Wharf, courtesy National Development.


Shoes.com Office at Constitution Wharf


Boston East
- Aug 24, 2017

Boston East apartments facade nears completion, interior finishing underway


Nearly all brick and metal panel exterior finishes have been installed along the six-story facade of Boston East, an upcoming 200-unit luxury apartment building situated on the East Boston Waterfront. Boston East's exterior has been fully fireproofed, and all windows are in place. Inside the building, installation of luxurious reisdence and common space finishes is well underway. Boston East is expected to open this Fall. As part of the project, a new Harborwalk extension and public open space will be constructed along the waterfront. The following are photographs of Boston East:



Siena at Ink Block
- Aug 08, 2017

Siena at Ink Block luxury condos in South End reach 60% pre-sold benchmark


The upcoming Siena at Ink Block luxury condominiums in the South End, which recently topped off, are already 60% pre-sold. This strong early demand represents the upper South End's recent renaissance, with transformative new developments such as Ink Block bringing new residents and retail options to the area. Siena residents will be located steps from the Whole Foods Market at Ink Block, in addition to multiple desirable restaurants and shops, and a short walk to Downtown Boston, South Boston and the Seaport District. Siena will feature 76 residences, with amenities including a rooftop Sky Lounge and roof deck with sweeping Boston skyline views. Siena is expected to open in early 2018.


Constitution Wharf
- Aug 03, 2017

BLDUP’s Building of the Week: Constitution Wharf, creative Boston waterfront office space


Situated on eight waterfront acres overlooking the Boston skyline, Constitution Wharf is undergoing a full repositioning which will create 180,000 square feet of creative office space now available for lease. Constitution Wharf will feature revolutionary common spaces, including an outdoor work & social room overlooking Boston Harbor with an oversized media screen, creative seating, interactive event space and a fire pit. The following is a video exhibiting Constitution Wharf and its’ multiple desirable amenities:



Siena at Ink Block
- Jul 28, 2017

Facade weatherproofing and interior framing underway at Siena at Ink Block luxury condos in South End


Large weatherproofing sections have been installed along the facade of Siena at Ink Block, a new luxury condominium building opening next year at Ink Block in the South End. Window and facade finish installation at Siena will begin in the coming weeks. Inside the building, metal stud framing is being installed to partition individual condominiums. Siena will feature 76 new luxury condominiums, which are now on sale, with resident amenities including an indoor-outdoor rooftop sky lounge with sweeping views, a fully equipped fitness center, 24/7 concierge service and on-site parking. The following are photographs of Siena At Ink Block:


Siena at Ink Block Photos


AC Hotel Boston Downtown
- Jul 28, 2017

Facade installation complete at AC Hotel South End, opening this Fall at Ink Block


Windows and finishes have been fully installed along the facade of AC Hotel South End, a contemporary hotel opening later this year at Ink Block in the South End. Finishing of the building’s 200 guest rooms is now underway; plastering of rooms is nearing completion, and luxurious finishes are being installed throughout. Amenities at AC Hotel South End will include a bar, a lounge area, a fitness center and an indoor pool. The following are photographs of AC Hotel South End:


AC Hotel South End Photos


AC Hotel Boston Cleveland Circle
- Jun 29, 2017

Weatherproofing underway at The Circle, luxurious new hotel and adult housing opening Early 2018 in Brighton


Both buildings at the 218,520-square-foot Circle mixed-use development in Brighton's Cleveland Circle have topped off, and weatherproofing of the structures is now underway. Windows have been fully installed at the future 92-unit Waterstone luxury adult apartment building, and the building's exterior is just about fully fireproofed. Exterior facade finish installation will begin at Waterstone in the coming weeks. Window installation is well underway at the 162-room AC Hotel, and moisture-resistant cladding installation has begun at the building's base. A total of approximately 14,000 square feet of retail space will be located along The Circle's ground floor; The Circle is jointly developed by National Development and Boston Development Group and is located steps from the MBTA Green Line. Completion of The Circle is anticipated in Early 2018. The following are photographs of The Circle:


The Circle Photos


Portside at East Pier Phase Two
- Jun 09, 2017

Facade finish installation underway at Portside at East Pier Phase Two apartments on East Boston Waterfront


Facade work is rapidly progressing at Portside at East Pier Phase Two, with windows and exterior finishes both installed along large portions of the development’s west building. Portside at East Pier Phase Two has topped off fully at five stories tall; installation of windows and exterior weatherproofing have both begun on the development's east building. Scheduled for full completion in Fall 2018, Portside at East Pier Phase Two will feature 296 waterfront apartment residences. The following are photographs of Portside of East Pier Phase Two:


Portside at East Pier Phase Two Photos


Boston East
- Jun 08, 2017

Brick finish installation underway at Boston East waterfront apartments in East Boston, artist residence applications begin


Brickwork has been installed along a large section of Boston East’s six-story facade facing Border Street. The building is fully framed, and fireproofing, weatherproofing and windows have all been installed along Boston East’s facade. Inside the building, fit-out of residences and common spaces has begun.


Developer Trinity Financial has begun accepting applications for Boston East’s six artist live-work residences, which will be rented to households earning no more than 70% of Area Media Income (AMI); Boston East will include a ground-floor local artwork gallery. Artist residences will be available for $1,450 per month; rents for market-rate residences at Boston East will range from $2,000 to $4,700 per month, averaging $2,900 per month. Opening in September, Boston East will feature 200 apartment residences along with a new Harborwalk extension and public waterfront space. The following are photographs of Boston East:


Boston East Photos


Siena at Ink Block
- Jun 06, 2017

Facade installation preparations underway at Siena at Ink Block luxury condos in South End


The eight-story facade of the recently-topped-off Siena at Ink Block luxury condominium residences in the South End is being prepared for installation of exterior finishes. Steel infill walls have been installed along Siena's perimeter up to the building's fourth floor; these walls will support and reinforce Siena's facade, which will consist of distinctive brickwork and metal panels. Within the building, concrete has been poured at the bases of nearly all floors, allowing for framing of individual residences to begin. Opening in early 2018, Siena will feature 76 new luxury condominium residences now on sale with state-of-the-art amenities including a rooftop Sky Lounge and a fully-equipped fitness center. The following are photographs of Siena at Ink Block:


Siena at Ink Block Photos


AC Hotel Boston Downtown
- Jun 06, 2017

Facade nearing completion, interior finishing underway at AC Hotel South End


Black and grey exterior finish panels have been installed along large sections of AC Hotel South End's facade, and are just about fully installed along Albany Street. Windows have been fitted along all sides of the building, and weatherproofing is fully in place. Inside AC Hotel South End, individual hotel rooms have been framed, and state-of-the-art modern finishes are being installed. Opening this Fall, AC Hotel South End will feature 200 guest rooms with high-class contemporary amenities including a bar, a lounge area, a fitness center and an indoor pool. The following are photographs of AC Hotel South End:


AC Hotel South End Photos


Melnea Hotel and Residences
- May 11, 2017

Foundation construction underway at Dudley Square’s Melnea Hotel and Residences


Excavation and concrete pouring are underway at the 1.3-acre Melnea Hotel and Residences site in Roxbury’s Dudley Square in order to construct the foundations of two new buildings. The Melnea Hotel and Residences project will construct a six-story, 108-room Marriott Residence Inn hotel and a six-story, 50-unit apartment building on a long-vacant parcel at the corner of Melnea Cass Boulevard and Washington Street. The following are photographs of Melnea Hotel and Residences:


Melnea Hotel and Residences Photos


AC Hotel Boston Downtown
- May 10, 2017

Facade finishing underway at AC Hotel South End, opening this Fall at Ink Block


The first exterior finishes have been installed at AC Hotel South End, a trendy boutique hotel that will open this Fall at Ink Block in the South End. Windows and fireproofing have been installed along nearly the entire building, and individual hotel rooms have been framed inside. In the coming months, the facade will be completed, and the hotel’s interior will be appointed with modern, luxurious finishes. AC Hotel South End will feature 200 guest rooms with desirable amenities including a bar and lounge area, a fitness center and an indoor pool. The following are photographs of AC Hotel South End:


AC Hotel South End Photos


Siena at Ink Block
- May 07, 2017

Siena at Ink Block luxury condos in South End top off


A topping-off ceremony was recently held for Siena at Ink Block, the South End’s latest luxury condominium building. Hundreds of construction workers and the Siena project team gathered last Friday (April 28th, 2017) to formally hoist the final steel beam of Siena’s 8-story frame into the sky and install the beam at the frame’s summit.


National Development Managing Partner Ted Tye spoke briefly prior to the beam’s installation, thanking the construction and project teams for their hard work. Siena will be located in National Development’s vibrant Ink Block development, which upon Siena’s completion will be home to nearly 500 housing units, the acclaimed Bar Mezzana, Fuji at Ink Block and Lion’s Tail restaurants and top-quality retail including a Whole Foods grocery store.


Completion of Siena is expected in early 2018; with steel frame construction complete, the construction team will commence facade construction and interior finishing. Concrete slabs have been poured at the bases of nearly half of Siena’s floors, allowing for partitioning of individual residences to begin. Siena’s 76 luxury condominium residences, which will feature sweeping skyline views and desirable amenities including a private rooftop bar and lounge, are currently on sale in studio, 1, 2 and 3-bedroom configurations. The following are photographs from the Siena at Ink Block topping-off ceremony:


Siena at Ink Block Topping Off


Gateway Boston
- May 02, 2017

Landwer Cafe, prominent Mediterranean cafe chain, opening this Fall at Gateway Boston in Fenway


Landwer Cafe, a prominent Mediterranean cafe chain with 65 locations in Israel, will open its’ first United States location this Fall at the new Gateway Boston building in the Fenway. Serving breakfast, lunch and dinner, Landwer will feature traditional Mediterranean cuisine including muesli, salads, sandwiches and shakshuka. Both beer and wine will be served. The Fenway cafe will be open from 7 AM to 11 PM daily, with outdoor seating from April to October. 80 seats will be located inside the 3,200 square foot space, with 40 seats on an outdoor patio. Landwer recently opened a new cafe in Toronto, its’ first Canadian location.


Assembly Row Block 8
- Apr 30, 2017

500 new residences proposed at Assembly Row


Federal Realty proposes to construct a new 525,300 square foot building at Assembly Row featuring 500 residences and approximately 26,500 square feet of restaurant and retail space. The building would be located on Assembly Row’s Block 8, next to the Assembly Square MBTA Orange Line station. Federal will open Montaje, another luxury residential and retail tower at Assembly Row located next to the proposed building, this Spring. The proposed building would be located between Montaje and a recently completed 825,000 square foot office and retail development home to the headquarters of Partners Healthcare. Plans for the proposed building have been filed with the City of Somerville, who is now reviewing the project.


455 Grand Union Blvd​
- Apr 30, 2017

267,387 square feet of new commercial space proposed at Assembly Row


Federal Realty proposes to construct a new 267,387 square foot commercial building at Assembly Row featuring office and retail space. The building would be located on Assembly Row’s Block 5B, next to the Alloy mixed-use development steps to the MBTA Orange Line. Federal completed a 13-story, 825,000 square foot commercial building at 399 Revolution Drive, home to the headquarters of Partners Healthcare, at Assembly Row last June. Plans for the proposed building have been filed with the City of Somerville, who is now reviewing the project.


AC Hotel Boston Downtown
- Apr 13, 2017

Window installation underway at AC Hotel South End


Window installation is well underway at the new AC Hotel South End, and fireproofing is being installed along the building’s façade. Inside AC Hotel South End, metal framing is being installed to partition individual hotel rooms. Opening later this year, AC Hotel South End will feature 200 guest rooms located adjacent to the Ink Block development. The following are photographs of AC Hotel South End:


AC Hotel South End Photos


Siena at Ink Block
- Apr 13, 2017

Siena at Ink Block condominiums in South End near topping off


Siena at Ink Block’s eight-story frame has reached the building’s seventh floor and will soon top off. On completed floors, metal floor decks have been installed to support Siena at Ink Block’s future concrete floor slabs, and perimeter relieving angles have been installed to support the building’s future exterior brick façade. Opening in 2018, Siena at Ink Block will feature 76 luxury residences now on sale. The following are photographs of Siena at Ink Block:


Siena at Ink Block Photos


AC Hotel Boston Cleveland Circle
- Apr 09, 2017

Window installation underway at The Circle in Brighton, new renderings revealed


The Waterstone luxury adult apartment building at The Circle, a two-building mixed-use development in Brighton’s Cleveland Circle, has topped off at six stories high. Windows have been installed along a large section of Waterstone’s facade, and weatherproofing and fireproofing of Waterstone are also underway. Next to Waterstone, the future five-story AC Hotel has reached four stories high and will soon top off. Both buildings at The Circle are expected to open in Early 2018. New renderings of The Circle, including renderings of Waterstone luxury residences, have been revealed and are posted above. The following are photographs of The Circle:


The Circle Photos


Boston East
- Apr 09, 2017

Fireproofing underway at Boston East, framing just about complete


Fireproofing and windows have been installed along a large section of Boston East’s topped-off north wing, and moisture-resistant cladding is in place along large sections of both the north and south wings. Wood framing of the south wing is just about topped off. Interior metal framing of individual apartment residences is underway across Boston East. Opening this Fall, the mixed-use development will feature 200 apartment residences with a Harborwalk extension and public waterfront amenities including art galleries, historic exhibits and a boat launch. The following are photographs of Boston East:


Boston East Photos


Ink Block Phase One
- Apr 06, 2017

Ink Underground, eight-acre cultural playground, opening at Ink Block in South End this June


National Development, developer of Ink Block in the South End, will open Ink Underground, an 8-acre urban park and cultural playground, in a currently underutilized space underneath the Southeast Expressway (I-93) adjacent to Ink Block. Ink Underground will extend east from Albany Street to Fort Point Channel under I-93 and will also feature pedestrian boardwalks and bicycle paths along Fort Point Channel, creating a new, active connection between the rapidly-developing South End and South Boston neighborhoods.


Amenities at Ink Underground will include 24-hour security, a dog park, a curated series of pop-up food and beverage experiences, public art walls, sculpture exhibitions and a diverse program of special events including a graffiti art festival, an artisan night market and fitness classes. Additionally, a bike storage facility and 175 parking spaces will be located at Ink Underground. National Development has entered into a long-term lease as Ink Underground's operator in a public-private partnership with the Massachusetts Department of Transportation (MassDOT). The following is a rendering of Ink Underground:


Ink Underground Dog Park


AC Hotel Boston Downtown
- Feb 16, 2017

AC Hotel South End tops off, weatherproofing underway


AC Hotel South End’s 6-story frame has topped off, and weatherproofing is underway along the facade. The building's first windows have been installed along Albany Street. Opening later this year at the Ink Block, AC Hotel South End will feature 200 hotel rooms, a bar and lounge area, a fitness center, an indoor pool and conference rooms. The following are photographs of AC Hotel South End:


AC Hotel South End Photos


Treadmark
- Feb 16, 2017

Facade finish installation underway at Treadmark in Dorchester


The first exterior facade finishes are being installed at Treadmark, a $45 million mixed-use development located across from Ashmont Station in Dorchester. Treadmark's 6-story frame has been nearly fully weatherproofed, with window and fireproofing installation just about complete. Treadmark is slated to open this summer; luxury residences are now on sale, and apartment leasing will commence in the coming months. The following is an aerial photograph of Treadmark:



Siena at Ink Block
- Feb 09, 2017

Vertical steel construction starts at Siena at Ink Block condominiums


The first vertical steel columns have been erected to construct Siena at Ink Block's structural frame, bringing the future 8-story South End luxury condominium building above ground level. Frame construction is now underway in earnest. Siena is scheduled to open in 2018 and will feature 76 luxury condominium residences now on sale. The following is a photograph of frame construction underway at Siena:



Boston East
- Feb 05, 2017

Weatherproofing underway at East Boston's Boston East development


The 6-story Boston East superstructure on the East Boston Waterfront is being weatherproofed and prepared for installation of windows. Boston East’s north wing has topped off, and wood framing of the south wing has reached the third floor. Hardscaping has been installed at Boston East’s ground level for the public pedestrian atrium that will connect Border Street to the East Boston Waterfront. Opening this fall, Boston East will feature 200 apartment residences, a Harborwalk extension and public waterfront amenities including art galleries, historic exhibits and a boat launch. The following are photographs of Boston East:


Boston East Photos


Portside at East Pier Phase Two
- Feb 05, 2017

First windows installed at East Boston's Portside at East Pier Phase Two


The first windows have been installed at the 296-unit Portside at East Pier Phase Two residential apartment development on the East Boston Waterfront. Steel framing has also been installed to construct balconies around select units. Wood framing of the development's west wing along South Bremen Street has topped off at 5 stories tall, and the east wing has reached 2 stories tall. Portside at East Pier Phase Two will open in Fall 2018 and will also include a public Harborwalk extension. The following are photographs of Portside at East Pier Phase Two:


Portside at East Pier Phase Two Photos


Treadmark
- Jan 22, 2017

Weatherproofing underway at Dorchester’s Treadmark


Weatherproofing has begun at the $45 million Treadmark mixed-use development, opening Summer 2017 in Dorchester across from Ashmont Station. Windows and fireproofing have been installed along a large section of the building’s facade. Framing of interior spaces is also underway. Treadmark has reached its’ final height of six stories. Luxury residences at Treadmark are now on sale. The following is a photograph of Treadmark:



Treadmark
- Jan 05, 2017

American Provisions opening market at Dorchester’s Treadmark in Summer 2017


South Boston specialty food retailer American Provisions has received official approval to construct a new retail location at Dorchester’s new Treadmark mixed-use development across from Ashmont Station. The new 2,500 square foot American Provisions store will open in Summer 2017 and will feature 1,500 retail square feet with a 1,000 square foot kitchen. American Provisions is now seeking a license to sell beer and wine at the new store.


Boston East
- Jan 03, 2017

Boston East superstructure nears topping off


Wood framing of Boston East’s six-story superstructure is well underway and has reached as high as the fifth story at the north wing of the East Boston Waterfront development and the second story at the south. Steel erection of Boston East’s ground-floor podium and center pedestrian atrium is complete. Masonry elevator cores have topped off for both building wings. Opening in Fall 2017, Boston East will feature 200 residential apartments and will activate the East Boston Waterfront with a Harborwalk extension, a boat launch and exhibition space. The following are photographs of Boston East:


Boston East Photos


Portside at East Pier Phase Two
- Jan 03, 2017

Portside at East Pier Phase Two nears topping off


Superstructure work on Phase Two of East Boston’s Portside at East Pier is well underway, as framing has reached the fourth of five floors at large sections of the development. Dozens of prefabricated wood panels have been delivered to the construction site, which will allow framing to continue at breakneck pace. Masonry elevator cores have topped off across the development site, and steel erection is complete at the development’s ground floor podium. Opening in Fall 2018, Phase Two of Portside at East Pier will feature 296 rental apartments with an indoor pool for residents and a public Harborwalk extension. The following are photographs of Portside at East Pier Phase Two:


Portside at East Pier Phase Two Photos


Melnea Hotel and Residences
- Dec 29, 2016

Melnea Hotel and Residences developer obtains Roxbury hotel development site and financing


The Melnea Hotel and Residences development team has closed on the long-term lease of the city-owned Roxbury site on which the $38 million mixed-use project will be built. The team also closed on nearly $30 million of financing, allowing construction of the project to proceed in earnest. Initial site work is now underway at the 1.3-acre Melnea Hotel and Residences site on Melnea Cass Boulevard in Roxbury’s Dudley Square neighborhood. Urbanica will develop the property, and Colwen Management will manage the hotel.


AC Hotel Boston Downtown
- Dec 14, 2016

AC Hotel South End nears topping off


The six-story, 200-room AC Hotel South End’s superstructure has reached five stories high and will soon top off. Four stories of wood framing have been constructed above the building’s steel-framed podium. Carpenters are hard at work finishing installation of the wood framing’s prefabricated stud walls and flooring. A brick finish section has been installed at AC Hotel South End’s base. AC Hotel South End is scheduled for a late 2017 opening. The following are photographs of AC Hotel South End:


AC Hotel South End Photos


The District Burlington
- Nov 23, 2016

Two premium dining establishments open at The District Burlington


Premium dining establishments Pressed Cafe and Island Creek Oyster Bar are now open at The District Burlington, a 1.3 million square foot office and retail development that is redefining the suburban mixed-use experience. The District Burlington is oriented around a walkable streetscape with outdoor seating and other amenities. The surrounding relaxing suburban environment and exciting dining options make The District Burlington a great place to work and spend a night out. With the addition of Pressed Cafe and Island Creek Oyster Bar, there are now a total of 2,000 restaurant seats at The District Burlington, or two seats for every three District Burlington office workers! Additional dining destinations, as well as a 170-room Marriott Residence Inn hotel, are planned for The District Burlington in 2017.


The Pressed Cafe and Island Creek Oyster Bar teams are excited to become a part of The District Burlington. “We’re delighted to open our second location at The District Burlington, where we’re joining a thriving restaurant community,” says Shore Gregory of Island Creek Oyster Bar. “Chef Jeremy Sewall’s lunch and dinner menu will highlight the incredible farmers and fisherman that we work with, while Jackson Cannon’s beverage program will be a draw for the after-work crowd.” Island Creek Oyster Bar at The District Burlington includes bar and table seating as well as private dining options. “At The District Burlington we have the opportunity to expand our reach within a new, food-oriented community,” says Roi Shpindler, owner of Pressed Café. “Our second location will foster connection and collaboration over fresh, clean food and local, micro-roasted coffee.” Pressed Cafe at The District Burlington features 150 flexible seats designed for gathering, working and playing.


The following are photographs of Island Creek Oyster Bar:


Island Creek Oyster Bar


The following are photographs of Pressed Cafe:


Pressed Cafe


The following are streetscape photographs of The District Burlington:


Streetscape


AC Hotel Boston Cleveland Circle
- Nov 20, 2016

The Circle residential podium erected, hotel foundation construction underway


The first-story podium of the six-story Waterstone adult residential building at The Circle, a 213,000 square foot mixed-use development in Cleveland Circle, has been erected. Wood framing of five floors above the podium's concrete base will now commence. Both elevator cores of Waterstone at The Circle have topped off at six stories tall.


Construction of the AC Hotel at The Circle's foundation is underway. J. Derenzo Companies is at work excavating the foundation, and large sections of concrete have been poured. Steel erection to construct AC Hotel's five-story structural frame is anticipated in early December. Completion of underground utility construction at The Circle is also anticipated in early December. Completion of both buildings at The Circle is anticipated in Fall 2017. The following are photographs of The Circle:


The Circle Photos


Sepia at Ink Block
- Nov 16, 2016

Sepia at Ink Block attains LEED Gold sustainability certification


National Development's Sepia at Ink Block luxury condominium building, which opened in Fall 2015, has attained a prestigious LEED Gold sustainability certification. Sepia achieved LEED Gold based on the building's innovative energy-efficient and environmentally-friendly design. Sepia's efficient use of environmental resources will improve the surrounding environment and result in lower utility bills for residents:



Gateway Boston
- Nov 11, 2016

Gateway Boston, 32 new Fenway luxury apartments, now leasing


Gateway Boston, a new 32-unit luxury apartment building in the Fenway, is now leasing. The building features one and one plus-bedroom units ranging from approximately $2,900 to $3,200 per month. On-site garage parking is offered for an additional $200 per month. Visit GatewayBoston.com for more information.


Siena at Ink Block
- Nov 03, 2016

Siena at Ink Block frame construction scheduled for January 2017, building opening 2018


Structural steel erection to construct Siena at Ink Block's frame is scheduled for January 2017 per an Instagram update by the development team. Foundation installation is underway; excavation of Siena's underground parking garage is complete, and all piles have been driven. Siena is scheduled for a 2018 opening, and the building's 76 new luxury residential condominiums are now for sale. Condominiums listings at Siena at Ink Block include a studio for $688,600, a one-bedroom for $957,000 and three two-bedrooms ranging from $1.19 to $1.428 million. The following is the Instagram update:



The District Burlington
- Nov 03, 2016

Island Creek Oyster Bar now open at The District Burlington


Island Creek Oyster Bar opens today (Thursday, November 3rd) evening at 5 PM at The District Burlington, a creative mixed-use development that embodies the future of suburban workspace. Island Creek Oyster Bar is the latest addition to The District Burlington’s growing retail offering. A number of exciting shops and restaurants are already open, and Pressed Cafe will open around November 15th. Visitors to The District Burlington are treated to a relaxing suburban environment with urban amenities and conveniences centered about a walkable street grid and natural beauty, making The District Burlington a unique, inspiring place to work or spend a night out. Learn more about The District Burlington’s exciting offerings above. The following are photographs of the new Island Creek Oyster Bar at The District Burlington, courtesy Michael Harlan Turkell:


ICOB at The District Burlington


The District Burlington
- Oct 26, 2016

National Development cuts ribbon on new office space at The District Burlington


National Development held a ribbon cutting ceremony last Wednesday (October 19th, 2016) for Building 700, a newly expanded and improved office building at The District Burlington. The ribbon cutting coincided with Octoberfest, an annual after-work outdoor party for District Burlington tenants held on the Building 800 lawn with food, craft beer and a corn hole competition. Octoberfest attendees were delighted to visit Building 700’s newly opened roof deck, sit back in a comfortable chair and take in sweeping sunset views across the idyllic surrounding countryside. New improvements to Building 700 include a new lobby and a four-story, 80,000 square foot glass-curtained addition with floor-to-ceiling windows, an open floor plan and the aforementioned 4,000 square foot roof deck. The roof deck features outdoor seating, television screens, a fireplace, grilling stations and a bar.


The District Burlington’s exciting retail offerings will soon be joined by Island Creek Oyster Bar, opening around November 1st, and Pressed Cafe, opening around November 15th. Both retailers will offer outdoor seating, providing desirable urban conveniences in a peaceful suburban setting located a short drive from Downtown Boston. A Marriott Residence Inn hotel, which is about to top off at six stories tall, will further activate The District Burlington; the hotel is expected to open in 2017.


The District Burlington is a great place to work with refreshing surroundings and a plethora of engaging retail options. Office and retail spaces are currently available at The District Burlington ranging from 1,000 to 200,000 square feet, including at the new Building 700 addition. There is also opportunity to construct an approximately 180,000 square foot build-to-suit office building at The District Burlington. Visit DistrictBurlington.com for more information. The following are photographs of Building 700's facade:


Building 700 Facade


The following are photographs of Building 700's interior:


Building 700 Interior


The following are photographs of the new Building 700 roof deck:


Building 700 Roof Deck


The following are photographs of Building 700's entrance:


Building 700 Entrance


The following is a photograph from the Building 700 ribbon cutting:


Ribbon Cutting


The following are photographs from Octoberfest:


The District Burlington Octoberfest


The following are photographs of The District Burlington's hotel and retail options:


The District Burlington Hotel/Retail


Ink Block Phase One
- Oct 26, 2016

New Ink Block video released


National Development has released a new video presenting the recently opened Ink Block Apartments, now leasing in the South End's New York Streets neighborhood. The video shows the latest perspectives of Ink Block including common spaces, units and the development's signature Skyline Pool.

Condominiums at Siena at Ink Block, a new 76-unit luxury condominium building, are now for sale. The Sweetgreen, Fuji at Ink Block and Bar Mezzana restaurants are now open at Ink Block. Corepower Yoga will open at Ink Block in November, with the Bottled in Bond restaurant soon to follow. The following is the new Ink Block video:




Portside at East Pier Phase Two
- Oct 09, 2016

Wood framing underway at Phase Two of Portside at East Pier


Portside at East Pier Phase Two’s concrete foundation has been poured, and wood framing of the project's first story is well underway. Three elevator cores are topped off, with a fourth nearing completion. Portside at East Pier Phase Two will feature 296 luxurious residential apartments across two new five-story buildings located on the East Boston Waterfront with sweeping views of the Downtown Boston skyline. The following are aerial photographs of Portside at East Pier Phase Two:


Aerial View


View Along South Bremen Street


Boston Skyline View


The District Burlington
- Sep 28, 2016

Experience the future of suburban workspace at The District Burlington


National Development has opened a new Experience Center at The District Burlington, giving potential tenants the opportunity to experience firsthand the property’s innovative workspace design. The Experience Center exhibits the future of suburban workspace. Furnishings are brightly, creatively designed and arranged in an interconnected, open layout that encourages collaboration and teamwork. No two parts of the Experience Center are alike, engaging visitors to delve into the space's diverse offerings. At the Experience Center’s center are a treadmill and core balance stools, encouraging corporate wellness. Sweeping, calming views of the surrounding greenery and nature trails abound.


Visit DistrictBurlington.com to schedule a tour of the Experience Center and for The District Burlington leasing information. Workspaces are currently available at The District Burlington ranging from 1,000 to 200,000 square feet, including the newly constructed 80,000 square foot, four-story glass-curtained Building 700 addition with floor-to-ceiling windows, an open floor plan and a private roof deck. There is also opportunity to construct an approximately 180,000 square foot build-to-suit office building at The District Burlington. The following are photographs of the Experience Center, courtesy National Development:


The District Experience Center


Treadmark
- Sep 25, 2016

Treadmark wood framing rising, concrete base poured


Treadmark's concrete foundation is fully framed, and a large concrete section of the building's ground level has been poured. A PERI Skydeck system is being used to frame the concrete pour and support the poured slabs as concrete hardens.


Wood framing of levels two through six has begun above the concrete base, with a large section of level two fully framed and level three framing rising. Located in Dorchester's Ashmont neighborhood across from the Ashmont MBTA station, Treadmark will span a full block along Dorchester Avenue between Fuller Street and Mercier Avenue.


Opening Summer 2017, Treadmark will feature 83 new residential units, including 51 new affordable rental units and 32 ownership condominiums, as well as approximately 5,000 square feet of ground-floor retail space. Treadmark's anchor retail tenant will be American Provisions, a South Boston-based specialty food retailer. Visit LiveTreadmark.com for condominium sales information. The following are photographs of Treadmark:


Frame

Treadmark Frame


PERI Skydeck

Treadmark PERI Skydeck


Foundation

Treadmark Foundation


AC Hotel Boston Downtown
- Sep 25, 2016

Superstructure rising at AC Hotel South End


AC Hotel South End's six-story structural frame is now rising above the hotel's completed foundation. Steel framing has risen one story above grade and will contain the future hotel's bar and lounge area, fitness center, indoor pool and conference rooms as well as part of the at-grade parking area. Opening late 2017, AC Hotel South End will be a 200-room AC Hotel by Marriott located in the South End adjacent to the Ink Block development. The following are photographs of AC Hotel South End:


AC Hotel South End September 2016


The District Burlington
- Sep 23, 2016

A new suburban experience arises at The District Burlington


National Development has redefined the suburban experience with The District Burlington, a dramatic transformation of a 9-to-5 1970s office park into a dynamic, 24/7 walkable place. Finishing touches are now underway on a four-story, 80,000 square foot glass-curtained addition to the 11-story, 200,000 square foot Building 700, a landmark office tower positioned at the center of The District Burlington and prominently visible from nearby Route 128. Designed to encourage a healthy, collaborative working environment, the Building 700 addition features abundant natural lighting, floor-to-ceiling windows, an open, customizable floor plan and a private roof deck with sweeping views of The District Burlington's peaceful, green setting.


New retail spaces and a 170-room hotel are enlivening former surface parking lots at The District Burlington. Tavern in the Square, TD Bank and Tuscan Kitchen are now open, with Island Creek Oyster Bar and Pressed Cafe soon to follow. The hotel, a Marriott Residence Inn, is expected to open in 2017; wood framing of upper hotel floors is underway. A walkable street grid has been introduced with widened sidewalks, public plazas and a bike share program.


Visit DistrictBurlington.com for more information about office and retail leasing opportunities at The District Burlington. The following are photographs of The District Burlington:


Building 700

Building 700


Hotel

The District Hotel


Retail

The District Retail


Brighton Marine
- Sep 16, 2016

1485 Commonwealth Avenue approved, construction could commence Q2 2017


At last night's board meeting, the Boston Redevelopment Authority (BRA) approved 1485 Commonwealth Avenue for construction. Located on the Brighton Marine Health Center campus in Brighton steps to the MBTA Green Line, 1485 Commonwealth Avenue will feature 102 new residential rental units. 101 units will be located in a new six-story building, and one unit will be located in a restored existing building. All units will be leased with a preference for veterans. Construction of 1485 Commonwealth Avenue is anticipated to commence in the second quarter of 2017. Additional information about 1485 Commonwealth Avenue can be found above.


Siena at Ink Block
- Sep 14, 2016

Siena at Ink Block underground parking excavation underway, condominiums for sale


Siena at Ink Block’s 31-space underground parking garage is just about fully excavated. A retaining wall consisting of H piles and wooden lagging has been installed along the garage’s perimeter to retain the future building’s foundation. A horizontal foundation support system consisting of large-diameter round steel beams has been installed across the garage to further reinforce the foundation. Concrete piles have been driven into the base of the garage to support the future building. Visit the construction site’s camera for real-time imagery of Siena at Ink Block as well as the neighboring AC Hotel South End project.


Siena at Ink Block, the next phase of National Development’s successful Ink Block development located in the South End’s New York Streets neighborhood, will be an eight-story building featuring 76 luxury condominium units. Visit SienaBoston.com for condominium sales information. A number of condominiums will be maisonettes opening directly onto street level, a first for the rapidly-developing neighborhood. Resident amenities will include a rooftop Sky Lounge with both indoor and outdoor spaces featuring sweeping skyline views. Other amenities will include a fitness center, 24/7 concierge service and convenient access to Ink Block’s multiple retail offerings including Whole Foods Market and the recently opened Bar Mezzana, Fuji at Ink Block and Sweetgreen restaurants. The following are photographs of Siena at Ink Block:


Siena at Ink Block


AC Hotel Boston Downtown
- Sep 13, 2016

AC Hotel South End concrete foundation pouring underway


Pile driving is complete at AC Hotel South End, and concrete is being poured to construct AC Hotel South End’s foundation. J. Derenzo Companies is performing foundation excavation. The hotel’s basement level has been built, and concrete foundation walls and footings are being constructed throughout the construction site. AC Hotel South End will be a 200-room AC Hotel by Marriott located in the South End adjacent to the Ink Block development. Guest amenities will include a bar and lounge area, a fitness center, an indoor pool and conference rooms. 63 surface parking spaces will be constructed adjacent to the hotel. The following are photographs of the AC Hotel South End site:


AC Hotel South End


Melnea Hotel and Residences
- Aug 15, 2016

Melnea Hotel and Residences site and utility work expected this fall


Banker & Tradesman reports that site and utility work at the Melnea Hotel and Residences site is expected to commence this fall, enabled by a $1.6 million MassWorks infrastructure grant awarded to the project, according to Urbanica President Kamran Zahedi. Urbanica is reportedly in talks with lenders to secure additional financing for the project and is in ground lease negotiations with the Boston Redevelopment Authority (BRA) for the 1.3-acre Melnea Hotel and Residences site located at the corner of Melnea Cass Boulevard and Washington Street, which is owned by the city and state. A six-story, 108-room Marriott Residence Inn hotel and a six-story, 50-unit residential rental apartment building with a total of 8,000 square feet of retail will be constructed as part of the Melnea Hotel and Residences project. This page will be updated with additional information as it becomes available. The following are renderings of Melena Hotel & Residences:


Overall View Along Melnea
View from Melnea Cass Boulevard with residential building at left and hotel at right


Melnea-Hotel-and-Residences-Marriott-Residence-Inn-Washington-Street-Melnea-Cass-Boulevard-Boston-Roxbury-Urbanica-Development
View of hotel at corner of Melnea Cass Boulevard and Washington Street


AC Hotel Boston Cleveland Circle
- Aug 15, 2016

Waterstone at The Circle foundation nearing completion, pre-leasing begins


Foundation work is nearing completion at Waterstone at The Circle, a 92-unit luxury adult apartment community under construction in Cleveland Circle. Waterstone at The Circle is the first component of The Circle, an approximately 213,000 square foot, $85 million development project partially located in Boston and Brookline. The Circle will entail the construction of the six-story Waterstone at The Circle as well as a five-story, 162-key AC Hotel by Marriott on the site of the former Circle Cinema and Applebee’s Restaurant. Approximately 6,000 square feet of retail fronting Chestnut Hill Avenue will be located across both buildings. A total of 188 parking spaces will be located on site, including 103 underground and 85 at grade. The following are renderings of The Circle:


TheCircle-ChestnutHillAve
View South along Chestnut Hill Avenue


LookingNorthonChestnutHillAve
View North along Chestnut Hill Avenue


PerspectivesCombined_12-15-2014_Page_3
The Circle open space


PerspectivesCombined_12-15-2014_Page_1
View of The Circle from Cassidy Playground


The Circle development team, a joint venture of National Development and Boston Development Group, secured over $80 million of project financing in March 2016 through Santander Bank; the exact financing figure is $80,084,251. Work on the AC Hotel will begin shortly, and completion of both buildings is expected by Fall 2017. Pre-leasing of apartments at Waterstone at The Circle has begun, visit ClevelandCircleDevelopment.com for more information.


J. Derenzo Companies has just about fully excavated the section of The Circle’s single-level, 103-space underground parking garage that will be located underneath Waterstone at The Circle. Part of the garage will also be located underneath the AC Hotel. Concrete has been poured along nearly all vertical sections of the Waterstone at The Circle garage, and the building’s seven-story elevator core has risen to the future ground floor. Pile driving is complete at Waterstone at The Circle, and concrete is being poured atop pile caps to create Waterstone at The Circle’s foundation. Excavation rigs and other construction vehicles and equipment are staged on the future site of the AC Hotel. The following are photographs of the Circle site:


The-Circle-Foundation-1
View East of Waterstone at The Circle foundation


The-Circle-Foundation-2
View West of Waterstone at The Circle foundation


The-Circle-Foundation-3
View West of Waterstone at The Circle foundation


The-Circle-Foundation-4
Concrete pouring underway along East Section of Waterstone at The Circle foundation


The-Circle-Foundation-5
Concrete pouring underway along East Section of Waterstone at The Circle foundation


The-Circle-Pile-Cap-1
Concrete poured on pile cap


The-Circle-Pile-Cap-2
Concrete poured on pile cap


The-Circle-Pile-Top-1
Top of driven pile (orange posts)


The-Circle-Pile-Top-2
Top of driven pile (orange posts)


The-Circle-Elevator-Core
Elevator Core


The-Circle-Derenzo-Rig-1
J. Derenzo Companies excavator


The-Circle-Derenzo-Rig-2
J. Derenzo Companies excavator


The-Circle-AC-Hotel-Staging
AC Hotel site


Treadmark
- Jul 18, 2016

Ashmont’s Treadmark by Trinity Financial officially breaks ground


We had the honor and privilege of attending the official Treadmark groundbreaking ceremony this past Monday, July 11th. We would like to extend huge congratulations and thanks to Trinity Financial on this important milestone. Treadmark will further enliven the Ashmont neighborhood of Dorchester with 83 new residential units, including 51 new affordable rental units and 32 ownership condominiums, as well as approximately 5,000 square feet of ground-floor retail space. Treadmark's anchor retail tenant will be American Provisions, a South Boston-based specialty food retailer.


The following is a link to the official press release announcing Treadmark's groundbreaking. The following are the latest renderings of Treadmark, formerly known as Ashmont Transit-Oriented Development (TOD) 2. Treadmark's architect is The Architectural Team, and the building's interior designer is Taniya Nayak Design. Exterior rendering is by Neoscape.


Treadmark-Ashmont-TOD2-Mixed-Use-Residential-Retail-Transit-Oriented-MBTA-Development-Project-Trinity-Financial-The-Architectural-Team-Rendering
Exterior (Courtesy The Architectural Team/Neoscape)


TreadmarkLobby
Lobby (Courtesy Taniya Nayak Design)


TreadmarkLivingroom2
Living room (Courtesy Taniya Nayak Design)


TreadmarkLivingroom1
Living room (Courtesy Taniya Nayak Design)


TreadmarkBedroom
Bedroom (Courtesy Taniya Nayak Design)


Speakers at the Treadmark groundbreaking ceremony included Trinity Financial Senior Project Manager Mathieu Zahler, Massachusetts Governor Charlie Baker, Boston Mayor Marty Walsh, Massachusetts Senator Linda Dorcera Forry, RBC Capital Markets Managing Director Craig Wagner, Massachusetts Housing Investment Corporation President and CEO Joe Flatley, Boston Private Senior Vice President Peter Hollands and Greater Ashmont Main Street Board President Philippe Saad.


Treadmark-Remarks-Intro
Opening remarks by Trinity Financial Senior Project Manager Mathieu Zahler


Treadmark-Remarks-Mahler

Trinity Financial Senior Project Manager Mathieu Zahler


Treadmark-Remarks-Baker

Massachusetts Governor Charlie Baker

Treadmark-Remarks-Walsh
Boston Mayor Marty Walsh


Treadmark-Remarks-Forry
Massachusetts Senator Linda Dorcera Forry


Treadmark-Remarks-Wagner
RBC Capital Markets Managing Director Craig Wagner


Treadmark-Remarks-Flatley

Massachusetts Housing Investment Corporation President and CEO Joe Flatley


Treadmark-Remarks-Hollands

Boston Private Senior Vice President Peter Hollands


Treadmark-Remarks-Saad

Greater Ashmont Main Street Board President Philippe Saad


Treadmark-Remarks-Setup
Speeches stage


Speeches were followed by a ceremonial groundbreaking on the construction site and a celebratory reception at Tavolo Risorante in Trinity Financial’s neighboring Carruth transit-oriented building.


Treadmark-Shovels-Fly-1
Shovels ready to fly


Treadmark-Shovels-Fly-2
Shovels fly


Treadmark-Shovels-1
Shovels prior to groundbreaking


Treadmark-Shovels-2
Treadmark branding


Treadmark-Shovels-Fly-3
Shovels after groundbreaking


The sales center for Treadmark’s 32 market-rate condominiums is now open in the Carruth building, and condominium pre-sales have begun. Visit LiveTreadmark.com for more information. A model unit has been installed at the sales center. After the ceremonial groundbreaking, Treadmark interior designer Taniya Nayak gave a tour of the model unit and finishes.

Treadmark-Sales-Center-1
Taniya Nayak tours Treadmark model unit


Treadmark-Sales-Center-2
Treadmark model unit


Treadmark-Sales-Center-3
Treadmark model unit


Treadmark-Branding
Treadmark branding


Construction of Treadmark’s foundation is well underway, with concrete poured along a large vertical section fronting Fuller Street. At the Mercier Avenue end, a FlexiROC T40 tophammer drill rig is being used to assist with foundation excavation by breaking rock. A sheet pile wall is built along the building’s entire perimeter, and wooden shoring is installed to reinforce Treadmark’s foundation during construction. Steel and wood forms are being set up along the foundation’s base for concrete pouring.


Treadmark-Site-1
Site view from Fuller Street


Treadmark-Site-2
Completed concrete foundation section


Treadmark-Site-7

Preparing a foundation section for concrete pouring


Treadmark-Site-3
Site view from Fuller Street


Treadmark-Site-5

FlexiROC T40 tophammer drill rig breaking rock


Treadmark-Site-4
Site view from Mercier Avenue


Treadmark-Site-6A
Site view from Mercier Avenue


More information about Treadmark is posted below.


AC Hotel Boston Downtown
- Jun 17, 2016

Pile driving underway at AC Hotel South End


J. Derenzo Companies has completed initial excavation and pre-trenching at AC Hotel South End. Pile driving is now underway; precast concrete piles averaging 100 feet long are being driven into the ground to provide structural support for the future AC Hotel South End building.


Copy of AC-Hotel-SE-5
Pile driving rig

Copy of AC-Hotel-SE-6
Precast concrete piles ready for driving


Copy of AC-Hotel-SE-7
Partially driven piles


Copy of AC-Hotel-SE-8
View of AC Hotel South End site looking towards Troy Boston


Copy of AC-Hotel-SE-9
Pile driving rig (at left) with partially driven piles (at right)


Copy of AC-Hotel-SE-10
Partially driven piles


Copy of AC-Hotel-SE-11
Partially driven piles


Copy of AC-Hotel-SE-12
Tips of shortened piles; piles at AC Hotel South End will average 100 feet long


More information about AC Hotel South End is posted below.



May 8, 2016

J. Derenzo Companies completes demolition, starts excavation at AC Hotel South End


J. Derenzo Companies’ JDC Demolition has fully demolished two former structures at the AC Hotel South End site, and demolition debris has been fully cleared. Work has begun on AC Hotel South End’s foundation; J. Derenzo Companies has started initial excavation and pre-trenching to prepare the site for pile driving.


AC-Hotel-SE-2
View of AC Hotel South End site looking towards Downtown Boston


AC-Hotel-SE-3
View of AC Hotel South End site looking towards Troy Boston


AC-Hotel-SE-4
Backhoe (at left) and excavator (at right) used for initial excavation and pre-trenching


Boston East
- May 24, 2016

Boston East officially breaks ground


We had the honor and privilege of attending the official Boston East groundbreaking ceremony this past Thursday, May 19th. We would like to extend huge congratulations and thanks to Trinity Financial and East Boston Community Development Corporation on this important milestone. Boston East will enliven the East Boston Waterfront with public amenities including a Harborwalk, art galleries, historic interpretive exhibits and a boat launch in addition to 200 new residential units. Above and below are the latest renderings of Boston East.


Boston-East-Building

View of Boston East from Boston Harbor


Boston-East-View

View of Boston Harbor at sunset from Boston East


Speakers at the Boston East groundbreaking ceremony included Trinity Financial Vice President Abby Goldenfarb, Governor Charlie Baker, Mayor Martin J. Walsh, State Representative Adrian Madaro, City Councillor Sal LaMattina and East Boston Community Development Corporation Executive Director Al Caldarelli.


Boston-East-Abby-Goldenfarb

Trinity Financial Vice President Abby Goldenfarb


Boston-East-Governor-Baker

Governor Charlie Baker


Boston-East-Mayor-Walsh

Mayor Martin J. Walsh


Boston-East-Rep-Madaro

State Representative Adrian Madaro


Boston-East-Councillor-LaMattina

City Councillor Sal LaMattina


Boston-East-Al-Caldarelli

East Boston Community Development Corporation Executive Director Al Caldarelli


Speeches were followed by a ceremonial groundbreaking along the East Boston Waterfront.


Boston-East-Shovel-Fly

Shovels fly at Boston East


Boston-East-Shovels

View of shovels overlooking Boston Harbor


Boston-East-Future-Harborwalk

View from the future Harborwalk at Boston East


Initial site work at Boston East has been underway since February. The six-story building’s sheet pile wall is complete. The sheet pile wall will reinforce the building’s foundation and one-story underground parking structure.


Boston-East-Sheet-Pile-1

Completed sheet pile wall at Boston East's south side


Boston-East-Sheet-Pile-2

Completed sheet pile wall at Boston East's north side


The Boston East building’s foundation is nearly fully dug, and final excavations are taking place.


Boston-East-Piles-Excavation-4

Final excavations underway at Boston East's north side

The construction team is driving concrete piles at the foundation’s base to support the building.


Boston-East-Piles-Excavation-1

The construction team directs a pile driver onto the construction site


Boston-East-Piles-Excavation-2

The construction team moves a concrete pile (gray rod at right) to the pile driver (at left)


Boston-East-Piles-Excavation-3

Base of Boston East's foundation following concrete pile driving. Note bumps in the ground, under which are driven piles.


Concrete will soon be poured along the base and sides of the foundation, enabling construction of the building’s superstructure.


Boston-East-Foundation-Pour

Concrete will be poured along the base and sides of the foundation upon completion of excavation


Boston East is expected to open in fall 2017. Pre-leasing of residences at Boston East has begun, visit bostoneast.com for more information. Below is a video exhibiting Boston East.


Boston East video


More information about Boston East is posted below.


AC Hotel Boston Cleveland Circle
- Apr 25, 2016

J. Derenzo Companies demolishes last section of Circle Cinema


J. Derenzo Companies' JDC Demolition division demolished the last standing section of Circle Cinema early Saturday morning. The way has now been cleared for construction of new hotel and senior housing buildings expected to be complete in 2017. The following is a video by National Development's Ted Tye showing the last standing section's demolition:



Last piece of Circle Cinema comes down this morning during MBTA shutdown.@BostonRedevelop pic.twitter.com/g9nkRt5qqh

— Ted Tye (@tyeguy44) April 23, 2016


Boston East
- Apr 19, 2016

Sheet pile wall foundation under construction at Boston East on East Boston Waterfront


Construction of Boston East's sheet pile wall is moving forward swiftly. The sheet pile wall will reinforce Boston East's foundation and underground parking structure. A 120-car underground garage will be built at Boston East.


Once the sheet pile wall is complete, the construction team will excavate the project's foundation and underground parking structure. Excavation equipment has been parked at the Boston East site including excavators and a dump truck. The following are photographs of the equipment:


Boston-East-Excavation-1   Boston-East-Excavation-2


A blue Mantis 15010 crane is being used to drive the wall's sheet piles into the ground. The following are photographs of the crane driving piles at Boston East:


Boston-East-Mantis-1   Boston-East-Mantis-2


Many sheet piles have already been driven along the Boston East building's future perimeter. The following are photographs of the sheet piles:


Boston-East-Wall-2   Boston-East-Wall-3


As foundation construction progresses at Boston East, timber and earth fill used to originally construct today's East Boston Waterfront is being uncovered. The East Boston Waterfront, like much of Boston, was constructed using land filling techniques to expand the original land area. The following is a photograph of unearthed fill:


Boston-East-Landmaking-1


AC Hotel Boston Cleveland Circle
- Apr 18, 2016

J. Derenzo Companies demolishes former Circle Cinema building


J. Derenzo Companies' JDC Demolition division has just about fully demolished the former Circle Cinema building in Cleveland Circle:


Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-1  Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-2

Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-3  Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-4

Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-5  Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-6

Circle-Cinema-Redevelopment-Project-Chestnut-Hill-Avenue-Boston-Brookline-Cleveland-Circle-National-Development-Cranshaw-Construction-J-Derenzo-Companies-JDC-Demolition-Elkus-Manfredi-Architects-7


The Applebee's restaurant building formerly located on site is completely demolished. All that remains of Circle Cinema is a single former screening room:


Circle-Cinema-Shell-1   Circle-Cinema-Shell-2


Circle Cinema contained seven screening rooms prior to demolition. Virtually the entire theater has been reduced to rubble:


Circle-Cinema-Rubble-1   Circle-Cinema-Rubble-2


The hollowed shell of Circle Cinema is visible from the neighboring ballpark:


Circle-Cinema-Park


Part of the former Circle Cinema parking area remains underneath the remaining screening room:


Circle-Cinema-Parking


The Circle Cinema site presents a unique transit-oriented location abutting an active rapid transit line and within walking distance to multiple public transportation options:


Circle-Cinema-Train


A new hotel building and senior housing building will be built on the Circle Cinema site. Anticipated project completion is in 2017. More information about the Circle Cinema Redevelopment project is posted below.


Treadmark
- Apr 18, 2016

Demolition by J. Derenzo Companies in full swing at Ashmont TOD2


J. Derenzo Companies' JDC Demolition division is hard at work demolishing the former Ashmont Tire building to make way for the Ashmont TOD2 mixed-use development.


Ashmont-Transit-Oriented-Development-TOD-2-Dorchester-Ashmont-MBTA-Red-Line-Station-Peabody-Square-Boston-Residential-Retail-Affordable-Housing-Trinity-Financial-Development-Cranshaw-Construction-J-Derenzo-JDC-Demolition-The-Architectural-Team-1
Demolition underway


Ashmont-Transit-Oriented-Development-TOD-2-Dorchester-Ashmont-MBTA-Red-Line-Station-Peabody-Square-Boston-Residential-Retail-Affordable-Housing-Trinity-Financial-Development-Cranshaw-Construction-J-Derenzo-JDC-Demolition-The-Architectural-Team-2
Demolition underway


Ashmont-Transit-Oriented-Development-TOD-2-Dorchester-Ashmont-MBTA-Red-Line-Station-Peabody-Square-Boston-Residential-Retail-Affordable-Housing-Trinity-Financial-Development-Cranshaw-Construction-J-Derenzo-JDC-Demolition-The-Architectural-Team-3
Demolition underway



Ashmont-Transit-Oriented-Development-TOD-2-Dorchester-Ashmont-MBTA-Red-Line-Station-Peabody-Square-Boston-Residential-Retail-Affordable-Housing-Trinity-Financial-Development-Cranshaw-Construction-J-Derenzo-JDC-Demolition-The-Architectural-Team-5
Demolition underway


JDC Demolition has nearly fully demolished the Ashmont Tire building:


Ashmont-Tire-1
Ashmont Tire


Ashmont-Tire-2
Ashmont Tire


Ashmont-Tire-3
Ashmont Tire


On our visit, we got to watch Mahoney Oil refuel JDC Demolition's demolition excavator:


Excavator-Refueling
Refueling


LM Heavy Civil Construction has also begun digging up existing utilities on site. Cranshaw Construction is the project's general contractor.


The Ashmont TOD2 team secured financing for the project earlier this year, as reported by The Dorchester Reporter. The team hopes to open the building to residents in 2017.


Portside at East Pier Phase Two
- Apr 11, 2016

Foundation under construction at Portside at East Pier Phase Two, new renderings released


New structural piles have been driven at Portside at East Pier—Phase Two. The construction team is now pouring concrete on top of the new pile caps to build foundations for the project's two new buildings. A sheet pile wall has been installed surrounding the project site. Work continues on excavation of the buildings' underground parking structure.


New renderings recently released of the Portside at East Pier—Phase Two project can be found above. The following are photographs of Portside at East Pier Phase Two:


Portside at East Pier Phase Two April 2016


The District Burlington
- Mar 13, 2016

The District Burlington tops off


We had the honor and privilege of attending the topping off ceremony for the Building 7 addition at The District Burlington. Thanks again to National Development and the project team for hosting us! It was exciting to watch the final beam, featuring a distinctive paint job, rise above the project site and come into place on the addition’s fourth floor rooftop. The Building 7 addition topped off on Thursday, February 25th, 2016. The following are photographs from the ceremony:


The District Top Off


The 54,000 square foot addition to Building 7 is being constructed in conjunction with a renovation of the existing structure to create a modern office tower well suited for 21st century innovation. Upon completion, Building 7 will feature naturally lit open workspace with a green roof deck. The Building 7 addition will feature a gleaming glass curtain overlooking lush landscaping and the overall District Burlington development area. A total of 80,000 square feet of new office space will be built at Building 7; the original Building 7 consists of approximately 200,000 square feet of office space.


A walkthrough of the Building 7 project site yielded distinctive features including a backup generator enclosure that will ensure the building is consistently powered:


The-District-Burlington-Backup-Generator
Backup generator enclosure


The District Burlington development is easily accessible by car via Route 128 (America’s Technology Highway) and by public transportation via a shuttle to and from nearby train service.


Much progress has also been made at other parts of The District Burlington. Along District Avenue, Tavern in the Square has opened in a gleaming new retail space. Other retail spaces are nearing completion; these will feature desirable retailers including Island Creek Oyster Bar, Pressed Cafe and TD Bank. A new Residence Inn hotel has also begun construction; developed by Finard Properties, the hotel will feature 170 rooms with amenities including a business center, meeting space and a restaurant. (Note: The hotel site has been acquired by Finard Properties; the hotel's architect is Group One Partners, and the hotel's general contractor is Callahan Construction Managers.)


The District Burlington is redeveloping a 1970s office park into a walkable destination that will attract visitors both during and outside of work hours. New parking structures are under construction to accommodate what will undoubtedly be an influx of visitors to The District Burlington. The glass curtain of the Building 7 addition will be an inviting backdrop to a revitalized, walkable District Avenue.


New retail spaces nearing completion

The District Retail February 2016


Hotel project site

The District Hotel February 2016


AC Hotel Boston Downtown
- Mar 10, 2016

Demolition nearly complete at AC Hotel South End


J. Derenzo Companies' JDC Demolition has nearly fully demolished two low-rise buildings on the AC Hotel South End site. Construction of the future hotel's foundation will soon commence with initial excavation and pre-trenching to prepare the site for pile driving.


AC-Hotel-South-End-Ink-Block-Sepia-Siena-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-JDC-Demolition-1
View of AC Hotel South End site looking towards Downtown Boston


AC-Hotel-South-End-Ink-Block-Sepia-Siena-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-JDC-Demolition-4
Soon-to-be-demolished foundation of a former building


AC-Hotel-South-End-Ink-Block-Sepia-Siena-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-JDC-Demolition-5
Demolition debris


AC-Hotel-South-End-Ink-Block-Sepia-Siena-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-JDC-Demolition-10
Demolition debris


AC-Hotel-South-End-Ink-Block-Sepia-Siena-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-JDC-Demolition-6
View of AC Hotel South End site from Ink Block


AC-Hotel-South-End-Ink-Block-Sepia-Siena-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-JDC-Demolition-8
View of AC Hotel South End site from Ink Block


Ink Block Phase One
- Mar 07, 2016

National Development has announced several exciting new retail options coming to Ink Block along Harrison Avenue in Boston's South End. Per a report by The Boston Globe’s Tim Logan, four new restaurants will soon open at Ink Block in the Phase One and Sepia buildings. These will include:


  • A new cocktail bar developed by Ken Casey, guitarist of The Dropkick Murphys
  • Bar Mezzana, a new Italian restaurant developed by alumni of local restaurant group Barbara Lynch Gruppo
  • A location of local restaurant group JP Fuji, who is also opening a restaurant at under-construction West of Chestnut in Quincy Center
  • A location of salad chain Sweetgreen, who recently opened a location in Fort Point next to soon-to-open Caffe Nero


This spring, the South End Open Market will move across Harrison Avenue from Ink Block. A Harrison Avenue redesign is also in the works with bike lanes, plantings, wider sidewalks and other improvements.


Ink Block site graphic via National Development


Siena, a 76-unit condominium building, and AC Hotel South End, a 200-room hotel, are currently under construction at Ink Block. This spring, construction will commence at 345 Harrison Avenue, located across Harrison Avenue from Ink Block. 345 Harrison Avenue, a mixed-use development by UDR, will contain approximately 577 residential units and 33,500 square feet of retail. Related Beal has also filed a Letter of Intent to construct a residential development at the former Quinzani's Bakery site located across Traveler Street from Ink Block.


Recently, the New York Streets Neighborhood Association was formed in the rapidly-developing neighborhood surrounding Ink Block. The Association’s mission is “to support and advocate for the interests and needs specific to the New York Streets in Boston's South End neighborhood.”


New York Streets Neighborhood Association locale


The following is a list of development projects in the New York Streets Neighborhood Association’s locale:


Under construction:


Approved:


Proposed:


Recently completed:


More information on South End development projects is available on our South End development page.


AC Hotel Boston Downtown
- Feb 26, 2016

J. Derenzo Companies commences demolition at AC Hotel South End


J. Derenzo Companies' JDC Demolition has commenced demolition on the AC Hotel South End site! Work began on Thursday; today, J. Derenzo Companies is demolishing the former taxi dispatch building on site. We are very excited to watch J. Derenzo Companies prepare National Development's AC Hotel South End site for a distinctive building that will bring new energy to a rapidly growing corner of Boston's South End.


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-1
View of demolition from Ink Block


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-2
Piece-by-piece demolition


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-3
Piece-by-piece demolition


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-4
Demolition close-up


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-5
Water spraying during demolition


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-6
Partially demolished building


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-7
Demolition debris


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-8
View of site towards Downtown Boston


AC-Hotel-South-End-Ink-Block-Albany-Street-National-Development-Cranshaw-Construction-J-Derenzo-Company-Demolition-9
View of site towards Troy Boston


AC Hotel Boston Downtown
- Feb 24, 2016

Initial work at AC Hotel South End starting within next 30 days


Demolition on the AC Hotel South End site will begin in approximately 30 days according to a Boston Business Journal report. As shown in our photographs below, construction fencing has already been installed surrounding the AC Hotel South End site.

This week, on Monday, February 22nd, National Development transferred ownership of the AC Hotel South End site from South End Hotel I LLC and South End Hotel II LLC, entities who have controlled AC Hotel South End's land acquisition, to Albany Street Hotel LLC, an entity who controls AC Hotel South End's financing and development. Sale price was $10M. The following is the deed for the transfer:

   


AC Hotel Boston Downtown
- Feb 22, 2016

Construction fencing installed at AC Hotel South End


Construction fencing has been installed surrounding the AC Hotel South End project site. Demolition of the existing buildings on site is anticipated imminently to make way for the construction of a new 200-room hotel. The AC Hotel South End site is located on Albany Street adjacent to the Ink Block development. Both projects are developed by National Development.


AC-Hotel-South-End-National-Development-Ink-Block-Elkus-Manfredi-Architects-VHB-Cranshaw-Construction-2
View of AC Hotel South End site towards Downtown Boston


AC-Hotel-South-End-National-Development-Ink-Block-Elkus-Manfredi-Architects-VHB-Cranshaw-Construction-3
View along Albany Street towards Downtown Boston


AC-Hotel-South-End-National-Development-Ink-Block-Elkus-Manfredi-Architects-VHB-Cranshaw-Construction-4
View from Albany Street towards Ink Block


AC-Hotel-South-End-National-Development-Ink-Block-Elkus-Manfredi-Architects-VHB-Cranshaw-Construction-8
View along Albany Street towards Downtown Boston


The following are pre-construction photographs of the AC Hotel South End site taken in January 2016:


AC-Hotel-by-Marriott-South-End-Ink-Block-National-Development-Cranshaw-Construction-2
View of AC Hotel South End site towards Downtown Boston


AC-Hotel-by-Marriott-South-End-Ink-Block-National-Development-Cranshaw-Construction-1
View along Albany Street towards Downtown Boston


Portside at East Pier Phase Two
- Feb 19, 2016

Foundation preparations are in full force at Phase Two of Portside at East Pier. W. L. French Excavating Corporation is performing initial earthwork, and J. F. White Contracting Company is driving concrete piles. Two buildings are under construction that will contain a total of 296 residential units.


   

   

   

   


Phase One of Portside at East Pier was completed in November 2014:



Expected completion of pile driving at Portside at East Pier—Phase Two is by April 2016. A total of 97 piles will be driven. Construction is expected to last roughly 30 months, with expected completion in Fall 2018.


Portside at East Pier—Phase Two is located at the intersection of Marginal and Bremen streets on the East Boston Waterfront.


Note: Cranshaw Construction has also begun work on Boston East, another East Boston Waterfront residential building.


Boston East
- Feb 19, 2016

Construction commences at Boston East


Construction has commenced at Boston East. LM Heavy Civil Construction is performing initial earthwork to prepare the site for foundation construction. Boston East will be a 200-unit apartment building with ground-floor art gallery space. An extension of the East Boston Harborwalk waterfront park and walking trail will also be built on the Boston East site. The following are photographs of earthwork underway at Boston East:

Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-1   Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-2

Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-4   Boston-East-Waterfront-Trinity-Financial-Cranshaw-Construction-ICON-Architecture-5


Sepia at Ink Block
- Feb 08, 2016

Sepia at Ink Block is complete and occupied.


AC Hotel Boston Cleveland Circle
- Jan 26, 2016

Construction has begun on the Circle Cinema Redevelopment in Cleveland Circle. J. Derenzo Companies will soon begin demolition of the existing Circle Cinema and Applebee's buildings on site. Asbsetos removal and installation of construction fencing started Monday. Cranshaw Construction is managing the Circle Cinema Redevelopment.


The following are photographs of Circle Cinema and the adjacent Applebee's restaurant:


Circle_Cinema_Redevelopment_Project_Chestnut_Hill_Avenue_Boston_Brookline_Cleveland_Circle_National_Development_Cranshaw_Construction_Elkus_Manfredi_Architects_1   Circle_Cinema_Redevelopment_Project_Chestnut_Hill_Avenue_Boston_Brookline_Cleveland_Circle_National_Development_Cranshaw_Construction_Elkus_Manfredi_Architects_2

Circle_Cinema_Redevelopment_Project_Chestnut_Hill_Avenue_Boston_Brookline_Cleveland_Circle_National_Development_Cranshaw_Construction_Elkus_Manfredi_Architects_3   Circle_Cinema_Redevelopment_Project_Chestnut_Hill_Avenue_Boston_Brookline_Cleveland_Circle_National_Development_Cranshaw_Construction_Elkus_Manfredi_Architects_4

Circle_Cinema_Redevelopment_Project_Chestnut_Hill_Avenue_Boston_Brookline_Cleveland_Circle_National_Development_Cranshaw_Construction_Elkus_Manfredi_Architects_5   Circle_Cinema_Redevelopment_Project_Chestnut_Hill_Avenue_Boston_Brookline_Cleveland_Circle_National_Development_Cranshaw_Construction_Elkus_Manfredi_Architects_6


Portside at East Pier Phase Two
- Jan 15, 2016

We are excited to announce that construction has begun on Portside at East Pier—Phase Two! We have word that Cranshaw Construction, the project's General Contractor, will begin driving piles next week. Initial site preparations are currently underway. A pile driver is now parked on site; new signage has been installed by Cranshaw Construction.

   

   

Note: Cranshaw Construction will also soon begin work on Boston East, a 200-apartment East Boston Waterfront development.


Gateway Boston
- Jan 05, 2016

900 Beacon Street's frame has risen to the building's full five levels! Floors have been installed up to the fourth level. New photographs posted.


Boston East
- Dec 24, 2015

Boston East parcel transferred to development team for $2 million


A deed was recorded in the Suffolk County Registry of Deeds on December 23rd, 2015 transferring the parcel at 102-148 Border Street in East Boston from the City of Boston to Trinity Border Street, LLC for $2 million, clearing the way for construction of Boston East. The following is the recorded deed:


   


Trinity Border Street, LLC is a partnership of Trinity Financial, Inc. and the East Boston Community Development Corporation. Boston East is fully approved for construction. The following are photographs of the Boston East site:


Boston_East_Trinity_Financial_Cranshaw_Construction_1   Boston_East_Trinity_Financial_Cranshaw_Construction_2


AC Hotel Boston Cleveland Circle
- Nov 17, 2015

A deed was recorded today in the Suffolk County Registry of Deeds transferring ownership of the Circle Cinema site from National Amusements Inc. to Cleveland Circle Development Associates LLC, an affiliate of National Development and Boston Development Group, for $1. Construction of a new AC Hotel and senior housing on the site is expected to commence in 2016. The following is today's recorded deed:


   

National Development and Boston Development Group, developers of the Cleveland Circle Redevelopment project, acquired the Circle Cinema development site for a total of $9.5 million in November 2014.

The developers closed on the acquisition of the Circle Cinema theater site on November 16th, 2014 for $5.5 million. The following is the deed for the sale recorded in the Norfolk County Registry of Deeds:



The developers closed on the acquisition of the adjacent Applebee's restaurant site on November 26th, 2014 for $4 million. The following is the deed for the sale recorded in the Suffolk County Registry of Deeds:

   


AC Hotels Marriott
- Nov 16, 2015

We visited the under-construction AC Hotel in Medford's Station Landing. Exterior finishes are well on their way to full installation, and the hotel is looking great. View our site photographs above.


Sepia at Ink Block
- Oct 22, 2015

The construction site at Sepia is bustling with activity as Sepia, Ink Block's first condominium tower, nears completion. Check out our recent photographs of Sepia above.


Treadmark
- Apr 30, 2015

Ashmont TOD2 fully approved for construction


On March 10th, 2015, Ashmont TOD2 was approved by the City of Boston's Zoning Board of Appeals. Ashmont TOD2 was approved by the Boston Redevelopment Authority on February 26th, 2015 and will be built on the site of the existing Ashmont Tire facility. Ashmont Tire is located across Dorchester Avenue from the Ashmont MBTA Red Line station in Dorchester's Ashmont neighborhood. Having received all necessary approvals, Ashmont TOD2 is now ready to move forward with construction.

The following are photographs of Ashmont Tire:

Ashmont-Tire-Building-1
Ashmont Tire at Fuller Street


Ashmont-Tire-Building-2
Ashmont Tire along Dorchester Avenue


Thought Leadership

No new thoughts. Inquire about becoming a thought leader by clicking here

Headquarters

To unlock, this organization must be verified.

Please click here to verify >>